Well test plan for the City of El Centro utility core field experiment (open access)

Well test plan for the City of El Centro utility core field experiment

The following are included in the well test plan: well test program schedule and order of work; the injection well drilling program details; the production well drilling program details; and long-term (30-day) production testing program details. (MHR)
Date: June 15, 1981
Creator: unknown
System: The UNT Digital Library
Prefabricated heat-exchanging fireplace. Final technical report (open access)

Prefabricated heat-exchanging fireplace. Final technical report

A heat-exchanging fireplace was installed in a 2000 square foot home and the standard air distribution equipment was ducted directly to the forced-air heating system of the home. The standard air distribution equipment for the fireplace included two squirrel-cage blowers which were connected to a thermostat, allowing a choice of temperature ranges; and a snap disc thermostat was used to disconnect the blowers in order to avoid blowing cold air after the fire died out. Arranged in this manner, one is able to set the regular home thermostat a few degrees lower than the fireplace thermostat, and this will allow the regular heating system to turn on after the fire has gone out in the fireplace. Energy consumption in both the fireplace and the conventional heating system was monitored throughout a heating season and then compared with past heating seasons when only a conventional heating system was used.
Date: June 15, 1981
Creator: Schleper, M. A.
System: The UNT Digital Library
Gamma-ray spectrometric determination of UF/sub 6/ assay with 1 percent precision for international safeguards. Part 1: product and feed in 1S and 2S sample cylinders (open access)

Gamma-ray spectrometric determination of UF/sub 6/ assay with 1 percent precision for international safeguards. Part 1: product and feed in 1S and 2S sample cylinders

The method is based on counting the 186-keV gamma rays emitted by /sup 235/U using a Pb-collimated Ge(Li) detector. Measurements of fifty UF/sub 6/ product and feed cylinders reveal the following precisions and counting times: Product - 2S, 0.98% (600 s); Feed - 2S, 0.48% (2500 s); Product - 1S, 0.62% (1000 s); Feed - 1S, 0.73% (3000 s). A 1% precision is desired for variables - attributes verification measurements of /sup 235/U assay in UF/sub 6/ sample cylinders for safeguards inspections by the International Atomic Energy Agency (IAEA). Statistically, these measurements stand between fine, high-precision (or variables) measurements and gross, low-precision (or attributes) ones. Because of their intermediate precisions, the variables-attributes measurements may not require analysis of all samples, and this could result in significant savings of IAEA inspector time. Although the precision of the above results is satisfactory, the average relative differences between gamma-ray and mass-spectrometric determinations for the last two sets of measurements (1S cylinders) have positive biases.
Date: June 15, 1981
Creator: Ricci, E.
System: The UNT Digital Library
Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Milbank NTMS Quadrangle (Minnesota, North Dakota, South Dakota) (open access)

Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Milbank NTMS Quadrangle (Minnesota, North Dakota, South Dakota)

"Results of a reconnaissance geochemical survey are reported for the Milbank Quadrangle, Minnesota; North Dakota; South Dakota. Statistical data and areal distributions for uranium and uranium-related variables are presented for 662 groundwater and 319 stream sediment samples. Also included is a brief discussion on location and geologic setting." (from Abstract)
Date: June 15, 1981
Creator: National Uranium Resource Evaluation Program
System: The UNT Digital Library