Army Training: Improvements Are Needed in 5-Ton Truck Driver Training and Supervision (open access)

Army Training: Improvements Are Needed in 5-Ton Truck Driver Training and Supervision

A letter report issued by the General Accounting Office with an abstract that begins "Instructor shortages are affecting the quality and quantity of Army truck driver training. Fort Leonard Wood, which trains about 90 percent of truck drivers, is especially affected by the instructor shortage. The result is that student drivers are not fully trained in all aspects of the instruction program when they graduate. If formal schools had enough instructors, they would presumably be able to teach the entire instruction program. The student imbalance between the schools at Fort Leonard Wood and Fort Bliss creates an ineffective use of resources. If the annual student load were more equally distributed between the two schools, student graduates from Fort Leonard Wood might receive more complete training. The formal schools are not adhering to the instruction program, which calls for some training with trucks carrying cargo. Furthermore, no training is provided on how to pull equipment. Similarly, students are not being trained to drive under different weather and surface conditions. Because annual check rides and sustainment are not always being performed, unsafe driving habits may go undetected. Although performing and recording check rides and sustainment may be time-consuming, these procedures can save …
Date: April 11, 2001
Creator: United States. General Accounting Office.
Object Type: Report
System: The UNT Digital Library
Automated Teller Machines: Some Consumer Fees Have Increased (open access)

Automated Teller Machines: Some Consumer Fees Have Increased

A letter report issued by the Government Accountability Office with an abstract that begins "Automated teller machine (ATM) operators include financial institutions--banks and credit unions--as well as independent firms. Industry representatives GAO spoke with estimate there are approximately 420,000 ATMs in the United States. They estimate that financial institutions operate and set the fees for about half of the market, and independent operators work together with merchants to operate the remainder and to determine the fees incurred by consumers. ATM operators have differing business models that affect the way they set ATM fees for consumers. Financial institutions operate ATMs as a convenience to their own account holders, who generally do not pay fees to use these ATMs, while non-account-holding customers do. At independent ATMs, most consumers incur a surcharge fee, although there are some exceptions, such as when the ATM is part of a surcharge-free ATM network."
Date: April 11, 2013
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Ballistic Missile Defense: Actions Needed to Address Implementation Issues and Estimate Long-Term Costs for European Capabilities (open access)

Ballistic Missile Defense: Actions Needed to Address Implementation Issues and Estimate Long-Term Costs for European Capabilities

A letter report issued by the Government Accountability Office with an abstract that begins "The Department of Defense (DOD) met the presidentially announced time frame to deploy initial ballistic missile defense (BMD) capabilities in Europe under the European Phased Adaptive Approach (EPAA) but did not fully identify and plan to resolve implementation issues before deployment. As a result, DOD experienced implementation issues, such as incomplete construction of housing facilities for soldiers arriving at the EPAA radar site in Turkey and incomplete implementing arrangements defining how to operate with allies when certain BMD elements arrived in the host country. U.S. Strategic Command, in coordination with other combatant commands, developed criteria to assess whether a BMD capability is ready for operational use to ensure that BMD capabilities can be used as intended when they are delivered. However, the assessment criteria used during this process focused on effectiveness, suitability, and interoperability areas—such as whether BMD elements can work together to track ballistic missile threats—and did not explicitly require DOD to comprehensively identify and plan to resolve implementation issues prior to deploying these capabilities. DOD plans to continue to use its existing process to accept BMD capabilities planned for Europe in the future. Without …
Date: April 11, 2014
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Best Practices: Better Acquisition Outcomes Are Possible If DOD Can Apply Lessons from F/A-22 Program (open access)

Best Practices: Better Acquisition Outcomes Are Possible If DOD Can Apply Lessons from F/A-22 Program

Testimony issued by the General Accounting Office with an abstract that begins "Over the next 5 years, DOD's overall investments are expected to average $150 billion a year to modernize and transition our forces. In addition, DOD must modernize its forces amid competing demands for federal funds, such as health care and homeland security. Therefore, it is critical that DOD manage its acquisitions in the most cost efficient and effective manner possible. DOD's newest acquisition policy emphasizes the use of evolutionary, knowledge-based concepts that have proven to produce more effective and efficient weapon systems outcomes. However, most DOD programs currently do not employ these practices and, as a result, experience cost increases, schedule delays, and poor product quality and reliability. This testimony compares the best practices for developing new products with the experiences of the F/A-22 program."
Date: April 11, 2003
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Commercial Spent Nuclear Fuel: Observations on the Key Attributes and Challenges of Storage and Disposal Options (open access)

Commercial Spent Nuclear Fuel: Observations on the Key Attributes and Challenges of Storage and Disposal Options

Testimony issued by the Government Accountability Office with an abstract that begins "In November 2009, GAO reported on the attributes and challenges of a Yucca Mountain repository. A key attribute identified was that the Department of Energy (DOE) had spent significant resources to carry out design, engineering, and testing activities on the Yucca Mountain site and had completed a license application and submitted it to the Nuclear Regulatory Commission, which has regulatory authority over the construction, operation, and closure of a repository. If the repository had been built as planned, GAO concluded that it would have provided a permanent solution for the nation's commercial nuclear fuel and other nuclear waste and minimized the uncertainty of future waste safety. Constructing the repository also could have helped address issues including federal liabilities resulting from industry lawsuits against DOE related to continued storage of spent nuclear fuel at reactor sites. However, not having the support of the administration and the state of Nevada proved a key challenge. As GAO reported in April 2011, DOE officials did not cite technical or safety issues with the Yucca Mountain repository project when the project's termination was announced but instead stated that other solutions could achieve broader …
Date: April 11, 2013
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Contract Management: Roles and Responsibilities of the Federal Supply Service and Federal Technology Service (open access)

Contract Management: Roles and Responsibilities of the Federal Supply Service and Federal Technology Service

Testimony issued by the General Accounting Office with an abstract that begins "The General Services Administration's (GSA) Federal Supply Service (FSS) and Federal Technology Service (FTS) help agencies to purchase telephone and computer systems, motor vehicles, travel, and everyday supplies valued at more than $30 billion annually. FSS and FTS take different approaches to filling agency customers' requirements but, in the information technology area, they provide similar goods and services and deal with many of the same vendors. Although overlapping programs with similar services would appear to create the potential for inefficiencies, GSA has little hard data with which to assess the situation. GSA has begun to provide more useful information on the performance of FSS and FTS and to identify more efficient operations. If successful, these initiatives also may provide a road map for assessing the performance of other interagency purchasing programs."
Date: April 11, 2002
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Defense Acquisitions: Missile Defense Needs a Better Balance between Flexibility and Accountability (open access)

Defense Acquisitions: Missile Defense Needs a Better Balance between Flexibility and Accountability

Testimony issued by the Government Accountability Office with an abstract that begins "Over the next 5 years the Missile Defense Agency (MDA) expects to invest $49 billion in the Ballistic Missile Defense System's (BMDS) development and fielding. MDA's strategy is to field new capabilities in 2-year blocks. In January 2006, MDA initiated its second block--Block 2006--to protect against attacks from North Korea and the Middle East. Congress requires GAO to assess MDA's progress annually. GAO's March 2007 report addressed MDA's progress during fiscal year 2006 and followed up on program oversight issues and the current status of MDA's quality assurance program. GAO assessed the progress of each element being developed by MDA, examined acquisition laws applicable to major acquisition programs, and reviewed the impact of implemented quality initiatives."
Date: April 11, 2007
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Drinking Water Infrastructure: Information on Estimated Needs and Financial Assistance (open access)

Drinking Water Infrastructure: Information on Estimated Needs and Financial Assistance

Testimony issued by the General Accounting Office with an abstract that begins "The Environmental Protection Agency (EPA) conducts an infrastructure needs assessment every four years to estimate the future capital investment needs of local drinking water systems. In its most recent survey, EPA estimated that nearly $151 billion will be needed during the next 20 years to repair, replace, and upgrade the nation's 55,000 community water systems. The needs assessment survey serves as the basis for EPA's grants to the states under the drinking water revolving fund program. To ensure that it collected valid data to estimate drinking water infrastructure needs EPA conducted site visits to selected systems and had states review supporting documentation. However, EPA cannot tell how closely the estimates reflect actual state-by-state needs because it did not calculate the precision of estimates. GAO found that 31 out of 50 states surveyed established revolving loan funds programs to assist disadvantaged communities. In fiscal years 1991 through 2000, nine federal agencies made available about $44 billion in grants, loans, and loan guarantees for drinking water and wastewater capital improvements."
Date: April 11, 2002
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Environmental Cleanup: Better Communication Needed for Dealing with Formerly Used Defense Sites in Guam (open access)

Environmental Cleanup: Better Communication Needed for Dealing with Formerly Used Defense Sites in Guam

A letter report issued by the General Accounting Office with an abstract that begins "Chemical testing kits from World War II containing diluted mustard gas and other chemicals have been discovered on Guam. The Department of Defense (DOD) is responsible for identifying and cleaning up contaminated military sites throughout the United States and its territories. In the mid-1990s, DOD scaled back its identification efforts nationally and focused its attention on Guam. It now relies on referrals from the Guam Environmental Protection Agency and on incidental discovery during construction and other operational activities. Stakeholders had three concerns about the Army Corps of Engineers' efforts to identify and address contamination on former defense sites. First, they were uncertain about the Corps' process for adding potentially contaminated locations to its Guam inventory. Second, some locations containing debris, such as metal and tires, were excluded even though the waste was caused by DOD and could place a financial burden on the owner to remove it. Third, stakeholders were concerned about the slow pace of funding for the program. Between fiscal years 1984 and 2000, only four percent of the total expected cost of cleaning up these locations had been funded in Guam, compared with …
Date: April 11, 2002
Creator: United States. General Accounting Office.
Object Type: Report
System: The UNT Digital Library
Environmental Liabilities: DOD Training Range Cleanup Cost Estimates Are Likely Understated (open access)

Environmental Liabilities: DOD Training Range Cleanup Cost Estimates Are Likely Understated

A letter report issued by the General Accounting Office with an abstract that begins "Because of concerns about the long-term budgetary implications associated with the environmental cleanup of the Department of Defense (DOD) training ranges, GAO examined (1) the potential magnitude of the cost to clean up these ranges in compliance with applicable laws and regulations, (2) the scope and reliability of DOD's training range inventory, and (3) the methodologies used to develop cost estimates. GAO found that DOD lacks complete and accurate data with which to estimate training range cleanup costs. DOD has not done a complete inventory of its ranges to fully identify the types and extent of unexploded ordnance present and the associated contamination. Recently, DOD began to compile training range data, but these initial efforts have been delayed because DOD did not issue formal guidance to the services for collecting the information until October 2000. Because DOD has not completed an inventory of its ranges, the services have used varying methods to estimate the size and condition of the ranges necessary to estimate the cost of cleanup for financial statement purposes. As a result, environmental liability costs are not consistently calculated and reported across the services."
Date: April 11, 2001
Creator: United States. General Accounting Office.
Object Type: Report
System: The UNT Digital Library
Federal Buildings: Billions Are Needed for Repairs and Alterations (open access)

Federal Buildings: Billions Are Needed for Repairs and Alterations

Testimony issued by the General Accounting Office with an abstract that begins "Pursuant to a congressional request, GAO discussed the results of its work on the General Services Administration's (GSA) Repairs and Alterations Program, focusing on: (1) the extent of repairs and alterations that have been identified at government-owned buildings managed by GSA; (2) factors that impede GSA's ability to satisfy its repair and alteration requirements; and (3) GSA's efforts to improve its management of repairs and alterations."
Date: April 11, 2000
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Federal Courthouses: Recommended Construction Projects Should Be Evaluated under New Capital- Planning Process (open access)

Federal Courthouses: Recommended Construction Projects Should Be Evaluated under New Capital- Planning Process

A letter report issued by the Government Accountability Office with an abstract that begins "The Asset Management Planning (AMP) process represents progress by the federal judiciary (judiciary) in better aligning its capital-planning process with leading capitalplanning practices, but its 5-year plan for fiscal years 2014 to 2018--the document the judiciary uses to request courthouse construction projects--lacks transparency and key information on how projects qualify for new construction, alternatives the judiciary considered, and their cost. For example, the plan lists costs for the next phase of the 12 recommended courthouse projects, which have several phases, but does not list previous funding or ongoing annual costs for the projects. As a result, the plan lists about $1 billion in costs for the 12 projects, but the projects would actually cost the federal government an estimated $3.2 billion over the next 20 years. Congress has appropriated a small share of the money needed for the projects, and most will need design changes before construction can begin. As a result, there is a risk that congressional funding decisions could be made without complete and accurate information. However, with this information, decision makers could weigh current-year budget decisions within the context of projects' expected future …
Date: April 11, 2013
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
The Federal Government's Long-Term Fiscal Outlook: Spring 2013 Update (open access)

The Federal Government's Long-Term Fiscal Outlook: Spring 2013 Update

Other written product issued by the Government Accountability Office with an abstract that begins "Since 1992, GAO has published long-term fiscal simulations showing federal deficits and debt under different sets of policy assumptions."
Date: April 11, 2013
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Federal Reserve Banks: Areas for Improvement in Information Systems Controls (open access)

Federal Reserve Banks: Areas for Improvement in Information Systems Controls

Correspondence issued by the Government Accountability Office with an abstract that begins ""
Date: April 11, 2012
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Follow-up Report on Matters Relating to Securities Arbitration (open access)

Follow-up Report on Matters Relating to Securities Arbitration

Correspondence issued by the General Accounting Office with an abstract that begins "Our June 2000 report Securities Arbitration: Actions Needed to Address Problem of Unpaid Awards revealed that, although investors had won a majority of awards against brokers, a high proportion of those awards had not been paid. Nearly all of the unpaid awards involved cases decided in the National Association of Securities Dealer's (NASD) arbitration program and most involved brokers that had left the securities industry. A year later we reported on limited data suggesting that the rate of unpaid awards had declined. However, we noted that given the short time period that the data covered, regulators needed to continue monitoring the payment of the awards to determine whether additional steps need to be taken. Arbitration attorneys and claimants have also expressed concern about the timeliness of NASD's updating of arbitrator disclosure information, which can be used by the parties in arbitration to judge the competence and objectivity of arbitrators, and with NASD's ability to remove arbitrators from cases if conflicts arise. In addition, arbitration attorneys also expressed concern about the use of motions to dismiss and motions for summary judgment to terminate NASD-administered arbitration cases. This report responds …
Date: April 11, 2003
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Forest Service: Broad-Scale Assessments Could Be Better Integrated Into the Forest Planning Process (open access)

Forest Service: Broad-Scale Assessments Could Be Better Integrated Into the Forest Planning Process

Testimony issued by the General Accounting Office with an abstract that begins "Pursuant to a congressional request, GAO discussed the Forest Service's forest plans, focusing on the: (1) role of broad-scale assessments in the agency's planning process; (2) lessons that have been learned about conducting such assessments; and (3) importance of holding Forest Service managers accountable for integrating the assessments into their planning processes."
Date: April 11, 2000
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Free Trade Area of the Americas: Negotiations Progress, but Successful Ministerial Hinges on Intensified U.S. Preparations (open access)

Free Trade Area of the Americas: Negotiations Progress, but Successful Ministerial Hinges on Intensified U.S. Preparations

A letter report issued by the General Accounting Office with an abstract that begins "Establishing a 34-nation Free Trade Area of the Americas agreement has been under negotiation since 1998. This agreement would eliminate tariffs and create common trade and investment rules for these nations. Most recently, the United States, along with Brazil, assumed the leadership of the negotiations. GAO was asked to analyze (1) the challenges for the current negotiating phase, which will include a ministerial meeting in Miami, Florida, in November 2003; and (2) the U.S.'s readiness to serve as co-chair of the negotiations and host of the November 2003 ministerial."
Date: April 11, 2003
Creator: United States. General Accounting Office.
Object Type: Report
System: The UNT Digital Library
Homeland Security: Justice Department's Project to Interview Aliens after September 11, 2001 (open access)

Homeland Security: Justice Department's Project to Interview Aliens after September 11, 2001

A letter report issued by the General Accounting Office with an abstract that begins "As one response to the September 11 terrorist attacks, the Department of Justice (DOJ) initiated a project to interview aliens whose characteristics were similar to those responsible for the attacks. The purpose was to determine what knowledge the aliens might have of terrorists and terrorist activities. GAO was asked to (1) determine the criteria DOJ used in compiling the list of aliens to be questioned, (2) whether law enforcement complied with DOJ guidance for the project, (3) the interview project's status, and (4) what information resulted from it."
Date: April 11, 2003
Creator: United States. General Accounting Office.
Object Type: Report
System: The UNT Digital Library
Homeland Security: Responsibility and Accountability for Achieving National Goals (open access)

Homeland Security: Responsibility and Accountability for Achieving National Goals

Testimony issued by the General Accounting Office with an abstract that begins "In the aftermath of the September 11 terrorist attacks, the Administration took several steps to strengthen homeland security, including the creation of an Office of Homeland Security (OHS). The success of a homeland security strategy requires all levels of government and the private sector to communicate and cooperate with one another. The federal government must formulate realistic budget and resource plans to support the implementation of an efficient and effective homeland security program. A fundamental review of existing programs and operations can create the necessary fiscal flexibility by weeding out out-dated, poorly targeted, or inefficient programs. Although Congress called upon GAO to evaluate the effectiveness of OHS programs, GAO has experienced difficulty in gaining access to this information."
Date: April 11, 2002
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Hospital Emergency Departments: Health Center Strategies That May Help Reduce Their Use (open access)

Hospital Emergency Departments: Health Center Strategies That May Help Reduce Their Use

Correspondence issued by the Government Accountability Office with an abstract that begins "Hospital emergency departments are a major component of the nation's health care safety net as they are open 24 hours a day, 7 days a week, and generally are required to medically screen all people regardless of ability to pay. From 1997 through 2007, U.S. emergency department per capita use increased 11 percent. In 2007, there were approximately 117 million visits to emergency departments; of these visits, approximately 8 percent were classified as nonurgent. The use of emergency departments, including use for nonurgent conditions, may increase as more people obtain health insurance coverage as the provisions of the Patient Protection and Affordable Care Act (PPACA) are implemented. Some nonurgent visits are for conditions that likely could be treated in other, more cost-effective settings, such as health centers--facilities that provide primary care and other services to individuals in communities they serve regardless of ability to pay. Care provided in an emergency department may be substantially more costly than care provided in a health center. The average amount paid for a nonemergency visit to the emergency department was seven times more than that for a health center visit, according to …
Date: April 11, 2011
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
HUD Purchase Cards: Poor Internal Controls Resulted in Improper and Questionable Purchases (open access)

HUD Purchase Cards: Poor Internal Controls Resulted in Improper and Questionable Purchases

A letter report issued by the General Accounting Office with an abstract that begins "Due to the Department of Housing and Urban Development's (HUD) increasing use of purchase cards and the inherent risk associated with their use, Congress asked GAO to audit the purchase card program concentrating on assessing internal controls and determining whether purchases being made are a valid use of government funds."
Date: April 11, 2003
Creator: United States. General Accounting Office.
Object Type: Report
System: The UNT Digital Library
Human Capital: Selected Agency Actions to Integrate Human Capital Approaches to Attain Mission Results (open access)

Human Capital: Selected Agency Actions to Integrate Human Capital Approaches to Attain Mission Results

A letter report issued by the General Accounting Office with an abstract that begins "Successful strategic human capital management requires the integration of human capital approaches with strategies for accomplishing organizational missions and program goals. Such integration allows the agency to ensure that its core processes efficiently and effectively support mission-related outcomes. Based on the recommendations of various human capital experts, GAO identified six executive branch agencies that had taken key actions to integrate their human capital approaches with their strategic planning and decision making. The agencies were the Federal Emergency Management Agency, the General Services Administration, the Internal Revenue Service, the Social Security Administration, the U.S. Coast Guard, and the U.S. Geological Survey. These key actions may prove helpful to other agencies as they seek to ensure that their human capital approaches are aligned with their program goals."
Date: April 11, 2003
Creator: United States. General Accounting Office.
Object Type: Report
System: The UNT Digital Library
Income Ranges of Taxpayers Who May Have Overpaid Federal Taxes by Not Itemizing (open access)

Income Ranges of Taxpayers Who May Have Overpaid Federal Taxes by Not Itemizing

Correspondence issued by the General Accounting Office with an abstract that begins "This report provides information on the income ranges of taxpayers who may have overpaid federal taxes by not itemizing. GAO found that of the returns filed for tax year 1998, 53 percent of taxpayers who may have overpaid federal taxes by not itemizing, had adjusted gross incomes of $50,000 or less. Eleven percent showed adjusted gross incomes of more than $75,000. The median adjusted gross income for these returns was about $47,000. The median adjusted gross income for all returns filed in tax year 1998 was about $27,000."
Date: April 11, 2002
Creator: United States. General Accounting Office.
Object Type: Text
System: The UNT Digital Library
Indian Health Service: Capping Payment Rates for Nonhospital Services Could Save Millions of Dollars for Contract Health Services (open access)

Indian Health Service: Capping Payment Rates for Nonhospital Services Could Save Millions of Dollars for Contract Health Services

A letter report issued by the Government Accountability Office with an abstract that begins "The Indian Health Service's (IHS) federal contract health services (CHS) programs primarily paid physicians at their billed charges, which were significantly higher than what Medicare and private insurers would have paid for the same services. IHS's policy states that federal CHS programs should purchase services from contracted providers at negotiated, reduced rates. However, of the almost $63 million that the federal CHS programs paid for physician services provided in 2010, they paid about $51 million (81 percent) to physicians at billed charges and about $12 million (19 percent) to physicians at negotiated, reduced rates. Payments for other types of nonhospital services followed similar trends, with about $40 million out of $52 million (77 percent) paid at billed charges. GAO estimated that IHS's federal CHS programs paid two times as much as what Medicare would have paid and about one and a quarter times as much as what private insurers would have paid for the same physician services provided in 2010. If federal CHS programs had paid Medicare rates for these services, they could have used an estimated $32 million in savings to pay for many of …
Date: April 11, 2013
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library