Price allocation guidelines January 1980: Low-cost solar array project (open access)

Price allocation guidelines January 1980: Low-cost solar array project

The price allocation guidelines (PAG) are an integrated set of specific cost targets for several task areas within the Low-cost Solar Array (LSA) Project. PAG is a working tool of LSA Project management designed to provide consistent and meaningful guidelines for costs of polycrystalline silicon material, sheet, cells, encapsulants, and module manufacturing. It is expected that advanced photovoltaic concepts derived from industry and the research community can be developed so that it will be possible by the end of 1982 to demonstrate production processes, all process steps, and prototype equipment required to manufacture flat-plate photovoltaic modules. This demonstration would incorporate production rates and product quality consistent with a specific market price determined by the program. This stage of development has been referred to as Technical Readiness. A goal of $0.70 per peak watt (1980 dollars) has been established for the cost of electricity generated by photovoltaic modules. The processes for producing modules demonstrated to be technically ready must be amenable to scale-up so that this price goal can eventually be achieved in the marketplace. The guidelines described in this document allocate portions of that goal to each module component. Sheet materials derived from the following five technologies are considered: Czochralski, …
Date: January 15, 1980
Creator: Aster, R. W.
System: The UNT Digital Library
Progress report 13 for April 1979-August 1979 and proceedings of the 13th project integration meeting (open access)

Progress report 13 for April 1979-August 1979 and proceedings of the 13th project integration meeting

This report describes progress made by the Low-Cost Solar Array Project during the period April through August 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held August 22-23, 1979.
Date: January 1, 1979
Creator: unknown
System: The UNT Digital Library
Normative price for a manufactured product: the SAMICS methodology. Volume II. Analysis. JPL publication 78-98. [Solar Array Manufacturing Industry Costing Standards] (open access)

Normative price for a manufactured product: the SAMICS methodology. Volume II. Analysis. JPL publication 78-98. [Solar Array Manufacturing Industry Costing Standards]

The Solar Array Manufacturing Industry Costing Standards (SAMICS) provide standard formats, data, assumptions, and procedures for determining the price a hypothetical solar array manufacturer would have to be able to obtain in the market to realize a specified after-tax rate of return on equity for a specified level of production. This document presents the methodology and its theoretical background. It is contended that the model is sufficiently general to be used in any production-line manufacturing environment. Implementation of this methodology by the Solar Array Manufacturing Industry Simulation computer program (SAMIS III, Release 1) is discussed.
Date: January 15, 1979
Creator: Chamberlain, R.G.
System: The UNT Digital Library
Normative price for a manufactured product: the SAMICS methodology. Volume I. Executive summary. [Solar array manufacturing industry costing standards] (open access)

Normative price for a manufactured product: the SAMICS methodology. Volume I. Executive summary. [Solar array manufacturing industry costing standards]

The Solar Array Manufacturing Industry Costing Standards (SAMICS) provide standard formats, data, assumptions, and procedures for determining the price a hypothetical solar array manufacturer would have to be able to obtain in the market to realize a specified after-tax rate of return on equity for a specified level of production. This document summarizes the methodology and its theoretical background. It is contended that the model is sufficiently general to be used in any production-line manufacturing environment.
Date: January 15, 1979
Creator: Chamberlain, R.G.
System: The UNT Digital Library
Progress Report 16 for the period April-September 1980, and the proceedings of the 16th Project Integration Meeting (open access)

Progress Report 16 for the period April-September 1980, and the proceedings of the 16th Project Integration Meeting

Progress made by the Low-Cost Solar Array Project during the period April to September 1980, is reported in detail. Progress on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering, and operations is described. A report on, and copies of visual presentations made at, the Project Integration Meeting held September 24 and 25, 1980 are included.
Date: January 1, 1980
Creator: McDonald, R.R.
System: The UNT Digital Library