Hanford Works monthly report, December 1950 (open access)

Hanford Works monthly report, December 1950

This is a progress report of the production reactors on the Hanford Reservation for the month of December 1950. This report takes each division (e.g., manufacturing, medical, accounting, occupational safety, security, reactor operations, etc.) of the site and summarizes its accomplishments and employee relations for that month.
Date: January 22, 1951
Creator: Prout, G. R.
System: The UNT Digital Library
Health-Physics Monthly Information Report. July 1951 (open access)

Health-Physics Monthly Information Report. July 1951

None
Date: August 22, 1951
Creator: Bradley, J. E. & Burbage, J. J.
System: The UNT Digital Library
Increased process water pressure to 105 buildings (open access)

Increased process water pressure to 105 buildings

This document discusses increases in water pressure from the 190 Building process pumps which has been contemplated for a range of pressures up to 550 PSIG. The existing process pumps are dual units, consisting of a steam turbine driven primary pump operated: in series with an electric driven secondary pump. The secondary pumps installed in 100-B, D, F, and H Areas were designed for 400 PSIG working pressure, and were given factory hydrostatic tests of 600 PSIG. The 100-DR pumps were given factory hydrostatic tests of 650 PSIG. The Ingersoll-Rand Company advises that a working pressure of 425 PSIG is as high as they would-recommend for pump casing pressure on the secondary pumps. In consideration of problems incident to increased operating pressures, the immediate limiting factor is the total head pressure permissible on secondary pump casings. Other limiting factors are filter plant capacities, and 183 process water capacities.
Date: February 22, 1951
Creator: Measly, H. F.
System: The UNT Digital Library