Determination of basalt physical and thermal properties at varying temperatures, pressures, and moisture contents. Second progress report, fiscal year 1979 (open access)

Determination of basalt physical and thermal properties at varying temperatures, pressures, and moisture contents. Second progress report, fiscal year 1979

The rock mechanics testing performed at the Earth Mechanics Institute of the Colorado School of Mines for Rockwell Hanford Operations under Subcontract SA-917 is summarized. Cores were supplied from drill hole DC-8 on the Hanford Site, characterized geologically, and tested for thermal and physical properties for designing long-term underground storage of radioactive waste materials. This report presents the approved test procedures, results, and data analysis for this test series. Results indicate significantly lower strengths for drill hole DC-8 than determined for drill hole DC-6 or for the drill holes reported on in our fiscal year 1978 (FY 78) tests. Trends, however, were found to be similar between drill holes DC-6 and DC-8, and it is hoped more definitive conclusions can be found following completion of the final series of tests.
Date: August 13, 1979
Creator: Miller, R. J.
System: The UNT Digital Library
Determination of basalt physical and thermal properties at varying temperatures, pressures, and moisture contents. Third progress report, fiscal year 1979 (open access)

Determination of basalt physical and thermal properties at varying temperatures, pressures, and moisture contents. Third progress report, fiscal year 1979

The rock mechanics testing performed at the Earth Mechanics Institute of the Colorado School of Mines for Rockwell Hanford Operations under subcontract SA-917 is summarized. Cores were supplied from drill hole DC-4 on the Hanford Site, characterized geologically, and tested for thermal and physical properties for designing long-term underground storage of radioactive waste materials. The approved test procedures, results, and data analysis for this test series are presented. Uniaxial and triaxial results indicate strengths similar to drill hole DC-6, but significantly higher than drill hole DC-8. Trends with density, depth, confining pressure, and temperature, however, were similar for the three drill hole locations tested.
Date: August 31, 1979
Creator: Miller, R. J.
System: The UNT Digital Library
Wire rope improvement program. Fiscal years 1979 to 1980. Interim report (open access)

Wire rope improvement program. Fiscal years 1979 to 1980. Interim report

This report describes the work performed by the Pacific Northwest Laboratory and its subcontractor Battelle Columbus Laboratories on the Wire Rope Improvement Program during FY-1979 and the first half of FY80. The program, begun in 1975 by the US Bureau of Mines, was transferred to the US Department of Energy (DOE) on October 1, 1978. Since that time, the DOE's Division of Solid Fuels Mining and Preparation has sponsored the program. To address identified problems and provide information from which behavior of large-diameter wire rope could be better understood, efforts in the following areas were undertaken: large-diameter rope testing, small-diameter rope testing, data analysis and evaluation, wear and failure analysis, load sensor development, and technology transfer. Wire ropes 3/4 in., 1-1/2 in., and 3 in. in diameter were tested in bend-over sheave fatigue. Attempts were made to correlate fatigue life of these ropes. Limited field rope data were available to compare with test results. The modes of failure and wear in laboratory ropes were compared with those seen previously in field ropes. A load sensor was designed and ordered in FY79. It will be connected to the drag rope and jewelry of working draglines during the summer of FY80. Technology …
Date: August 1, 1980
Creator: Morgenstern, M. H.; Alzheimer, J. M.; Anderson, W. E.; Beeman, G. H.; Rice, R.C.; Strope, L. A. et al.