Language
3 Matching Results
Results open in a new window/tab.
Results:
1 - 3 of
3
Routine Testing and Calibration Procedures for Multichannel Pulse Analyzers and Gamma-Ray Spectrometers
Report describing the results of laboratory tests with procedures for calibration of equipment and performance requirements.
Date:
November 1, 1963
Creator:
Crouch, D. F. & Heath, R. L.
System:
The UNT Digital Library
MTR Technical Branch Quarterly Report, Third Quarter
Quarterly report for the technical branch of the Materials Testing Reactor of Idaho. Includes current developments and experiments.
Date:
November 1, 1956
Creator:
Conner, W. P.
System:
The UNT Digital Library
Summary of the Spert-I, -II, and -III reactor facilities
Report containing "[a] brief description and design data summary of each of the SPERT Reactor Facilities is presented. Engineering, operating, and physics data are tabulated for use as basic references" (p. 3)
Date:
November 1, 1957
Creator:
Montgomery, C. R.; Norberg, J. A. & Wilson, T. R.
System:
The UNT Digital Library