Language
1 Matching Results
Results open in a new window/tab.
Results:
1 - 1 of
1
100-F area unit purge, May 3, 1945
This report discusses the pressure drop on the 100-F unit, as measured on the eight pressure drop tubes, which had increased to 24 lbs./in.{sup 2} above base by May 2. The unit was shut down on May 3 to purge with 50 ppm solids for 1.1 hr. and to take care of necessary maintenance work.
Date:
May 22, 1945
Creator:
Kiddker, C. P.
System:
The UNT Digital Library