6,625 Matching Results

Results open in a new window/tab.

2" Sea Chest Discharge

Blueprint depicting technical details of Battleship Texas.
Date: March 28, 1917
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History

4" Low Pressure Strainer for Fuel Oil [Body & Assembly]

Blueprint depicting technical details of Battleship Texas.
Date: March 28, 1927
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History

4" Low Pressure Strainer for Fuel Oil [Details]

Blueprint depicting technical details of Battleship Texas.
Date: March 28, 1927
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History

6" Standard High Lift Sea Valve Pressures 0 - 100 Lbs.

Blueprint depicting technical details of Battleship Texas.
Date: March 28, 1926
Creator: unknown
Object Type: Technical Drawing
System: The Portal to Texas History
200 Area Deactivation Project Facilities Authorization Envelope Document (open access)

200 Area Deactivation Project Facilities Authorization Envelope Document

Project facilities as required by HNF-PRO-2701, Authorization Envelope and Authorization Agreement. The Authorization Agreements (AA's) do not identify the specific set of environmental safety and health requirements that are applicable to the facility. Therefore, the facility Authorization Envelopes are defined here to identify the applicable requirements. This document identifies the authorization envelopes for the 200 Area Deactivation.
Date: March 28, 2000
Creator: Dodd, E. N.
Object Type: Report
System: The UNT Digital Library
327 Building liquid waste handling options modification project plan (open access)

327 Building liquid waste handling options modification project plan

This report evaluates the modification options for handling radiological liquid waste (RLW) generated during decontamination and cleanout of the 327 Building. The overall objective of the 327 Facility Stabilization Project is to establish a passively safe and environmentally secure configuration of the 327 Facility. The issue of handling of RLW from the 327 Facility (assuming the 34O Facility is not available to accept the RLW) has been conceptually examined in at least two earlier engineering studies (Parsons 1997a and Hobart l997). Each study identified a similar preferred alternative that included modifying the 327 Facility RLWS handling systems to provide a truck load-out station, either within the confines of the facility or exterior to the facility. The alternatives also maximized the use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes. An issue discussed in each study involved the anticipated volume of the RLW stream. Estimates ranged between 113,550 and 387,500 liters in the earlier studies. During the development of the 324/327 Building Stabilization/Deactivation Project Management Plan, the lower estimate of approximately 113,550 liters was confirmed and has been adopted as the baseline for the 327 Facility RLW stream. The goal of this engineering study …
Date: March 28, 1998
Creator: Ham, J.E.
Object Type: Report
System: The UNT Digital Library
15th Street News (Midwest City, Okla.), Vol. 26, No. 23, Ed. 1 Friday, March 28, 1997 (open access)

15th Street News (Midwest City, Okla.), Vol. 26, No. 23, Ed. 1 Friday, March 28, 1997

Newspaper from Rose State College in Midwest City, Oklahoma that includes national, local, and campus news along with advertising.
Date: March 28, 1997
Creator: Easttom, Holly
Object Type: Newspaper
System: The Gateway to Oklahoma History
15th Street News (Midwest City, Okla.), Vol. 32, No. 22, Ed. 1 Friday, March 28, 2003 (open access)

15th Street News (Midwest City, Okla.), Vol. 32, No. 22, Ed. 1 Friday, March 28, 2003

Newspaper from Rose State College in Midwest City, Oklahoma that includes national, local, and campus news along with advertising.
Date: March 28, 2003
Creator: Baldwin, Alisha
Object Type: Newspaper
System: The Gateway to Oklahoma History
15th Street News (Midwest City, Okla.), Vol. 37, No. 22, Ed. 1 Friday, March 28, 2008 (open access)

15th Street News (Midwest City, Okla.), Vol. 37, No. 22, Ed. 1 Friday, March 28, 2008

Newspaper from Rose State College in Midwest City, Oklahoma that includes national, local, and campus news along with advertising.
Date: March 28, 2008
Creator: Pace, Joshua
Object Type: Newspaper
System: The Gateway to Oklahoma History
1964 computer run on a laser-imploded capsule (open access)

1964 computer run on a laser-imploded capsule

WAZER Alchemy 7b (WA-7b) is a WAZER calculation of a laser-driven micro-implosion of a spherical capsule consisting of a thin gold pusher surrounded by a thick (frozen) deuterium ablator. The properties of the target capsule and the shape of the laser pulse used to irradiate it are described.
Date: March 28, 1973
Creator: Kidder, Ray E.
Object Type: Report
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 20 MAY 05 DON-0165R V4 S AND S REMOVED (open access)

2005 BRAC Commission Final COBRA Run - 20 MAY 05 DON-0165R V4 S AND S REMOVED

20 MAY 05 DON-0165R V4 S AND S REMOVED - 57 - Marine Corps Logistics Base, Barstow, CA
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 38 - RC Transformation in Oklahoma\AFRC ECS Ft Sill (open access)

2005 BRAC Commission Final COBRA Run - 38 - RC Transformation in Oklahoma\AFRC ECS Ft Sill

2005 BRAC Commission Final COBRA Run - 38 - RC Transformation in Oklahoma\AFRC ECS Ft Sill - 38 - RC Transformation in Oklahoma\AFRC ECS Ft Sill
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 121 - CSS Center (Lee) integrated 05-19-05 (open access)

2005 BRAC Commission Final COBRA Run - 121 - CSS Center (Lee) integrated 05-19-05

2005 BRAC Commission Final COBRA Run - 121 - Combat Service Support Center
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 121 - TAB 3 0016 (open access)

2005 BRAC Commission Final COBRA Run - 121 - TAB 3 0016

2005 BRAC Commission Final COBRA Run - 121 - TAB 3 0016 - 123 - Joint Center of Excellence for Culinary Training
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 133 To Ft. Lee only (open access)

2005 BRAC Commission Final COBRA Run - 133 To Ft. Lee only

2005 BRAC Commission Final COBRA Run - 133 To Ft. Lee only - 133 Lease space - ft lee only - 133R - Co-locate Misc OSD, Defense Agency,
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 137 part 1 no change (open access)

2005 BRAC Commission Final COBRA Run - 137 part 1 no change

2005 BRAC Commission Final COBRA Run - 137 part 1 no change - 137A - Consolidate CPOs\Part 1.
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 137 part 2 corrected-No Rock Island, Stennis (open access)

2005 BRAC Commission Final COBRA Run - 137 part 2 corrected-No Rock Island, Stennis

2005 BRAC Commission Final COBRA Run - 137 part 2 corrected-No Rock Island, Stennis - 137A - Consolidate CPOs\Part 2.
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 0402_S&S-043R_21.2.1.0.6U (open access)

2005 BRAC Commission Final COBRA Run - 0402_S&S-043R_21.2.1.0.6U

2005 BRAC Commission Final COBRA Run - 0402_S&S-043R_21.2.1.0.6U - 175 - Commodity Management Privatization
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 0402_SS-043R_21.2.1.0.6U (open access)

2005 BRAC Commission Final COBRA Run - 0402_SS-043R_21.2.1.0.6U

2005 BRAC Commission Final COBRA Run - 0402_SS-043R_21.2.1.0.6U - 175 - Commodity Management Privatization
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 0404_S&S-051R_20.1.8.0.13U (open access)

2005 BRAC Commission Final COBRA Run - 0404_S&S-051R_20.1.8.0.13U

2005 BRAC Commission Final COBRA Run - 0404_S&S-051R_20.1.8.0.13U - 142R - Consolidate Transportation Command Centers\177 - Supply, Storage, and Distribution Management Reconfiguration.
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 2005 BRAC Commission Final COBRA Run (open access)

2005 BRAC Commission Final COBRA Run - 2005 BRAC Commission Final COBRA Run

2005 BRAC Commission Final COBRA Run - 77 - Navy Reserve Readiness Commands
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 64C Realign DON-0158AR V6.10, 22APR05 (open access)

2005 BRAC Commission Final COBRA Run - 64C Realign DON-0158AR V6.10, 22APR05

64C Realign DON-0158AR V6.10, 22APR05 - 64C - Naval Support Activity New Orleans No milcon
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 66C Mod DON-0157R V6.10, 20APR05 (open access)

2005 BRAC Commission Final COBRA Run - 66C Mod DON-0157R V6.10, 20APR05

66C Mod DON-0157R V6.10, 20APR05 - 66C - Marine Corps Support Activity KC, MO
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library
2005 BRAC Commission Final COBRA Run - 7B - Realign Red River adj Milcon (open access)

2005 BRAC Commission Final COBRA Run - 7B - Realign Red River adj Milcon

2005 BRAC Commission Final COBRA Run - 7B - Realign Red River adj Milcon - 7B - Red River
Date: March 28, 2006
Creator: United States. Defense Base Closure and Realignment Commission.
Object Type: Text
System: The UNT Digital Library