Dissolve -- silver reactor temperature requirements (open access)

Dissolve -- silver reactor temperature requirements

None
Date: August 29, 1951
Creator: Evans, L. C.
System: The UNT Digital Library
List of equipment changes required for the production of various model sizes on the RMA and RMB lines, 234-5 Building (open access)

List of equipment changes required for the production of various model sizes on the RMA and RMB lines, 234-5 Building

In order to change models on the RM Line, a number of equipment items must be either replaced or modified. Some items may not necessarily require replacement depending upon the severity of the change. The attached list of items will require replacement or modification before production can be shifted from the present model to any of the others previously produced at this plant. The equipment is part of the Remote Mechanical A and B lines of the Plutonium Finishing Plant.
Date: August 29, 1951
Creator: Beaulieu, O.F.
System: The UNT Digital Library