Carbide Fuel Development: Phase 1 Report, Period of May 15 to September 15, 1959 (open access)

Carbide Fuel Development: Phase 1 Report, Period of May 15 to September 15, 1959

From foreword: This report describes the work accomplished including the Conceptual Design task and the initial results of the tasks on Facility Design and Fabrication, Fuel Fabrication and Evaluation, and Fuel Reprocessing.
Date: October 15, 1959
Creator: Bolomey, R.; Lazerus, S.; Sapir, J.; Sofer, G.; Steinmetz, H.; Strasser, A. et al.
System: The UNT Digital Library
Conceptual Design and Economic Evaluation of a Steam-Cooled Fast Breeder Reactor (open access)

Conceptual Design and Economic Evaluation of a Steam-Cooled Fast Breeder Reactor

From abstract: This report describes a conceptual design and economic evaluation of 300 and 40 MWe steam-cooled fast breeder reactor power plants performed by NDA under contract with the AEC.
Date: November 15, 1961
Creator: Sofer, G.; Hankel, R.; Goldstein, L. & Birman, G.
System: The UNT Digital Library