Language
3 Matching Results
Results open in a new window/tab.
Results:
1 - 3 of
3
High-beta tokamak research. Quarterly status report, 1 October--31 December 1978. [Torus 1 and Torus 2 diagnostics]
Research activity on the Torus 1 and Torus 2 projects is summarized. The diagnostic system for Torus 2 is briefly discussed.
Date:
December 22, 1978
Creator:
Stone, P.
System:
The UNT Digital Library
Billings Shipping Corporation: Freight Distribution Facility, Billings, Montana. Final technical report
The office portion of the building is 4900 ft/sup 2/. The active hydronic space heating system uses 1890 ft/sup 2/ of flat plate air-to-water solar collectors and has 2500 gallons of storage capacity. Included here are the acceptance test plan, operation and maintenance, operating mode table, pictures, and system performance data. (MHR)
Date:
December 22, 1978
Creator:
unknown
System:
The UNT Digital Library
3X CPC Solar Collector. Technical Progress Report, May 7-November 7, 1978
This report documents the technical progress through the first six months of this one-year program under DoE Contract which was effective 1 May 1978.
Date:
December 22, 1978
Creator:
Ballheim, Robert W.
System:
The UNT Digital Library