8,420 Matching Results

Results open in a new window/tab.

A 1.5 Mwe Thermionic Reactor Space Power System (open access)

A 1.5 Mwe Thermionic Reactor Space Power System

None
Date: October 31, 1966
Creator: Smith, C. K. & Parkinson, R. Y.
Object Type: Report
System: The UNT Digital Library
The 2.6 Angstrom resolution structure of Rhodobacter capsulatus bacterioferritin with metal-free dinuclear site and heme iron in a crystallographic 'special position' (open access)

The 2.6 Angstrom resolution structure of Rhodobacter capsulatus bacterioferritin with metal-free dinuclear site and heme iron in a crystallographic 'special position'

None
Date: October 31, 2001
Creator: Cobessi, D.; Huang, L.-S.; Ban, M.; Pon, N. G.; Daldal, F. & Berry, E. A.
Object Type: Article
System: The UNT Digital Library
The 4-County News Bulletin (Castroville, Tex.), Vol. 19, No. 30, Ed. 1 Monday, October 31, 1977 (open access)

The 4-County News Bulletin (Castroville, Tex.), Vol. 19, No. 30, Ed. 1 Monday, October 31, 1977

Weekly newspaper from Castroville, Texas that includes local, state, and national news along with extensive advertising.
Date: October 31, 1977
Creator: Schott, Bobbie
Object Type: Newspaper
System: The Portal to Texas History
D = 5 Maximally Supersymmetric Yang-Mills Theory Diverges at Six Loops (open access)

D = 5 Maximally Supersymmetric Yang-Mills Theory Diverges at Six Loops

None
Date: October 31, 2012
Creator: Bern, Zvi; Carrasco, John Joseph; Dixon, Lance J.; Douglas, Michael R.; von Hippel, Matt & Johansson, Henrik
Object Type: Article
System: The UNT Digital Library
10 MMBt/Hr AFBC Commercial Demonstration Cedar Lane Farms (open access)

10 MMBt/Hr AFBC Commercial Demonstration Cedar Lane Farms

The objective of this project was to demonstrate and promote the commercialization of coal-fired atmospheric fluidized bed combustion (AFBC) systems, with limestone addition for SO2 emissions control and a baghouse for particulate emissions control. This AFBC system was targeted for small scale industrial-commercial-institutional space and process heat applications in the 4-40 MMBtu/hr size range. A cost effective and environmentally acceptable AFBC technology in this size range could displace a considerable amount of heating gas and oil with coal, while resulting in significant total cost savings to the owner/operators.
Date: October 31, 2005
Creator: Keener, Harold M.; Wicks, Mary H.; Machamer, Tom; Hoecke, Dave; Bonk, Don & Brown, Bob
Object Type: Report
System: The UNT Digital Library
12-INCH SODIUM FLOW CONTROLLER. Technical Manual 20357 (open access)

12-INCH SODIUM FLOW CONTROLLER. Technical Manual 20357

A manual is presented for the Sodium Flow Controller used in controlling flow to regulate heat transfer in a liquid metal nuclear power plant. A description of the controller, general installation and operational pointers, installation instructions, instructions for dismantling of the Sodium Flow Controller, instructions for assembly of Sodium Flow Controller, list of special tools and fixtures, and repair parts list are given. (M.C.G.)
Date: October 31, 1962
Creator: unknown
Object Type: Report
System: The UNT Digital Library
16,000-rpm Interior Permanent Magnet Reluctance Machine with Brushless Field Excitation (open access)

16,000-rpm Interior Permanent Magnet Reluctance Machine with Brushless Field Excitation

The reluctance interior permanent magnet (RIPM) motor is currently used by many leading auto manufacturers for hybrid vehicles. The power density for this type of motor is high compared with that of induction motors and switched reluctance motors. The primary drawback of the RIPM motor is the permanent magnet (PM) because during high-speed operation, the fixed PM produces a huge back electromotive force (emf) that must be reduced before the current will pass through the stator windings. This reduction in back-emf is accomplished with a significant direct-axis (d-axis) demagnetization current, which opposes the PM's flux to reduce the flux seen by the stator wires. This may lower the power factor and efficiency of the motor and raise the requirement on the alternate current (ac) power supply; consequently, bigger inverter switching components, thicker motor winding conductors, and heavier cables are required. The direct current (dc) link capacitor is also affected when it must accommodate heavier harmonic currents. It is commonly agreed that, for synchronous machines, the power factor can be optimized by varying the field excitation to minimize the current. The field produced by the PM is fixed and cannot be adjusted. What can be adjusted is reactive current to the …
Date: October 31, 2007
Creator: Hsu, J. S.; Burress, T. A.; Lee, S. T.; Wiles, R. H.; Coomer, C. L.; McKeever, J.W. et al.
Object Type: Report
System: The UNT Digital Library
40-MW(e) Prototype High-Temperature Gas-Cooled Reactor Research and Development Program. Quarterly Progress Report for the Period Ending June 30, 1962 (open access)

40-MW(e) Prototype High-Temperature Gas-Cooled Reactor Research and Development Program. Quarterly Progress Report for the Period Ending June 30, 1962

Research and development progress specifically directed toward the construction of a 40-Mw(e) prototype power plant employing a high-temperature, gas-cooled, graphitemoderated reactor known as the HTGR is reported. Irradiation of element III-B in the in-pile loop continued satisfactorily. The element has generated a total of l36.3 Mw-hr of fission heat. The gross activity in the purge stream increased slightly to about 350 mu C/cm/sup 3/. By taking larger gas samples than were previously taken, a value of 0.02 VC/cm/sup 3/ was obtained for the gross activity of the primary loop. Element III-A, which was removed from the loop after generating 133 Mw-hr of fission heat, was disassembled and examined. No fuel-compact damage of any type was visible. Determination of the distribution of fission products in the element is under way, Fissionproduct- release data for in-pile-loop element III-A were calculated. During the 133 Mw- hr of operation, the release fraction increased by approximately one order of magnitude. Also calculated were the xenon and krypton release data for the first 100 Mw-hr of III-B operation. The release rate for the longer-lived isotopes increased bv about a factor of 10 and that of the shorter-lived isotopes by about a factor of 100. A test …
Date: October 31, 1963
Creator: unknown
Object Type: Report
System: The UNT Digital Library
40-Mw(E) Prototype High-Temperature Gas-Cooled Reactor. Research and Development Program. Quarterly Progress Report for the Period Ending March 31, 1963 (open access)
100 LPW 800 Lm Warm White LED (open access)

100 LPW 800 Lm Warm White LED

An illumination grade warm white (WW) LED, having correlated color temperature (CCT) between 2800 K and 3500K and capable of producing 800 lm output at 100 lm/W, has been developed in this program. The high power WW LED is an ideal source for use as replacement for incandescent, and Halogen reflector and general purpose lamps of similar lumen value. Over the two year period, we have made following accomplishments: developed a high power warm white LED product and made over 50% improvements in light output and efficacy. The new high power WW LED product is a die on ceramic surface mountable LED package. It has four 1x1 mm{sup 2} InGaN pump dice flip chip attached to a ceramic submount in 2x2 array, covered by warm white phosphor ceramic platelets called Lumiramic™ and an overmolded silicone lens encapsulating the LED array. The performance goal was achieved through breakthroughs in following key areas: (1) High efficiency pump LED development through pump LED active region design and epi growth quality improvement (funded by internal programs). (2) Increase in injection efficiency (IE) represented by reduction in forward voltage (V{sub f}) through the improvement of the silver-based p-contact and a reduction in spreading resistance. The …
Date: October 31, 2010
Creator: Sun, Decai
Object Type: Report
System: The UNT Digital Library
1000-Mwe Liquid Metal Fast Breeder Reactor Follow-on Study Conceptual Design Report. Volume I. Summary. (open access)

1000-Mwe Liquid Metal Fast Breeder Reactor Follow-on Study Conceptual Design Report. Volume I. Summary.

This report discusses the engineering studies which led to the AL task III final reference design and describes this design.
Date: October 31, 1970
Creator: unknown
Object Type: Report
System: The UNT Digital Library
1000-Mwe Liquid Metal Fast Breeder Reactor Follow-on Study. Conceptual System Design Descriptions. (open access)

1000-Mwe Liquid Metal Fast Breeder Reactor Follow-on Study. Conceptual System Design Descriptions.

None
Date: October 31, 1970
Creator: unknown
Object Type: Report
System: The UNT Digital Library
1000-Mwe Liquid Metal Fast Breeder Reactor Follow-on Study. Conceptual System Design Descriptions. (open access)

1000-Mwe Liquid Metal Fast Breeder Reactor Follow-on Study. Conceptual System Design Descriptions.

This report describes the number of service systems that perform in the plant.
Date: October 31, 1970
Creator: unknown
Object Type: Report
System: The UNT Digital Library
1000-Mwe Liquid Metal Fast Breeder Reactor Follow-on Study. Conceptual System Design Descriptions. (open access)

1000-Mwe Liquid Metal Fast Breeder Reactor Follow-on Study. Conceptual System Design Descriptions.

This report contains the design description of the 1000-Mwe Liquid Metal Fast Breeder Reactor.
Date: October 31, 1970
Creator: unknown
Object Type: Report
System: The UNT Digital Library
10th Annual Bio-Assay and Analytical Chemistry Meeting, October 8-9, 1964 (open access)

10th Annual Bio-Assay and Analytical Chemistry Meeting, October 8-9, 1964

None
Date: October 31, 1966
Creator: unknown
Object Type: Report
System: The UNT Digital Library
15th Street News (Midwest City, Okla.), Vol. 15, No. 10, Ed. 1 Friday, October 31, 1986 (open access)

15th Street News (Midwest City, Okla.), Vol. 15, No. 10, Ed. 1 Friday, October 31, 1986

Newspaper from Rose State College in Midwest City, Oklahoma that includes national, local, and campus news along with advertising.
Date: October 31, 1986
Creator: Intrieri, Danette
Object Type: Newspaper
System: The Gateway to Oklahoma History
15th Street News (Midwest City, Okla.), Vol. 27, No. 9, Ed. 1 Friday, October 31, 1997 (open access)

15th Street News (Midwest City, Okla.), Vol. 27, No. 9, Ed. 1 Friday, October 31, 1997

Newspaper from Rose State College in Midwest City, Oklahoma that includes national, local, and campus news along with advertising.
Date: October 31, 1997
Creator: Easttom, Holly
Object Type: Newspaper
System: The Gateway to Oklahoma History
15th Street News (Midwest City, Okla.), Vol. 33, No. 8, Ed. 1 Friday, October 31, 2003 (open access)

15th Street News (Midwest City, Okla.), Vol. 33, No. 8, Ed. 1 Friday, October 31, 2003

Newspaper from Rose State College in Midwest City, Oklahoma that includes national, local, and campus news along with advertising.
Date: October 31, 2003
Creator: Pound, Jaylynn Christian
Object Type: Newspaper
System: The Gateway to Oklahoma History
15th Street News (Midwest City, Okla.), Vol. 38, No. 9, Ed. 1 Friday, October 31, 2008 (open access)

15th Street News (Midwest City, Okla.), Vol. 38, No. 9, Ed. 1 Friday, October 31, 2008

Newspaper from Rose State College in Midwest City, Oklahoma that includes national, local, and campus news along with advertising.
Date: October 31, 2008
Creator: Price, Racheal
Object Type: Newspaper
System: The Gateway to Oklahoma History
1961 Salmon Survey (open access)

1961 Salmon Survey

Explanation of research methods and data collected during a salmon survey at the Project Chariot site near Seattle, Washington.
Date: October 31, 1965
Creator: unknown
Object Type: Report
System: The UNT Digital Library
2000 Census: Complete Costs of Coverage Evaluation Programs Are Not Available (open access)

2000 Census: Complete Costs of Coverage Evaluation Programs Are Not Available

A letter report issued by the General Accounting Office with an abstract that begins "To assess the quality of the population data collected in the 2000 Census, the U.S. Census Bureau conducted the Accuracy and Coverage Evaluation (A.C.E.) program, which focused on a survey of housing units designed to estimate the number of people missed, counted more than once, or otherwise improperly counted in the census. GAO reviewed the life cycle costs of the A.C.E. program and its predecessor, the Integrated Coverage Measurement (ICM) program. GAO found that the original estimated cycle costs of conducting the ICM/A.C.E. programs were $400 million. The first evidence for the original $400 million estimate is in the original budget justifications for fiscal year 2000. The bureau based its estimates of ICM/A.C.E. costs on assumptions about the needs for personnel and benefits, contractual services, travel, office space, equipment, and other costs necessary to conduct and support operations of the programs. The budgeted amounts that GAO identified from bureau records for conducting the ICM/A.C.E. programs are $277 million through fiscal year 2003. The obligated costs that GAO identified from bureau records for conducting the ICM/A.C.E. programs are $207 million through fiscal year 2001. $58 million of …
Date: October 31, 2002
Creator: United States. General Accounting Office.
Object Type: Report
System: The UNT Digital Library
2000 Census: Lessons Learned for Planning a More Cost-Effective 2010 Census (open access)

2000 Census: Lessons Learned for Planning a More Cost-Effective 2010 Census

A letter report issued by the General Accounting Office with an abstract that begins "GAO reviewed the funding of 2000 Census planning and development efforts and the impact it had on census operations. Total funding for the 2000 Census, referred to as the life cycle cost, covers a 13-year period from fiscal year 1991 through fiscal year 2003 and is expected to total $6.5 billion adjusted to 2000 year dollars. This amount was almost double the reported life cycle cost of the 1990 Census of $3.3 billion adjusted to 2000 year dollars. Considering these escalating costs, the experience of the U.S. Census Bureau in preparing for the 2000 Census offers valuable insights for the planning and development efforts now occurring for the 2010 Census. Thorough and comprehensive planning and development efforts are crucial to the ultimate efficiency and success of any large, long-term project, particularly one with the scope, magnitude, and the deadlines of the U.S. decennial census. For fiscal years 1991 through 1997, $269 million was requested in the President's Budgets for 2000 Census planning and development and the program received funding of $224 million by Congress, or 83 percent of the amount requested. According to U.S. Census Bureau …
Date: October 31, 2002
Creator: United States. General Accounting Office.
Object Type: Report
System: The UNT Digital Library
2007 Annual Report Summer Research Institute Interfacial and Condensed Phase Chemical Physics (open access)

2007 Annual Report Summer Research Institute Interfacial and Condensed Phase Chemical Physics

The Pacific Northwest National Laboratory (PNNL) hosted its fourth annual Summer Research Institute in Interfacial and Condensed Phase Chemical Physics from April through September 2007. During this time, 21 PNNL scientists hosted 23 participants from 20 different universities. Of the 23 participants, 20 were graduate students, 1 was a postdoctoral fellow, and 2 were university faculty members. This report covers the essense of the program and the research the participants performed.
Date: October 31, 2007
Creator: Beck, Kenneth M.
Object Type: Report
System: The UNT Digital Library