Core Design and Characteristics for the Consolidated Edison Reactor (open access)

Core Design and Characteristics for the Consolidated Edison Reactor

The general purpose of this report is to present the major characteristics and design of the Consolidated Edison Thorium Reactor (CETR) core
Date: August 18, 1958
Creator: Babcock & Wilcox Company
System: The UNT Digital Library
Irradiation Test Program for the Consolidated Edison Thorium Reactor (open access)

Irradiation Test Program for the Consolidated Edison Thorium Reactor

The Irradiation Test Program for the Consolidated Edison Thorium Reactor was conducted to obtain confirmation of the stability and performance of the reference fuel element materials and of test assemblies under design operation conditions. The irradiated specimens were tested to determine mechanical properties and corrosion resistance to borated water.
Date: August 1960
Creator: Baker, P. B.; Dzura, E. J. & Johnson, C. R.
System: The UNT Digital Library
Consolidated Edison Thorium Reactor Control Rod Drive Line Testing (open access)

Consolidated Edison Thorium Reactor Control Rod Drive Line Testing

The adequacy of the Consolidated Edison Thorium Reactor (CETR) control rod drive line operation was evaluated and proven by the development program described in this report. This program also included evaluation of materials and fabrication processes.
Date: August 1960
Creator: Good, J. A. & Thoren, D. E.
System: The UNT Digital Library
Consolidated Edison Thorium Reactor Control System Design (open access)

Consolidated Edison Thorium Reactor Control System Design

The Consolidated Edison Thorium Reactor Control System has been designed to provide the operators with a reliable, safe and accurate means of controlling the plant. Manual and automatic positioning of control rods can be accomplished. The automatic plant controller has been designed to meet the design criteria under the representative CETR demanded load changes. Adaptability has been built into the plant controller by providing variable controller adjustments for variations in reactor characteristics. Extensive analog studies have been made of the various plant parameters and their effect on control was carefully evaluated. These analog studies have shown that the control system will perform in a satisfactory manner under the most adverse plant conditions.
Date: August 1960
Creator: Carson, W. E.; Chubb, W. B.; Pickett, R. T. & Deddens, J. C.
System: The UNT Digital Library
Corrosion Product Activity Distribution Across the Chemical Process System in the Consolidated Edison Thorium Reactor Plant (open access)

Corrosion Product Activity Distribution Across the Chemical Process System in the Consolidated Edison Thorium Reactor Plant

A study has been performed to determine the corrosion product and water impurity activities in the CETR Chemical Process System. A simplified mathematical model is used to represent the physical situation; however, the magnitude of the activities, taken at the end of the core life to represent the most conservative case, is considered sufficiently accurate for engineering calculations.
Date: August 1960
Creator: Babcock & Wilcox Company
System: The UNT Digital Library
Design of the Movable and Fixed Control Components for the Consolidated Edison Thorium Reactor (open access)

Design of the Movable and Fixed Control Components for the Consolidated Edison Thorium Reactor

Prototype testing and thorough design analyses have proven the control components for the Consolidated Edison Thorium Reactor are adequate to withstand loads imposed during operation and handling. Assumptions made in the design analyses and cycles run during prototype testing subjected the components to more rigid conditions that are anticipated during actual operation. Results indicate the control components meet their design requirements.
Date: August 1960
Creator: Gestson, D. K.; Collings, D. M. & Maynard, W.
System: The UNT Digital Library
Liquid Metal Fuel Reactor Experiment Monthly Progress Statement: August, 1957 (open access)

Liquid Metal Fuel Reactor Experiment Monthly Progress Statement: August, 1957

A monthly report summarizing work performed by Babcock & Wilcox personnel for the U.S. Atomic Energy Commission. In this monthly report the R&D budget was reviewed, two-dimensional calculations were performed, analysis work was started on control rods and their housing, as well as continued work on the development of the LMFRE reactor.
Date: August 1957
Creator: Babcock & Wilcox Company
System: The UNT Digital Library
Consolidated Nuclear Steam Generator for Merchant Ship Application: A Conceptual Design (open access)

Consolidated Nuclear Steam Generator for Merchant Ship Application: A Conceptual Design

Report concerning the economic feasibility of pressurized water reactors for use aboard merchant ships. This includes conceptual designs and work remaining for the future of a Pressurized Water Reactor.
Date: August 1962
Creator: Babcock & Wilcox Company
System: The UNT Digital Library
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 5, Concept IV System Description (open access)

1000-MWe LMFBR Follow-On Study, Task I Report: Volume 5, Concept IV System Description

From introduction: "The last of four designs to be developed by Babcock & Wilcox (B&W), Concept IV observes ground rules established under the LMFBR Follow-On Program and is based on the estimated state of technology in 1980."
Date: August 1967
Creator: Goulding, B. J.
System: The UNT Digital Library
Liquid Metal Fuel Reactor Experiment: Reference Design Report (open access)

Liquid Metal Fuel Reactor Experiment: Reference Design Report

Report concerning preliminary designs of the Liquid Metal Fuel Reactor Experiment (LMFRE) facility. This includes descriptions of the reactor, degasser, and steam system, materials to be used, plant arrangement, building siting, and safety considerations.
Date: August 1957
Creator: Babcock & Wilcox Company
System: The UNT Digital Library