Metallurgical Examination of HRT Leak Detector Tubing and Flanges (open access)

Metallurgical Examination of HRT Leak Detector Tubing and Flanges

After several failures had occurred in the HRT leak detector system, several lengths of this tubing were removed for metallurgical examination. The tubing was of type 304 stainless steel and was 1/4" in diameter with a 0.065 wall. The tubing had been purchased as three different lots, the first in 45 ft. lengths and the other two as standards lengths. Tubing from the first lot was used primarily for the shield penetration and, therefore, sections of it are present in all lines of the system. It appears that chloride contamination entered the system in a portion of the first lot of tubing used for the shield penetration. The exact source of the chloride cannot be determined, but after considering the results and visiting the manufacturer's plant, it appears most likely the contamination was during the manufacturing process.
Date: January 31, 1957
Creator: Adamson, G. M; Hammond, T. M.; Kegley, T. M. & White, J. K.
System: The UNT Digital Library
Thorex Pilot Plant ; System for Concentrating Second Uranium Cycle Product (open access)

Thorex Pilot Plant ; System for Concentrating Second Uranium Cycle Product

A system for concentrating uranyl nitrate solutions was designed and installed in the Thorex Pilot Plant. A total of 16,060 g of uranium was concentrated in the system in 68 batch runs. A total of 14,400 g total uranium (14.180 g U/sup 233/) was recovered as product suitable for shipment. Uranium loss to the evaporator condensate was 0.03% of the total uranium processed. The material balance across the system was 98.4%. The average concentration of uranium in the evaporator feed solution was 29 g/liter; the average concentration in the evaporated solution was 298 g U/liter and in the product solution was 199 g/liter. Radiation readings of bottles containing product solutions were taken with a hard-shell cutie pie immediately after each run, and these readings ranged from 35 to 1100 mr/hr. The radiation levels of the bottles of product solution shipped averaged 78 mr/hr. Bottles of product solution reading in excess of 300 mr/hr, maximum allowable for shipment. were reprocessed in the second-cycle solvent extraction system (Thorex) and reconcentrated. The products from seven runs had radiation levels in excess of 300 mr/hr at the time of concentration, or the activities had grown to that level by the time of shipment. The …
Date: January 28, 1957
Creator: Albrecht, W. L.
System: The UNT Digital Library
Determination of Submicron Particle Sized by an Activation Analysis - Centrifugation Method (open access)

Determination of Submicron Particle Sized by an Activation Analysis - Centrifugation Method

The feasibility of determining particle sizes in the submicron range by employing an activation analysis - centrifugation method has been demonstrated. It is believed that this method is now applicable to the analysis of thorium oxide for submicron particles. The same techniques are, in most instance, usable in determining particle sized in other sample materials.
Date: January 29, 1957
Creator: Bate, L. C. & Leddicotte, G. W.
System: The UNT Digital Library
Power Distribution of Tower Shielding Facility Reactor (TSR) (open access)

Power Distribution of Tower Shielding Facility Reactor (TSR)

The horizontal and vertical power distribution for a 5 x 7 fuel element loading of the TSR is presented. (auth)
Date: January 17, 1957
Creator: Blessing, W. G.
System: The UNT Digital Library
Stress-Corrosion Cracking Problems in the Homogeneous Reactor Test (open access)

Stress-Corrosion Cracking Problems in the Homogeneous Reactor Test

Chloride-induced stress-corrosion cracking has been encountered in the Homogeneous Reactor Test during the preliminary testing. The rector is constructed of austenitic stainless steels. It is unique in that it will operate at 250 to 300 C with an aqueous uranyl sulfate solution fuel containing 200 to 500 ppm of dissolved oxygen. The cracking has occurred in a secondary system used for detecting leaks in the flanged joints of the primary systems and in the grooves of flanges in the primary systems. Tubing used in the leak-detection system was found to be contaminated with chloride introduced during manufacture.
Date: January 31, 1957
Creator: Bohlmann, E. G. & Adamson, G. M.
System: The UNT Digital Library
Uranium Recovery for Spent Fuel by Dissolution in Fused Salt and Fluorination (open access)

Uranium Recovery for Spent Fuel by Dissolution in Fused Salt and Fluorination

A promising nonaqueous process for the recovery of uranium from spent fuel elements is under development at Oak Ridge National Laboratory. This process consists of dissolution of the fuel element in a fluoride melt by hydrofluorination at 600 to 700°C, direct fluorination with fluorine for the production and volatilization of UF6, with further decontamination of the product UF6 from fission product activity being secured in a NaF absorption-desorption step. Good decontamination is obtained in the fluorination step due to the low volatility of most of the fission product fluorides. An over-all decontamination factor greater than 106 with adequate uranium recovery has been demonstrated in laboratory scale tests using a double bed procedure for the NaF step. A pilot plant has been constructed for testing the process with various heterogeneous fuel elements. The engineering and operational features of the pilot plant are described
Date: January 29, 1957
Creator: Cathers, G. I.
System: The UNT Digital Library
Calculation of Shield Induced Gamma Radiation Escaping Through Openings in a Biological Shield -- Application to the HRT (open access)

Calculation of Shield Induced Gamma Radiation Escaping Through Openings in a Biological Shield -- Application to the HRT

A method was developed for calculating shield induced gamma radiation escaping through openings in a biological shield. The method was applied to the HRT and the results indicated that the contribution to the dose from induced activity in the HRT shield was around 0.1 r/hr and was insignificant in comparison to to other mechanisms contributing to the escape of gamma rays through shield openings.
Date: January 11, 1957
Creator: Claiborne, H. C. & Fowler, T. B.
System: The UNT Digital Library
Estimated Gamma Radiation Levels at Access Holes in the HRT Shielding (open access)

Estimated Gamma Radiation Levels at Access Holes in the HRT Shielding

An estimate has been made of the gamma radiation levels at access holes in the HRT Shielding when the plugs have been removed to service or maintain the reactor. In every case the radiation level at the holes was greater than the maximum permissible exposure rate of 0.3 roentgens per week. The radiation through the holes can be attenuated to some extent by flooding the reactor cell up to the flange to be disconnected. However, shielding would still be required and it is more practical to provide a small additional shield thickness to compensate for the moderate attenuation that could be gained from flooding.
Date: January 24, 1957
Creator: Collins, C. W.
System: The UNT Digital Library
Test of Stainless Steel Freeze Jacket to be Used on 1/2-inch High Pressure and High Temperature Process Lines (open access)

Test of Stainless Steel Freeze Jacket to be Used on 1/2-inch High Pressure and High Temperature Process Lines

In order to test the operation of a freeze jacket in air with the process fluid closely following the conditions found in the high pressure circulation loop of a homogeneous reactor, or, 2000 psi and 300C, a test loop was built and used in conjunction with existing refrigeration equipment. The freeze jacket was made of 5/16-in. type 346 stainless steel tubing wrapped around and welded to a 1/2-in. stainless steel process line. It was concluded that for these reactor operating conditions, only a small leak rate, 11 cc/min, could be frozen off. It is recommended that, at the beginning of the the freezing operation, the temperature of the secondary refrigerant entering the freeze jacket be at least -40C and that the freeze jacket be made as long as practical.
Date: January 21, 1957
Creator: Draper, B. D.
System: The UNT Digital Library
The Chemical Processing of Two-Region Aqueous Homogenous Reactors (open access)

The Chemical Processing of Two-Region Aqueous Homogenous Reactors

A promising scheme for the chemical processing of a thorium breeder reactor of the two-region aqueous homogeneous type consists of the following operations: concentration of insoluble fission and corrosion products from the core system into a small volume of fuel solution, combining this slurry with irradiated thorium oxide slurry taken from the blanket, recovery of D2O by evaporation, dissolution of the thorium and uranium in HNO3, and, after a suitable cooling period, recovery of the uranium and thorium by solvent extraction for return to the reactor. The use of a hydroclone and underflow container arrangement for concentrating insoluble fission and corrosion products under simulated reactor conditions has been successfully demonstrated on dynamic loops. Solids concentration factors greater than 103 were demonstrated, and equilibrium solids concentration in the circulating solution less than 1 ppm was attained in these tests. Present data indicate that proper design and operation will minimize solids deposition in the reactor system and that the insoluble impurities can be effectively removed by the hydroclone. An alternate method of processing the slurry removed from the core system by the hydroclone consists of removing the room temperature insolubles by centrifugation, recovering the uranium from the supernatant by peroxide precipitation, thermal …
Date: January 29, 1957
Creator: Ferguson, D. E.
System: The UNT Digital Library
High Pressure Flange Studies (open access)

High Pressure Flange Studies

Twenty-five hundred psi ring-type flanges, ring gaskets, bolts, and special connectors were tested for adaptability to the aqueous homogenous reactor. High pressure line closures were studied to obtain empirical data pertinent to the selection or design of a connector capable of withstanding sustained thermal cycling and high pressures encountered in the aqueous homogenous reactor. Specialized stress-strain measurement techniques yielded information concerning flange deformation, ring type gaskets, bolts, and special connectors. The results indicated that no totally acceptable connector is currently available. Most promising of the combination of components tested during this period was a 2500 psi ring type flange with an accurately machined octagonal gasket and Grade B-7 bolts.
Date: January 5, 1957
Creator: Fritz, K. J.
System: The UNT Digital Library
Delay Time Prior to Dumping the HRT (open access)

Delay Time Prior to Dumping the HRT

Some refined calculations have been made, relative to a proposed delay prior to a dump, to determine the expected D2 concentration in the vent stream from the pressurizer gas bleeds during a dump of the Homogeneous Reactor Test (HRT). These calculations indicate that for vent valves have a Cv of 0.07 (venting time from 2000 psia to D2O saturation pressure of approximately 12 minutes), a delay period is not required since the D2 concentration is well below lower explosive limit. For vent valves having a Cv of 0.3 (venting time approximately 2.4 minutes), the calculation indicate that a delay before venting of approximately two minutes will be required. This is due entirely to the possibility of mass ebullition the D2. Since the pressure drops so quickly, the reactor solution becomes saturated with D2 before appreciable recombination can occur.
Date: January 10, 1957
Creator: Gift, E. H. & McLain, Howard A.
System: The UNT Digital Library
Quarterly Report of the Solution Corrosion Group for the Period Ending January 31, 1957 (open access)

Quarterly Report of the Solution Corrosion Group for the Period Ending January 31, 1957

A second test of the mockup of the Zircaloy - stainless steel transition joint as used in the HRT reactor vessel has been completed. The joint and bellows have now received 104 thermal cycles and 148 mechanical deflections. The joint and bellows have functioned properly; corrosion damage has been negligible, except for a small area on the bellows which has undergone pitting attack. Long-term runs with uranyl sulfate solutions of the concentration proposed or use in the HRT have shown the solution to be stable at 300 C. Substituting heavy water for normal water caused no difference in either corrosion or solution stability. Experiments in which chromic acid was used to pretreat stainless steel have shown that, under certain conditions, the pretreated film can exist in uranyl sulfate solutions at flow rates in excess of the critical velocity for relatively long periods of time. The practicability of using titanium inserts in high turbulent areas of stainless steel loops to minimize corrosion has been demonstrated. The corrosiveness of beryllium sulfate solutions containing dissolved uranium trioxide has been determined at 250 and 280 C. Laboratory studies with regard to stress-corrosion cracking have shown that high stressed type 347 stainless steel will crack …
Date: January 31, 1957
Creator: Griess, J. C. F.; Savage, H. C.; English, J. L.; Greeley, R. S.; Buxton, S. R.; Hess, D. N. et al.
System: The UNT Digital Library
HRT Temperature Measurement System - Issue No. 3 (open access)

HRT Temperature Measurement System - Issue No. 3

The following temperature measurement tabulation consists of two parts. Part I lists all HRT thermocouples, their location, the junction box thru which the leads pass, and their termination, if on an instrument. Part II lists all temperature read out instruments and their location. A total of 577 thermocouples are listed in this tabulation. The roughly 77,000 ft of wire used in connecting them up cost $6,799. Temperatures are read on 24 instruments. Cost of these was approximately $15,688. Accessories such as patch panels, conduit, disconnects, etc., used in installing the thermocouples cost about $8,069. Total cost for material and instruments for temperature measure comes to approximately $30,556.
Date: January 17, 1957
Creator: Grimes, J. D.
System: The UNT Digital Library
Interim Report of APPR Irradiation Test Program at MTR (open access)

Interim Report of APPR Irradiation Test Program at MTR

It is the purpose of this memo to clarify and revise burnup calculations for the APPR irradiation program and to present a proposed irradiation schedule. the report will also be in the nature of a review of the program.
Date: January 21, 1957
Creator: Gross, E. E. & Schaffer, L. D.
System: The UNT Digital Library
APPR-1 Type Absorber Rod Irradiation Test -- Irradiation Request ORNL MTR-29 (open access)

APPR-1 Type Absorber Rod Irradiation Test -- Irradiation Request ORNL MTR-29

In order to evaluate the behavior of an APPR type absorber rod, an irradiation test program has been established. Approximately 21 more samples are planned for testing under this request. The request proposes testing a full size APPR-1 type control rod in the MTR. The objective of the test is to better evaluate the neutron absorbing material proposed for the APPR-1 control rod.
Date: January 4, 1957
Creator: Gross, E. E. & Schaffter, L. D.
System: The UNT Digital Library
Cracks in HRT Flange Bolts and Ferrules (open access)

Cracks in HRT Flange Bolts and Ferrules

When it was discovered that two HRT flange bolts of a lot of 16 spares contained serious cracks, a program was launched to (1) determine the cause for the cracking, and (2) find methods for non-destructive testing the remainder of the 672 bolts shipment, a large portion of which had been installed in the HRT. Concurrently, inspection of 8 ferrules removed from an HRT flange revealed hairline cracking in 4 of them. Magnaglo, a magnetic particle inspection method using a fluorescent dye, proved to be the only definitive method for inspecting the bolts. The evidence gathered on the bolts pointed to quench cracking as the cause for the defects. Nothing abnormal was disclosed in regard to the bolt material. The alloy and heat treatment at present prescribed for the HRT bolts and ferrules are considered suitable. However, recommendations are made for plating with zinc, instead of formerly prescribed cadmium, to a thickness of 0.0002 inch, followed by a hydrogen relief treatment and a final bichromate chemical dip.
Date: January 29, 1957
Creator: Hammond, J. P.; Adamson, G. M. & Kegler, T. M., Jr.
System: The UNT Digital Library
HRT Sampler Development (open access)

HRT Sampler Development

A prototype sampler for obtaining samples of high radioactive UO2SO4 solution for use in the HRT is presented. It was successfully operated in conjunction with a low pressure water system and a high pressure, high temperature UO2SO4 system.
Date: January 22, 1957
Creator: Hannaford, B. A.
System: The UNT Digital Library
High Pressure Recombination Loop Progress Report (open access)

High Pressure Recombination Loop Progress Report

The operation and design of a high pressure recombination loop for the recombination of H2, D2, and O2 produced by the radiolytic decomposition of water which is used a solvent for fuel in the homogeneous reactors are presented.
Date: January 4, 1957
Creator: Harley, P. H.
System: The UNT Digital Library
Cross Section Program at ORNL (open access)

Cross Section Program at ORNL

Short reports to the members of the Nuclear Cross Section Advisory Group from three groups: (1) High voltage group; (2) Fast chopper time-of flight spectrometer; and (3) Electronuclear research division.
Date: January 21, 1957
Creator: Harvey, J. A. & Fowler, J. L. (Joseph L.)
System: The UNT Digital Library
HRT Source Shield Calculations (open access)

HRT Source Shield Calculations

Calculations indicate that the proposed shielding arrangement will give a dose rate at the surface of the water tank of about 100 mrem per hr., practically all gammas. This is adequate for transportation and handling, but if the radiation actually proves to be this high, a storage location isolated from normal working areas must be provided. The isolation area need not be large, however, since the calculated dose rate at 10 feet from the shielded sources is only 3.5 mrem pr hr. For the short time required to transfer the source from the water tank into the reactor the Pb carrier alone will provide sufficient shielding. At one meter from the source shielded by the Pb carrier, the dose rate is estimated to be 170 mrem per hr., with neutrons contributing he major part. With reasonable care, the operations should be carried out without excessive exposures. The results of the calculations are summarized.
Date: January 8, 1957
Creator: Haubenreich, P. N. & Rivenbark, G. W.
System: The UNT Digital Library
The Alkaline Method for Treatment of High Radiation Level Aluminum Wastes (open access)

The Alkaline Method for Treatment of High Radiation Level Aluminum Wastes

The method is based on caustic precipitation and centrifugation (which removes the Cs and small amounts of Sr, rare earths, Zr, Nb, and Ru). These are removed in the supernatant and run through a cation exchange column. This separates Zr-NB and Ru. The effluent is precipitated and the Zr-Nb is stored in an asphalt pit. The Ru then may be recovered from the precipitate. The precipitate from the original centrifugation is calcined, pressed and transported to a deep well.
Date: January 17, 1957
Creator: Higgins, I. R.
System: The UNT Digital Library
Examination of 6" Diameter "O" Ring from HRT Mockup. Metallography Report (Y-12) No. 39 (open access)

Examination of 6" Diameter "O" Ring from HRT Mockup. Metallography Report (Y-12) No. 39

A six-inch diameter "O" ring from the HRT Mockup was examined metallographically after 2452 hours exposure to uranyl sulfate solution at 300C. surface defects, except for cold work defects were found only in areas exposed to uranyl sulfates. Defects found were pits, transgranular cracks, surface cracks, and grain attacks.
Date: January 15, 1957
Creator: Kegley, T. M., Jr.
System: The UNT Digital Library
Examination of HRT "O" Ring Gaskets From Flanges A-117 and D-127. Met. Spec. Nos. X12760 and X12661. Metallography Report (Y-12) No. 40 (open access)

Examination of HRT "O" Ring Gaskets From Flanges A-117 and D-127. Met. Spec. Nos. X12760 and X12661. Metallography Report (Y-12) No. 40

The results of an examination of "O" ring gaskets remove from the HRT following a discovery that the water in the leak detector system contained 1000 ppm chloride are presented.
Date: January 14, 1957
Creator: Kegley, T. M., Jr.
System: The UNT Digital Library