10-MWe pilot-plant-receiver panel test requirements document solar thermal test facility (open access)

10-MWe pilot-plant-receiver panel test requirements document solar thermal test facility

Testing plans for a full-scale test receiver panel and supporting hardware which essentially duplicate both physically and functionally, the design planned for the Barstow Solar Pilot Plant are presented. Testing is to include operation during normal start and shutdown, intermittent cloud conditions, and emergencies to determine the panel's transient and steady state operating characteristics and performance under conditions equal to or exceeding those expected in the pilot plant. The effects of variations of input and output conditions on receiver operation are also to be investigated. Test hardware are described, including the pilot plant receiver, the test receiver assembly, receiver panel, flow control, electrical control and instrumentation, and structural assembly. Requirements for the Solar Thermal Test Facility for the tests are given. The safety of the system is briefly discussed, and procedures are described for assembly, installation, checkout, normal and abnormal operations, maintenance, removal and disposition. Also briefly discussed are quality assurance, contract responsibilities, and test documentation. (LEW)
Date: August 25, 1978
Creator: unknown
System: The UNT Digital Library
Experimental power reactor dc generator energy storage study (open access)

Experimental power reactor dc generator energy storage study

This study covers the use of dc generators for meeting the Experimental Power Reactor Ohmic Heating Energy Storage Requirements. The dc generators satisfy these requirements which are the same as defined in WFPS-TME-038 which covered the use of ac generators and homopolar generators. The costs of the latter two systems have been revised to eliminate first-of-a-kind factors. The cost figures for dc generators indicate a need to develop larger machines in order to take advantage of the economy-of-scale that the large ac machines have. Each of the systems has its own favorable salient features on which to base a system selection.
Date: August 25, 1978
Creator: Heck, F.M.; Smeltzer, G.S.; Myers, E.H. & Kilgore, L.
System: The UNT Digital Library
Factors affecting the deformation of tungsten (a literature survey) (open access)

Factors affecting the deformation of tungsten (a literature survey)

Background information relative to wrought tungsten forming was required in support of development studies. Seven principal areas of tungsten metallurgy were of interest: fabrication methods, delamination, recrystallization, heat treatment, fracture characteristics, impurity effects, and surface treatments. Pertinent information in Metal Abstracts from 1967 to mid 1977 was summarized for each area. Only a few papers were reviewed in their entirety; the great majority of information was derived from abstracts of the papers. 61 references.
Date: August 25, 1978
Creator: Ludwig, R.L.
System: The UNT Digital Library