Use of Coal Drying to Reduce Water Consumed in Pulverized Coal Power Plants Quarterly Report: October-December 2004 (open access)

Use of Coal Drying to Reduce Water Consumed in Pulverized Coal Power Plants Quarterly Report: October-December 2004

This is the eighth Quarterly Report for this project. The background and technical justification for the project are described, including potential benefits of reducing fuel moisture, prior to firing in a pulverized coal boiler. Analyses were performed to determine the effects of coal product moisture on unit performance. Results are given showing how the coal product moisture level affects parameters such as boiler efficiency, power required to drive the fluidizing air fan, other station service power needed for fans and pulverizers, net unit heat rate, thermal energy rejected by the cooling tower, and stack emissions.
Date: March 1, 2005
Creator: Sarunac, Nenad & Levy, Edward
System: The UNT Digital Library