In-Pile Slurry Loop Program (open access)

In-Pile Slurry Loop Program

The in-plie slurry loop work is now being considered as a joint program between the PAR project and ORNL. It is proposed that PAR design, fabricate and test the in-pile loops and that ORNL operate the loops in-pile, dismantle the loops after irradiation and made the appropriate measurements to determine the radiation effects. This report gives the objects of the slurry in-pile program and outlines the facilities and operations required to execute ORNL's part of this program.
Date: March 8, 1957
Creator: Arehart, T. A.; Compere, E. L. (Edgar L.); Ferguson, D. E.; Korsmeyer, R. B. & McBride, J. P.
System: The UNT Digital Library
Chemical Technology Division Pilot Plant Section Report for November, 1950- January, 1951 (open access)

Chemical Technology Division Pilot Plant Section Report for November, 1950- January, 1951

Technical report presenting a summary of the flowsheets, equipment, and progress for the Oak Ridge National Laboratory (ORNL) pilot plant development of the Purex Process and of the ORNL Metal Recovery Program. As of this report, conversion of the Purex pilot plant equipment in Buildings 3019 and 3503 is 90% complete. The building structure for the ORNL Waste Metal Recovery plant had been completed, and 15% of the process equipment had been installed. The first hot runs for this plant were scheduled for June, 1951. [From Abstract; Introduction]
Date: March 8, 1951
Creator: Jackson, H. K.