Resource Type

Language

High Pu-240-content plutonium Chemical Processing cost estimates (open access)

High Pu-240-content plutonium Chemical Processing cost estimates

In response to an inquiry by Euratom, estimates of the costs for the production of 85 kg of 15% Pu-240 metal and for the production of 15 kg of 25% Pu-240 oxide at HAPO were recently requested by the Atomic Energy Commission. In connection with this inquiry, comments were requested regarding the possibility of establishing and measuring product plutonium oxide ``sinterability`` parameters. This report presents estimates of the costs for separations processing by the Chemical Processing Department for the cases of interest. Process ground rules and any necessary assumptions are explained. In addition, the problems of measuring oxide ``sinterability`` are briefly discussed. Highlights of this study were previously transmitted to the Irradiation Processing Department for incorporation in a formal reply to the original Commission request. Subsequently, some adjustments in ground rules have caused cost changes which are included in this report.
Date: September 26, 1963
Creator: McDonald, J. E.; Olson, R. E. & Rathvon, H. C.
System: The UNT Digital Library
Final report on the evaluation of Harvey aluminum components under PITA-IP-12-I (open access)

Final report on the evaluation of Harvey aluminum components under PITA-IP-12-I

Several evaluations of Harvey ``O`` size natural I&E aluminum components have been made. The performance of components received prior to May 1961, was unsatisfactory. To improve component quality, Harvey made major process modifications. Components processed at HAPO after July 1, 1961, were received subsequent to Harvey`s modifications, and met specifications. Procurement and evaluation of an additional 150,000 Harvey OIIIN components was authorized. Evaluation of the 5 first 150,000 Harvey OIIIN improved components suggested partial qualification. This document reports and makes recommendations based on the test data for Harvey improved components as of August 31, 1963.
Date: September 26, 1963
Creator: Hubert, R. V.
System: The UNT Digital Library
Fuel cluster assembly mechanical test. Preliminary report (open access)

Fuel cluster assembly mechanical test. Preliminary report

None
Date: September 26, 1963
Creator: Gesinski, L.T.
System: The UNT Digital Library