100 Areas technical activities report: Physics, July 1949
The pile physics group reports on reactivity power coefficients from the production test No. 105-248-P, the water leak in B pile, graphite properties, xenon equations from the B pile shutdown of March 1946, and reactivity balance. The experimental physics group headed by J.M. West reports on graphite testing, the P-11 project, and shielding. The experimental physics group headed by E.B. Montgomery reports on diffusion length measurements in the DR and H piles. (GHH)
Date:
August 22, 1949
Creator:
Staebler, U. M.
System:
The UNT Digital Library
234-5 Remote mechanical line design bases and schedules
None
Date:
August 22, 1949
Creator:
Gross, C.N.