Serial/Series Title

Month

Language

Moderator Evaluation for the K Piles - AGHT (CHF) and 185 W Graphite (open access)

Moderator Evaluation for the K Piles - AGHT (CHF) and 185 W Graphite

This report describes the evaluation of physical properties of AGHT and 185-W graphites that are important to pile construction and operation. On the basis of these data, purified AGHT graphite was allocated to either filler block positions in the central regions of the K piles or to the upper or lower reflectors. This decision was based on the similarities of physical properties between AGHT graphite and the other moderator components. A similar allocation could be made for 185-W graphite for some future pile if it can be successfully purified or if purification is not required.
Date: May 11, 1955
Creator: Sparks, G. R. & Riley, W. C.
System: The UNT Digital Library
Purex Pulse Generator Operation (open access)

Purex Pulse Generator Operation

A large (size 2) Purex pulse generator was installed in the 321 Building Tan Farm to pulse solutions in the prototype Purex HA Column. Flow sheet considerations indicated a need for information on leakage rates with various size weep holes in the pulse generator piston. In addition to leakage tests, experiments were conducted to determine the air required under the piston to hold the column contents away from the pulse generator piston thereby preventing leakage during shut down and the determine the time required to bleed the air trapped in the pulse leg when the column is first filled. [...] Leakage past the piston was not appreciably affected by pulse frequency. [..] Bleeding the air out of the pulse leg under start-up conditions, even with the piston weep hole plugged, was rapid. The longest time required to bleed the pulse leg was 36 minutes, which included a column-filling time of 30 minutes.
Date: May 11, 1955
Creator: McCarthy, P. B.
System: The UNT Digital Library