The 0.22 Percent Across-the-Board Cut in FY2001 Appropriations (open access)

The 0.22 Percent Across-the-Board Cut in FY2001 Appropriations

Report describing changes that affected the government budget for the 2001 fiscal year under the Consolidated Appropriations Act.
Date: May 31, 2001
Creator: Keith, Robert
System: The UNT Digital Library
A 1.5 Mwe Thermionic Reactor Space Power System (open access)

A 1.5 Mwe Thermionic Reactor Space Power System

None
Date: October 31, 1966
Creator: Smith, C. K. & Parkinson, R. Y.
System: The UNT Digital Library
3-D turbulent particle dispersion submodel development. Quarterly progress report No. 1, 5 April--5 July 1991 (open access)

3-D turbulent particle dispersion submodel development. Quarterly progress report No. 1, 5 April--5 July 1991

The lack of a mathematical description of the interactions of fluid turbulence with other physics-chemical processes is a major obstacle in modeling many industrial program. Turbulent two-phase flow is a phenomenon that is of significant practical importance to coal combustion as well as other disciplines. The interactions of fluid turbulence with the particulate phase has yet to be accurately and efficiently modeled for these industrial applications. On 15 May 1991 work was initiated to cover four major tasks toward the development of a computational submodel for turbulent particle dispersion that would be applicable to coal combustion simulations. Those four tasks are: 1. A critical evaluation of the 2-D Lagrangian particle dispersion submodel, 2. Development of a 3-D submodel for turbulent particle dispersion, 3. Evaluation of the 3-D submodel for turbulent particle dispersion, 4.Exploration of extensions of the Lagrangian dispersion theory to other applications including chemistry-turbulence interactions.
Date: December 31, 1991
Creator: Smith, P. J.
System: The UNT Digital Library
3-D turbulent particle dispersion submodel development. Quarterly progress report No. 2, 15 July--15 October 1991 (open access)

3-D turbulent particle dispersion submodel development. Quarterly progress report No. 2, 15 July--15 October 1991

The lack of a mathematical description of the interactions of fluid turbulence with other physics-chemical processes is a major obstacle in modeling many industrial program. Turbulent two-phase flow is a phenomenon that is of significant practical importance to coal combustion as well as other disciplines. The interactions of fluid turbulence with the particulate phase has yet to be accurately and efficiently modeled for these industrial applications. On 15 May 1991 work was initiated to cover four major tasks toward the development of a computational submodel for turbulent particle dispersion that would be applicable to coal combustion simulations. Those four tasks are: 1. A critical evaluation of the 2-D Lagrangian particle dispersion submodel, 2. Development of a 3-D submodel for turbulent particle dispersion, 3. Evaluation of the 3-D submodel for turbulent particle dispersion, 4. Exploration of extensions of the Lagrangian dispersion theory to other applications including chemistry-turbulence interactions.
Date: December 31, 1991
Creator: Smith, P. J.
System: The UNT Digital Library
4-D High-Resolution Seismic Reflection Monitoring of Miscible CO2 Injected into a Carbonate Reservoir (open access)

4-D High-Resolution Seismic Reflection Monitoring of Miscible CO2 Injected into a Carbonate Reservoir

The objective of this research project is to acquire, process, and interpret multiple high-resolution 3-D compressional wave and 2-D, 2-C shear wave seismic data in an attempt to observe changes in fluid characteristics in an oil field before, during, and after the miscible carbon dioxide (CO{sub 2}) flood that began around December 1, 2003, as part of the DOE-sponsored Class Revisit Project (DOE DE-AC26-00BC15124). Unique and key to this imaging activity is the high-resolution nature of the seismic data, minimal deployment design, and the temporal sampling throughout the flood. The 900-m-deep test reservoir is located in central Kansas oomoldic limestones of the Lansing-Kansas City Group, deposited on a shallow marine shelf in Pennsylvanian time. After 30 months of seismic monitoring, one baseline and eight monitor surveys clearly detected changes that appear consistent with movement of CO{sub 2} as modeled with fluid simulators and observed in production data.
Date: August 31, 2006
Creator: Miller, Richard D.; Raef, Abdelmoneam E.; Byrnes, Alan P. & Harrison, William E.
System: The UNT Digital Library
8. Innovative Technologies: Two-Phase Heat Transfer in Water-Based Nanofluids for Nuclear Applications Final Report (open access)

8. Innovative Technologies: Two-Phase Heat Transfer in Water-Based Nanofluids for Nuclear Applications Final Report

Abstract Nanofluids are colloidal dispersions of nanoparticles in water. Many studies have reported very significant enhancement (up to 200%) of the Critical Heat Flux (CHF) in pool boiling of nanofluids (You et al. 2003, Vassallo et al. 2004, Bang and Chang 2005, Kim et al. 2006, Kim et al. 2007). These observations have generated considerable interest in nanofluids as potential coolants for more compact and efficient thermal management systems. Potential Light Water Reactor applications include the primary coolant, safety systems and severe accident management strategies, as reported in other papers (Buongiorno et al. 2008 and 2009). However, the situation of interest in reactor applications is often flow boiling, for which no nanofluid data have been reported so far. In this project we investigated the potential of nanofluids to enhance CHF in flow boiling. Subcooled flow boiling heat transfer and CHF experiments were performed with low concentrations of alumina, zinc oxide, and diamond nanoparticles in water (≤ 0.1 % by volume) at atmospheric pressure. It was found that for comparable test conditions the values of the nanofluid and water heat transfer coefficient (HTC) are similar (within 20%). The HTC increased with mass flux and heat flux for water and nanofluids alike, …
Date: July 31, 2009
Creator: Buongiorno, Jacopo & Hu, Lin-wen
System: The UNT Digital Library
10 MMBt/Hr AFBC Commercial Demonstration Cedar Lane Farms (open access)

10 MMBt/Hr AFBC Commercial Demonstration Cedar Lane Farms

The objective of this project was to demonstrate and promote the commercialization of coal-fired atmospheric fluidized bed combustion (AFBC) systems, with limestone addition for SO2 emissions control and a baghouse for particulate emissions control. This AFBC system was targeted for small scale industrial-commercial-institutional space and process heat applications in the 4-40 MMBtu/hr size range. A cost effective and environmentally acceptable AFBC technology in this size range could displace a considerable amount of heating gas and oil with coal, while resulting in significant total cost savings to the owner/operators.
Date: October 31, 2005
Creator: Keener, Harold M.; Wicks, Mary H.; Machamer, Tom; Hoecke, Dave; Bonk, Don & Brown, Bob
System: The UNT Digital Library
12-INCH SODIUM FLOW CONTROLLER. Technical Manual 20357 (open access)

12-INCH SODIUM FLOW CONTROLLER. Technical Manual 20357

A manual is presented for the Sodium Flow Controller used in controlling flow to regulate heat transfer in a liquid metal nuclear power plant. A description of the controller, general installation and operational pointers, installation instructions, instructions for dismantling of the Sodium Flow Controller, instructions for assembly of Sodium Flow Controller, list of special tools and fixtures, and repair parts list are given. (M.C.G.)
Date: October 31, 1962
Creator: unknown
System: The UNT Digital Library
16,000-rpm Interior Permanent Magnet Reluctance Machine with Brushless Field Excitation (open access)

16,000-rpm Interior Permanent Magnet Reluctance Machine with Brushless Field Excitation

The reluctance interior permanent magnet (RIPM) motor is currently used by many leading auto manufacturers for hybrid vehicles. The power density for this type of motor is high compared with that of induction motors and switched reluctance motors. The primary drawback of the RIPM motor is the permanent magnet (PM) because during high-speed operation, the fixed PM produces a huge back electromotive force (emf) that must be reduced before the current will pass through the stator windings. This reduction in back-emf is accomplished with a significant direct-axis (d-axis) demagnetization current, which opposes the PM's flux to reduce the flux seen by the stator wires. This may lower the power factor and efficiency of the motor and raise the requirement on the alternate current (ac) power supply; consequently, bigger inverter switching components, thicker motor winding conductors, and heavier cables are required. The direct current (dc) link capacitor is also affected when it must accommodate heavier harmonic currents. It is commonly agreed that, for synchronous machines, the power factor can be optimized by varying the field excitation to minimize the current. The field produced by the PM is fixed and cannot be adjusted. What can be adjusted is reactive current to the …
Date: October 31, 2007
Creator: Hsu, J. S.; Burress, T. A.; Lee, S. T.; Wiles, R. H.; Coomer, C. L.; McKeever, J.W. et al.
System: The UNT Digital Library
30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System (open access)

30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System

Final design for the 30 megawatt intermediate heat exchanger and steam generator.
Date: January 31, 1962
Creator: Alco Products (Firm)
System: The UNT Digital Library
40-MW(e) Prototype High-Temperature Gas-Cooled Reactor Research and Development Program. Quarterly Progress Report for the Period Ending June 30, 1962 (open access)

40-MW(e) Prototype High-Temperature Gas-Cooled Reactor Research and Development Program. Quarterly Progress Report for the Period Ending June 30, 1962

Research and development progress specifically directed toward the construction of a 40-Mw(e) prototype power plant employing a high-temperature, gas-cooled, graphitemoderated reactor known as the HTGR is reported. Irradiation of element III-B in the in-pile loop continued satisfactorily. The element has generated a total of l36.3 Mw-hr of fission heat. The gross activity in the purge stream increased slightly to about 350 mu C/cm/sup 3/. By taking larger gas samples than were previously taken, a value of 0.02 VC/cm/sup 3/ was obtained for the gross activity of the primary loop. Element III-A, which was removed from the loop after generating 133 Mw-hr of fission heat, was disassembled and examined. No fuel-compact damage of any type was visible. Determination of the distribution of fission products in the element is under way, Fissionproduct- release data for in-pile-loop element III-A were calculated. During the 133 Mw- hr of operation, the release fraction increased by approximately one order of magnitude. Also calculated were the xenon and krypton release data for the first 100 Mw-hr of III-B operation. The release rate for the longer-lived isotopes increased bv about a factor of 10 and that of the shorter-lived isotopes by about a factor of 100. A test …
Date: October 31, 1963
Creator: unknown
System: The UNT Digital Library
45 Day safety screen results for Tank 241-C-108 -- Augers 94-012, 94-014 and 94-015 (open access)

45 Day safety screen results for Tank 241-C-108 -- Augers 94-012, 94-014 and 94-015

Three auger samples from Tank C-108 (on the Ferrocyanide Watch List) were received by the 222-S laboratories. These samples underwent safety screening analysis (DSC, TGA, and Alpha Total) in accordance with reference below. No results exceeded the notification criteria. Due to the calculated depth of sludge at riser 7, two augers were used to sample the sludge. The first (94-AUG-012) was a ten inch auger, the second (94-AUG-014) was a 20 inch auger. One 20 inch auger (94-AUG-015) was used to sample the tank C-108 contents at riser 4. Results are compiled in this report.
Date: January 31, 1995
Creator: Rice, A. D.
System: The UNT Digital Library
60-Day waste compatibility safety issues and final results for AY-102 grab samples (open access)

60-Day waste compatibility safety issues and final results for AY-102 grab samples

Four grab samples (2AY-96-15, 2AY-96-16, 2AY-96-17, and 2AY-96-18) were taken from Riser 15D of Tank 241-AY-102 on October 8, 1996, and received by 222-S Laboratory on October 8, 1996. These samples were analyzed in accordance with Compatibility Grab Sampling and Analysis Plan (TSAP) and Data Quality Objectives for Tank Farms Waste Compatibility Program (DQO) in support of the Waste Compatibility Program. No notifications were required based on sample results.
Date: January 31, 1997
Creator: Nuzum, Jennifer L.
System: The UNT Digital Library
84-Kilometer Radiological Monitoring Grid (open access)

84-Kilometer Radiological Monitoring Grid

The purpose of this report is to document the development of a radial grid that is suitable for evaluating the pathways and potential impacts of a release of radioactive materials to the environment within a distance of 84 kilometers.
Date: July 31, 2000
Creator: Roe, L.
System: The UNT Digital Library
100 Areas: (For technical progress letter No. 99), May 21--May 27 (open access)

100 Areas: (For technical progress letter No. 99), May 21--May 27

This report details 100 Area reactor operation for the time period of May 21 through May 27, 1946.
Date: May 31, 1946
Creator: Jordan, W. E.
System: The UNT Digital Library
100 LPW 800 Lm Warm White LED (open access)

100 LPW 800 Lm Warm White LED

An illumination grade warm white (WW) LED, having correlated color temperature (CCT) between 2800 K and 3500K and capable of producing 800 lm output at 100 lm/W, has been developed in this program. The high power WW LED is an ideal source for use as replacement for incandescent, and Halogen reflector and general purpose lamps of similar lumen value. Over the two year period, we have made following accomplishments: developed a high power warm white LED product and made over 50% improvements in light output and efficacy. The new high power WW LED product is a die on ceramic surface mountable LED package. It has four 1x1 mm{sup 2} InGaN pump dice flip chip attached to a ceramic submount in 2x2 array, covered by warm white phosphor ceramic platelets called Lumiramic™ and an overmolded silicone lens encapsulating the LED array. The performance goal was achieved through breakthroughs in following key areas: (1) High efficiency pump LED development through pump LED active region design and epi growth quality improvement (funded by internal programs). (2) Increase in injection efficiency (IE) represented by reduction in forward voltage (V{sub f}) through the improvement of the silver-based p-contact and a reduction in spreading resistance. The …
Date: October 31, 2010
Creator: Sun, Decai
System: The UNT Digital Library
100-N technical manual. Volume 2A: Systems descriptions (open access)

100-N technical manual. Volume 2A: Systems descriptions

This report contains engineering drawings for the control room, reactor monitoring systems, and reactor control systems for the N reactor. Each console in the control room is detailed. Other systems discussed are: stack air monitoring system, charging machine control systems, and heating and ventilation control systems. A N reactor plant glossary is included.
Date: December 31, 1963
Creator: unknown
System: The UNT Digital Library
101-SY Dome pressure issues surrounding mitigation pump decontamination during removal (open access)

101-SY Dome pressure issues surrounding mitigation pump decontamination during removal

This document addresses issues related to use of the spraywands and ring used to decontaminate the mitigation pump installed in 101-SY. It has been determined that use of the wands will influence tank dome pressures as a function of ventilation system configuration, spray drop size, rinse water temperature, and rate at which spraywand flows are established.
Date: January 31, 1995
Creator: Shaw, S.W.
System: The UNT Digital Library
105 K East isolation barrier acceptance analysis report (open access)

105 K East isolation barrier acceptance analysis report

The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KE/100K. The tests were performed in accordance with the test plan (McCracken 1995c) and acceptance test procedure (McCracken 1995a). The test report (McCracken 1995b) contains the test data. This document compares the test data (McCracken 1995b) against the criteria (McCracken 1995a, c). A discussion of the leak rate analytical characterization (Irwin 1995) describes how the flow characteristics and the flow rate will be determined using the test data from the test report (McCracken 1995b). The barriers must adequately control the leakage from the main basin to the discharge chute to less than the 1,500 gph (5,680 lph) Safety Analysis Report (SAR 1994) limit.
Date: May 31, 1995
Creator: McCracken, K. J. & Irwin, J. J.
System: The UNT Digital Library
105-N basin sediment disposition phase-two sampling and analysis plan (open access)

105-N basin sediment disposition phase-two sampling and analysis plan

The sampling and analysis plan for Phase 2 of the 105-N Basin sediment disposition task defines the sampling and analytical activities that will be performed to support characterization of the sediment and selection of an appropriate sediment disposal option.
Date: December 31, 1997
Creator: unknown
System: The UNT Digital Library
AN-107 entrained solids - Solubility versus temperature (open access)

AN-107 entrained solids - Solubility versus temperature

This report describes the results of a test conducted by Battelle to assess the solubility of the solids entrained in the diluted AN-107 low-activity waste (LAW) sample. BNFL requested Battelle to dilute the AN-107 sample using sodium hydroxide and de-ionized water to mimic expected plant operating conditions. BNFL further requested Battelle to assess the solubility of the solids present in the diluted AN-107 sample versus temperature conditions of 30, 40, and 50 C. BNFL requested these tests to assess the composition of the LAW supernatant and solids versus expected plant-operating conditions.
Date: March 31, 2000
Creator: Lumetta, Gregg J. & Lettau, Ralph C.
System: The UNT Digital Library
120-D-1 (100-D) ponds training plan (open access)

120-D-1 (100-D) ponds training plan

This is the Environmental Restoration Contractor Team training plan for the 100-D Ponds treatment, storage, and disposal unit. This plan is intended to meet the requirements of WAC 173-303-330 and the Hanford Dangerous Waste Permit. The WAC 173-303-330(1)(d)(ii, v, vi) requires that personnel be familiar, where applicable, with waste feed cut-off systems, proper responses to groundwater contamination incidents, shutdown of operations, response to fire or explosion, and other process operation activities.
Date: December 31, 1997
Creator: Mitchem, G. B.
System: The UNT Digital Library