Collection
Serial/Series Title
1 Matching Results
Results open in a new window/tab.
Results:
1 - 1 of
1
A Revision of Computer Code POWERCO (Cost of Electricity Produced by Nuclear Power Stations) to Include Breakdowns of Power Cost and Fixed Charge Rates
Report that "describes a new version of the code, POWERC-50, which contains several changes" to the previous code, POWERCO-25, which was used to calculate "the levelized cost of electricity produced by nuclear power stations" (p. 1)
Date:
August 1969
Creator:
Salmon, Royes
System:
The UNT Digital Library