Resource Type

Serial/Series Title

Language

Operation of In-Pile Loop L-4-12 (open access)

Operation of In-Pile Loop L-4-12

Loop L-4-12 was the seventh corrosion test loop operated in HB-4 beam hole at the LITR. The loop was inserted on January 24, 1956, and removed on April 17, 1956. This loop had a titanium core which was attached to the 347 stainless steel loop with special titanium to stainless steel couplings.
Date: January 7, 1957
Creator: Walter, F. J.
System: The UNT Digital Library