100 Areas technical activities report: Physics, July 1949 (open access)

100 Areas technical activities report: Physics, July 1949

The pile physics group reports on reactivity power coefficients from the production test No. 105-248-P, the water leak in B pile, graphite properties, xenon equations from the B pile shutdown of March 1946, and reactivity balance. The experimental physics group headed by J.M. West reports on graphite testing, the P-11 project, and shielding. The experimental physics group headed by E.B. Montgomery reports on diffusion length measurements in the DR and H piles. (GHH)
Date: August 22, 1949
Creator: Staebler, U. M.
System: The UNT Digital Library
234-5 Remote mechanical line design bases and schedules (open access)

234-5 Remote mechanical line design bases and schedules

None
Date: August 22, 1949
Creator: Gross, C.N.
System: The UNT Digital Library