Sandia National Laboratories Institutional Plan FY1994--1999 (open access)

Sandia National Laboratories Institutional Plan FY1994--1999

This report presents a five year plan for the laboratory. This plan takes advantage of the technical strengths of the lab and its staff to address issues of concern to the nation on a scope much broader than Sandia`s original mission, while maintaining the general integrity of the laboratory. The plan proposes initiatives in a number of technologies which overlap the needs of its customers and the strengths of its staff. They include: advanced manufacturing technology; electronics; information and computational technology; transportation energy technology and infrastructure; environmental technology; energy research and technology development; biomedical systems engineering; and post-cold war defense imperatives.
Date: October 1, 1993
Creator: unknown
System: The UNT Digital Library
Fiscal years 1994--1998 Information Technology Strategic Plan. Volume 1 (open access)

Fiscal years 1994--1998 Information Technology Strategic Plan. Volume 1

A team of senior managers from across the US Nuclear Regulatory Commission (NRC), working with the Office of Information Resources Management (IRM), has completed an NRC Strategic Information Technology (IT) Plan. The Plan addresses three major areas: (1) IT Program Management, (2) IT Infrastructure, and (3) Information and Applications Management. Key recommendations call for accelerating the replacement of Agency workstations, implementing a new document management system, applying business process reengineering to selected Agency work processes, and establishing an Information Technology Council to advise the Director of IRM.
Date: November 1, 1993
Creator: unknown
System: The UNT Digital Library
Geothermal Energy Multi-Year Program Plan, FY 1994-1998 (open access)

Geothermal Energy Multi-Year Program Plan, FY 1994-1998

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form. (DJE 2005)
Date: April 1, 1993
Creator: unknown
System: The UNT Digital Library
Geothermal Energy Program: Five Year Plan FY 1993-1998 (open access)

Geothermal Energy Program: Five Year Plan FY 1993-1998

None
Date: December 1, 1991
Creator: unknown
System: The UNT Digital Library
Functional Design Criteria for Fy 1993-2000 Groundwater Monitoring Wells (open access)

Functional Design Criteria for Fy 1993-2000 Groundwater Monitoring Wells

The purpose of this revision is to update the Line Item Project, 93-L-GFW-152 Functional Design Criteria (FDC) to reflect changes approved in change control M-24-91-6, Engineering Change Notices (ECNs), and expand the scope to include subsurface investigations along with the borehole drilling. This revision improves the ability and effectiveness of maintaining RCRA and Operational groundwater compliance by combining borehole and well drilling with subsurface data gathering objectives. The total projected number of wells to be installed under this project has decreased from 200 and the scope has been broadened to include additional subsurface investigation activities that usually occur simultaneously with most traditional borehole drilling and monitoring well installations. This includes borehole hydrogeologic characterization activities, and vadose monitoring. These activities are required under RCRA 40 CFR 264 and 265 and WAC 173-303 for site characterization, groundwater and vadose assessment and well placement.
Date: January 1, 1996
Creator: Williams, B. A.
System: The UNT Digital Library