Resource Type

105-K Basin material design basis feed description for spent nuclear fuel project facilities. Volume 2: Sludge (open access)

105-K Basin material design basis feed description for spent nuclear fuel project facilities. Volume 2: Sludge

Volume 2 provides the design feed compositions for the baseline K East and K West Basin sludge process streams expected to be generated during Spent Nuclear Fuel (SNF) Project activities. Four types of feeds are required to support evaluation of specific facility and process considerations during the development of new facilities and processes. These four design feeds provide nominal and bounding conditions for design evaluations. Volume 2 includes definition of inventories for: (1) KE and KW Basins sludge locations (pit sludges, floor sludge, canister.sludge, and wash sludge components), (2) nominal feed for each of five process feed streams, (3) shielding design feed, (4) safety/regulatory assessment feed, and (5) criticality assessment feed.
Date: August 30, 1998
Creator: Pearce, K. L.
System: The UNT Digital Library
118-B-1 excavation treatability test procedures (open access)

118-B-1 excavation treatability test procedures

This treatability study has two purposes: to support development of the approach to be used for burial ground remediation, and to provide specific engineering information for the design of burial grounds receiving waste generated from the 100 Area removal actions. Data generated from this test will also provide performance and cost information necessary for detailed analysis of alternatives for burial ground remediation. Further details on the test requirements, milestones and data quality objectives are described in detail in the 118-B-1 Excavation Treatability Test Plan (DOE/RL-94-43). These working procedures are intended for use by field personnel to implement the requirements of the milestone. A copy of the detailed Test Plan will be kept on file at the on-site field support trailer, and will be available for review by field personnel.
Date: August 1, 1994
Creator: Frain, J. M.
System: The UNT Digital Library
150 kWe solar-powered deep-well irrigation facility. Phase I. Preliminary design study. Final report (open access)

150 kWe solar-powered deep-well irrigation facility. Phase I. Preliminary design study. Final report

Results of a preliminary design study for a solar-powered irrigation facility to be located on a farm between Phoenix and Tucson, Arizona, are presented. The ERDA-specified generic design criteria are detailed. A detailed systems analysis is presented, and preliminary designs of the thermal storage system, organic Rankine cycle power system, cooling water system, power distribution system, and collector foundation are given. Site layout and improvements are described, and a cost analysis of prototype and production units is included. Engineering drawings are included. (WHK)
Date: August 8, 1977
Creator: unknown
System: The UNT Digital Library
200 Area Effluent Treatment Facility set-values selection basis (open access)

200 Area Effluent Treatment Facility set-values selection basis

This document identifies the set-values and selection basis to support operation of the 200 Area ETF and 200 Area TEDF.
Date: August 7, 1996
Creator: Crane, A.F., Westinghouse Hanford
System: The UNT Digital Library
200 Area monthly report, July 1966 (open access)

200 Area monthly report, July 1966

This report details 200 Area activities for the month of July 1966.
Date: August 9, 1966
Creator: Christy, J. T.
System: The UNT Digital Library
200 Area weekly report (open access)

200 Area weekly report

None
Date: August 4, 1955
Creator: Christl, R. J.
System: The UNT Digital Library
A 200 Bev ACCELERATOR EMPLOYING A SEPARATED FUNCTION MAGNET LATTICE (open access)

A 200 Bev ACCELERATOR EMPLOYING A SEPARATED FUNCTION MAGNET LATTICE

None
Date: August 1, 1966
Creator: Danby, G. T.; Allinger, J. E. & Jackson, J. W.
System: The UNT Digital Library
200 Sand Steamflood Demonstration Project. Sixth annual report, June 1981-June 1982 (open access)

200 Sand Steamflood Demonstration Project. Sixth annual report, June 1981-June 1982

This demonstration project was initiated in the 200 Sand Pool in the Midway-Sunset Field, California Sand Pool to demonstrate the operational, recovery, and economic aspects of steamflooding a typical heavy oil reservoir which had unfavorable response to cyclic stimulation. The scope of the project involves 5 phases: (1) pilot site monitoring and evaluation; (2) pilot area expansion; (3) site selection for expansion to full-scale project; (4) expansion to full-scale steamflood; and (5) production monitoring. After expansion and steam injection for one year, the wells are averaging 8 B/D oil and 29 B/D water per well. This rate is above the 5 BOPD for cyclic stimulation. Most of the producing wells are steam stimulated about twice a year to enhance steam breakthrough from the continuous steam. The total area has averaged 319 B/D oil and 1233 B/D water the last year. 7 figures, 1 table.
Date: August 1, 1983
Creator: Alford, W.O.
System: The UNT Digital Library
219-S chemical compatibility (open access)

219-S chemical compatibility

This document consists of tables of the materials that make up the ''wetted'' parts of the 219-S waste handling facility and a combination of manufacturer lists of chemicals that are not recommended.
Date: August 31, 1999
Creator: Goodwin, L. D.
System: The UNT Digital Library
S. 219: The National Employee Savings and Trust Equity Guarantee Act (open access)

S. 219: The National Employee Savings and Trust Equity Guarantee Act

On July 26, 2005, the Senate Finance Committee approved S. 219, the “National Employee Savings and Trust Equity Guarantee (NESTEG) Act of 2005,” a bill to reform federal pension laws. This report summarizes the major provisions of the bill, as approved by the Committee.
Date: August 12, 2005
Creator: Purcell, Patrick J.
System: The UNT Digital Library
222-S Analytical services final results for Tank 241-U-101, grab samples 1U-96-1 through 1U-96-4 (open access)

222-S Analytical services final results for Tank 241-U-101, grab samples 1U-96-1 through 1U-96-4

This document is the final, format IV, laboratory report for characterization of tank 241-U-101 (U-101) grab samples from risers 1 and 7. It transmits additional analytical data for specific gravity (Sp.G.), and all raw analytical data which were not provided in the 45-day report. The 45-day report is attached to this final report as Part II. Secondary analyses were not performed on any of the U-101 samples. This is because none of the primary analyte limits, which trigger the performance of secondary analyses, were exceeded. Grab samples were taken on May 29, 1996 and May 30, 1996 from risers 1 and 7, respectively, and were received at the 222-S Laboratory on the same days that they were collected. Analyses were performed in accordance with the Tank Sampling and Analysis Plan (TSAP) for this tank and the Safety Screening Data Quality Objective (DQO). The samples were analyzed for differential scanning calorimetry (DSC), thermogravimetric analysis (TGA), total alpha activity (AT), visual appearance, bulk density, and specific gravity. A sample data summary table, includes sample analytical data accompanied by quality control data (for example, duplicate, spike, blank and standard results and detection limits and counting efforts). The table includes data for DSC, TGA, …
Date: August 23, 1996
Creator: Miller, G. L.
System: The UNT Digital Library
222-S Laboratory analytical report for tank 241-C-106, grab samples 6C-96-1 through 6C-96-16 {ampersand} 6C-96-17-FB (open access)

222-S Laboratory analytical report for tank 241-C-106, grab samples 6C-96-1 through 6C-96-16 {ampersand} 6C-96-17-FB

This document is the analytical report for grab samples 6C-96-1through 6C-96-16 and 6C-96-17-FB from tank 241-C-106.
Date: August 6, 1996
Creator: Esch, R. A.
System: The UNT Digital Library
222-S laboratory complex hazards assessment (open access)

222-S laboratory complex hazards assessment

The US Department of Energy (DOE) Order 5500.3A, Emergency Planning and Preparedness for Operational Emergencies, requires that a facility specific hazards assessment be performed to support Emergency Planning activities. The Hazard Assessment establishes the technical basis for the Emergency Action Levels (EALs) and the Emergency Planning Zone (EPZ). Emergency Planning activities are provided under contract to DOE through the Westinghouse Hanford Company (WHC). This document represents the facility specific hazards assessment for the Hanford Site 222-S Laboratories. The primary mission of 222-S is to provide analytic chemistry support to the Waste Management, Chemical Processing, and Environmental programs at the Hanford Site.
Date: August 29, 1994
Creator: Broz, R. E.
System: The UNT Digital Library
222-S Laboratory maintenance implementation plan (open access)

222-S Laboratory maintenance implementation plan

This Maintenance Improvement Plan has been developed for maintenance functions associated with the 222-S Laboratory. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter 11. The objective of this plan is to provide information for establishing and identifying WMH conformance programs and policies applicable to implementation of DOE Order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost effective and efficient maintenance program at 222-S Laboratory. Maintenance activities are mainly going to be performed by existing maintenance organizations within Waste Management Federal Services of Hanford (WMH). Most maintenance performed at 222-S Laboratory is performed by the 222-S Laboratory maintenance organization. This 222-S Laboratory Maintenance Implementation Plan provides the interface requirements and responsibilities as they apply specifically to 222-S Laboratory. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion section as applied to 222-S Laboratory implementation has been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised …
Date: August 13, 1997
Creator: Heinemann, J. L.
System: The UNT Digital Library
234-5 Remote mechanical line design bases and schedules (open access)

234-5 Remote mechanical line design bases and schedules

None
Date: August 22, 1949
Creator: Gross, C.N.
System: The UNT Digital Library
241-AN-A pit leak detection ANA-WT-LDSTA-331 acceptance test procedure (open access)

241-AN-A pit leak detection ANA-WT-LDSTA-331 acceptance test procedure

This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.
Date: August 25, 1999
Creator: VANDYKE, D.W.
System: The UNT Digital Library
241-AN-A valve pit manifold valves and position indication acceptance test procedure (open access)

241-AN-A valve pit manifold valves and position indication acceptance test procedure

This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-A Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-A Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.
Date: August 25, 1999
Creator: VANDYKE, D.W.
System: The UNT Digital Library
241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure (open access)

241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure

This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.
Date: August 25, 1999
Creator: VANDYKE, D.W.
System: The UNT Digital Library
241-AN-B valve pit manifold valves and position indication acceptance test procedure (open access)

241-AN-B valve pit manifold valves and position indication acceptance test procedure

This document describes the method used to test design criteria for gear actuated ball valves installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this procedure is to demonstrate the following: Equipment is properly installed, labeled, and documented on As-Built drawings; New Manifold Valves in the 241-AN-B Valve Pit are fully operable using the handwheel of the valve operators; New valve position indicators on the valve operators will show correct valve positions; New valve position switches will function properly; and New valve locking devices function properly.
Date: August 25, 1999
Creator: VANDYKE, D.W.
System: The UNT Digital Library
241-AY-101 Tank Construction Extent of Condition Review for Tank Integrity (open access)

241-AY-101 Tank Construction Extent of Condition Review for Tank Integrity

This report provides the results of an extent of condition construction history review for tank 241-AY-101. The construction history of tank 241-AY-101 has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In tank 241-AY-101, the second double-shell tank constructed, similar issues as those with tank 241-AY-102 construction reoccurred. The overall extent of similary and affect on tank 241-AY-101 integrity is described herein.
Date: August 26, 2013
Creator: Barnes, Travis J. & Gunter, Jason R.
System: The UNT Digital Library
241-U-701 new compressor building and instrument air piping analyses (open access)

241-U-701 new compressor building and instrument air piping analyses

Building anchorage analysis is performed to qualify the design of the new compressor building foundation given in the ECN ``241-U-701 New Compressor Building.`` Recommendations for some changes in the ECN are made accordingly. Calculations show that the 6-in.-slab is capable of supporting the pipe supports, and that the building foundation, air compressor and dryer anchorage, and electric rack are adequate structurally. Analysis also shows that the instrument air piping and pipe supports for the compressed air system meet the applicable code requirements and are acceptable. The building is for the U-Farm instrument air systems.
Date: August 25, 1994
Creator: Huang, F. H.
System: The UNT Digital Library
241-Z-361 Sludge Characterization Sampling and Analysis Plan (open access)

241-Z-361 Sludge Characterization Sampling and Analysis Plan

This sampling and analysis plan (SAP) identifies the type, quantity, and quality of data needed to support characterization of the sludge that remains in Tank 241-2-361. The procedures described in this SAP are based on the results of the 241-2-361 Sludge Characterization Data Quality Objectives (DQO) (BWHC 1999) process for the tank. The primary objectives of this project are to evaluate the contents of Tank 241-2-361 in order to resolve safety and safeguards issues and to assess alternatives for sludge removal and disposal.
Date: August 5, 1999
Creator: BANNING, D.L.
System: The UNT Digital Library
242-A Campaign 99-1 process control plan (open access)

242-A Campaign 99-1 process control plan

242-A Evaporator 99-1 will process approximately one million gallons of waste from tank 102-AW in June 1999. The process control Plan provides a general description of activities, which will occur during 242-A Evaporator Campaign 99-1 and to document analyses conducted to demonstrate that 102-AW waste is acceptable for processing. Predict is a registered trademark of Risk Decisions England Corporation, United Kingdom.
Date: August 25, 1999
Creator: Le, E. Q.
System: The UNT Digital Library
242-A MCS Logic Acceptance Test Report for Year 2000 Upgrade (open access)

242-A MCS Logic Acceptance Test Report for Year 2000 Upgrade

242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. Testing was performed per test procedure HNF-3568. There were no unresolved exceptions. The system responded correctly to all testing and meets the requirements to operate the 242-A This report documents the acceptance test results for the Evaporator facility.
Date: August 31, 1999
Creator: Teats, M. C.
System: The UNT Digital Library