Language

Operation of the ORNL Graphite Reactor and the Low-Intensity Test Reactor — 1955 LITR Flux Traverses (open access)

Operation of the ORNL Graphite Reactor and the Low-Intensity Test Reactor — 1955 LITR Flux Traverses

The ORNL Graphite Reactor operated very well during 1955. The downtime was low, only 8.6%. The fuel in the bonded slugs did not perform as well in 1955 as in 1954. Much of the trouble was undoubtedly due to growth of slugs which were not beta-transformed. It is known that some slugs had grown over 1/2 in. The automatic central system installed in 1954 continued to operate satisfactorily. The cooling system gave minor trouble when one of the 900-hp fan meters had to be replaced because of shorts in the rotor. The high radiation in the canal was the largest source of trouble. Approximately 55 tons of slugs discharged from the reactor in 1952 was sent to the Metal Recovery Plant. Enough slugs had raptured, due to their long exposure in the canal and reactor, to badly contaminate of water. Most of the contamination was removed by the end of the year, but the radioactivity which had soaked into the canal wells was enough to give high radiation fields. A solution to this problem was being sought at the end of the year. A study is under way on the possibility of increasing the flux of the ORNL Graphite Reactor …
Date: September 10, 1956
Creator: Rupp, A. F. & Cox, J. A.
System: The UNT Digital Library