Resource Type

States

Language

138 Matching Results

Results open in a new window/tab.

Galveston Area (ARMS-II) (open access)

Galveston Area (ARMS-II)

Report describing an Aerial Radiological Measuring Survey (ARMS) of the Galveston Area between Jan. 27 and Feb. 17, 1962. The survey was part of a nationwide program to measure present environmental levels of gamma radiation. Aerial measurements of ground radioactivity were consistent everywhere with what was expected considering the geology of the area.
Date: January 15, 1963
Creator: Guillou, R. B.
System: The UNT Digital Library
Influence of a Sector Ground Screen on the Field of a Vertical Antenna (open access)

Influence of a Sector Ground Screen on the Field of a Vertical Antenna

Report show the field of a short vertical antenna on a homogeneous ground is modified by the presence of a metallic screen. The screen is taken in the form of a circular disk and a concentric sector. The modification of the field is expressed in the form of surface integrals over the disk and the sector. Extensive numerical results for these basic integrals are given and a number of applications are illustrated.
Date: April 15, 1963
Creator: Wait, James R. & Walters, Lillie C.
System: The UNT Digital Library
Two-Facility Approach to Investigations of Fast Reactor Meltdowns (open access)

Two-Facility Approach to Investigations of Fast Reactor Meltdowns

Report issued by the APDA over studies conducted on hypothetical fast reactor meltdown accidents. As stated in the summary, "the purpose of this study is to investigate the technical feasibility of conducting fast reactor meltdown experiments to determine a more realistic maximum accident and to provide a better evaluation of fast reactor safety" (p. 7). This report includes tables, and illustrations.
Date: January 15, 1963
Creator: Doyle, T. A.; Page, E. M.; Nicholson, R. B.; Hagstrom, J. T. & Nims, J. B.
System: The UNT Digital Library
Reactor Development Program Progress Report: March 1963 (open access)

Reactor Development Program Progress Report: March 1963

Report issued by the Argonne National Laboratory discussing progress made by the Reactor Development Program during March 1963. Reactor physics, experiments, and safety studies are presented. This report includes tables, and illustrations.
Date: April 15, 1963
Creator: Adams, R. M. & Glassner, A.
System: The UNT Digital Library
Reactor Development Program Progress Report: April 1963 (open access)

Reactor Development Program Progress Report: April 1963

Report issued by the Argonne National Laboratory discussing progress made by the Reactor Development Program during April 1963. Reactor physics, experiments, and safety studies are presented. This report includes tables, and illustrations.
Date: May 15, 1963
Creator: Adams, R. M. & Glassner, A.
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963 (open access)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: November 15, 1963
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963 (open access)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: February 15, 1963
Creator: Aerojet-General Corporation
System: The UNT Digital Library
In-Pile Loop Corrosion Experiments with Uranyl Sulfate Solutions at 235 and 250 C (open access)

In-Pile Loop Corrosion Experiments with Uranyl Sulfate Solutions at 235 and 250 C

Report presenting in-pile loop experiments DD, EE, FF, GG, L-412, L-413, and L-418, which were seven of a series designed to test the radiation corrosion of zirconium, titanium, and stainless steel alloys in solutions under various conditions of radiation intensity, temperature, solution composition, and velocity of flow. Steel specimens exposed in the loop cores showed increases in corrosive attack over that expected out-of-radiation.
Date: August 15, 1963
Creator: Jenks, G. H. & Baker, J. E.
System: The UNT Digital Library
A Versatile Spectrometer Magnet Power Supply (open access)

A Versatile Spectrometer Magnet Power Supply

Early results from actual laboratory operation of a more versatile magnet supply.
Date: April 15, 1963
Creator: Groppe, W. A.
System: The UNT Digital Library
Nuclear Superheat Quarterly Project Report: Thirteenth Quarter, July-September 1962 (open access)

Nuclear Superheat Quarterly Project Report: Thirteenth Quarter, July-September 1962

From introduction: "This is the thirteenth in a series of quarterly reports which will cover the progress and results from the conceptual design, economic evaluations and research and development work performed by the General Electric Company as part of the Nuclear Superheat Project."
Date: May 15, 1963
Creator: Pennington, R. T.
System: The UNT Digital Library
Nuclear Superheat Quarterly Project Report: Fourteenth Quarter, October-December 1962 (open access)

Nuclear Superheat Quarterly Project Report: Fourteenth Quarter, October-December 1962

From introduction: "This is the fourteenth in a series of quarterly reports which will cover the progress and results from the conceptual design, economic evaluations and research and development work performed by the General Electric Company as part of the Nuclear Superheat Project."
Date: January 15, 1963
Creator: Pennington, R. T.
System: The UNT Digital Library
Sodium-Cooled Reactors Program, Fast Ceramic Reactor Development Program: First Quarterly Report, October-December 1961 (open access)

Sodium-Cooled Reactors Program, Fast Ceramic Reactor Development Program: First Quarterly Report, October-December 1961

Quarterly report discussing progress on the Fast Ceramic Reactor Development Program, "an integrated analytical and experimental program directed toward the development of fast reactors employing ceramic fuels, with particular attention to mixed plutonium-uranium oxide" (p. 1).
Date: August 15, 1963
Creator: Leitz, F. J.
System: The UNT Digital Library
A start-up scheme for Tory II-C during simplified boost trajectories (open access)

A start-up scheme for Tory II-C during simplified boost trajectories

This memorandum discusses TORY II-C reactor control and reactor kinetics during simplified boost trajectories. Reactor start-up, power excursions, and automated control systems are investigated.
Date: January 15, 1963
Creator: Stubbs, T.
System: The UNT Digital Library
Investigation of impulsively loaded pressure vessels (open access)

Investigation of impulsively loaded pressure vessels

Explosion containment vessels for containing from 2,000 to 3,000 five ton nuclear explosions are considered. Analysis methods appear adequate and lowest weights using the most advanced materials available in the next five years are projected.None of these materials can be fabricated today and all require extensive development. Present material technology limits the choice of materials and defines the weight. The addition of safety factors and fixtures (nozzles, etc.) will add to this weight considerably, and may well radically alter the vessel response. Improvements in the strength weight ratios of metals and glasses over those considered in this report do not appear reasonable at this time. Winding schemes to utilize the high strength of steel wires and somehow maintain a reasonable thickness appear to offer the most promise. A `ductile` beryllium would of course offer vast improvement, but no indications that this is being developed have appeared and all presently known beryllium is much too brittle.
Date: October 15, 1963
Creator: Brown, N.; Cornwell, R.; Hanner, D.; Leichter, H. & Mohr, P.
System: The UNT Digital Library
PM-1 Nuclear Power Plant Program: Final Progress Report, September 1, 1962 Through Completion (open access)

PM-1 Nuclear Power Plant Program: Final Progress Report, September 1, 1962 Through Completion

From abstract: The principal efforts during the final period were concerned with plant testing, modifications to the plant to enable it to produce full design load at high ambient temperatures, the compilation and evaluation of plant performance data, preparation of documents and transfer of the plant to the AEC and final resolution of all outstanding contract scope items.
Date: July 15, 1963
Creator: unknown
System: The UNT Digital Library
Mechanical Properties of Zircaloy-2 - Niobium - Oxygen Alloys (open access)

Mechanical Properties of Zircaloy-2 - Niobium - Oxygen Alloys

Introduction: The effects of temperature on the mechanical properties of Zircaloy-2 containing up to 7.5 wt % niobium and 3500-ppm oxygen were studied and are presented herein.
Date: January 15, 1963
Creator: Bibb, A. E. & Fascia, J. R.
System: The UNT Digital Library
SNAP 7D: stronium-90 fueled thermoelectric generator power source, thirty-watt U.S. Navy Floating Weather Station, final report (open access)

SNAP 7D: stronium-90 fueled thermoelectric generator power source, thirty-watt U.S. Navy Floating Weather Station, final report

The objectives of the SNAP-7D program were to design, manufacture, test and deliver a thirty-watt electric generating system for a modified U.S. Navy NOMAD-class weather buoy to be stationed in the Gulf of Mexico. The sixty-watt Strontium-90 thermoelectric generator, the relay panel, the batteries, and the installation of the system in a boat-type buoy are described. In addition to delivering the power supply, many tests were required for the SNAP-7D system to demonstrate its conformance to the contract statement of work.
Date: March 15, 1963
Creator: unknown
System: The UNT Digital Library
Radiolysis of Organic Fluids, Annual Progress Report: October 1, 1961-September 30, 1962 (open access)

Radiolysis of Organic Fluids, Annual Progress Report: October 1, 1961-September 30, 1962

From introduction: This report reviews the Susie program (particularly reactor dosimetry and data analysis) as well as other items that represent a smaller share of the total effort.
Date: January 15, 1963
Creator: Bolt, R. O.; Burrous, M. L.; Carroll, J. G.; Hall, K. L.; Sweeney, M. A. & Tobriner, M. W.
System: The UNT Digital Library
Dynamic Void Fraction Measurement System (open access)

Dynamic Void Fraction Measurement System

Abstract: Various methods and techniques of measuring void fractions in boiling heat transfer media are discussed.
Date: May 15, 1963
Creator: Kendron, J. H.; Stoner, E. E. & Taylor, G. M.
System: The UNT Digital Library
The Magnesium-28-Aluminum-28 System: An Aluminum-28 Generator (open access)

The Magnesium-28-Aluminum-28 System: An Aluminum-28 Generator

A milking method was developed for the production of the short-lived Al/ sup 28/ for use in physiological experiments. A Mg/sup 28/ solution is obtained by the irradiation and purification of a Li/sup 6/Mg/sup 26/ alloy, and it is placed on a Dowex 50W column in the Na/sup +/ form and then washed with 1 N NaOH. The Al/sup 28/ is eluted in 10 to 30 sec by 1 N NaOH solution containing 0.5 mg/ ml of carrier Al. The half lives of Mg/sup 28/ and Al/sup 28/ were determined to be 20.88 plus or minus 0.06 hr and 2.238 plus or minus 0.006 min, respectively. (D.L.C.)
Date: March 15, 1963
Creator: Weiss, A. J. & Hillman, M.
System: The UNT Digital Library
SRE Systems and Components Experience. Core II (open access)

SRE Systems and Components Experience. Core II

The design and performance of SRE Core II fuel elements, moderator cans, hot traps, cold traps, control elements, pumps, main primary heat exchanger, valves and sodium piping, and instrumentation are discussed. (R.E.U.)
Date: November 15, 1963
Creator: Pearson, E. N.
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963 (open access)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: November 15, 1963
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Program cost estimate for SNAP-50/SPUR. Fiscal years, 1964--1965 (open access)

Program cost estimate for SNAP-50/SPUR. Fiscal years, 1964--1965

None
Date: October 15, 1963
Creator: unknown
System: The UNT Digital Library
PRODUCTION OF STRONTIUM-TITANATE RADIOISOTOPE FUEL FOR SNAP 7B THERMOELECTRIC GENERATOR (open access)

PRODUCTION OF STRONTIUM-TITANATE RADIOISOTOPE FUEL FOR SNAP 7B THERMOELECTRIC GENERATOR

The conversion of strontium-90 to strontium titanate heat source pellets is described. Encapsulation of the fuel in Hastelloy C containers and necessary leak testing, decontamination and calorimetry procedures are covered. Loading of the SNAP 7B thermoelectric generator was accomplished. (auth)
Date: April 15, 1963
Creator: Bloom, J.L.
System: The UNT Digital Library