The Brookhaven electron analogue, 1953--1957 (open access)

The Brookhaven electron analogue, 1953--1957

The following topics are discussed on the Brookhaven electron analogue: L.J. Haworth and E.L. VanHorn letters; Original G.K. Green outline for report; General description; Parameter list; Mechanical Assembly; Alignment; Degaussing; Vacuum System; Injection System; The pulsed inflector; RF System; Ferrite Cavity; Pick-up electrodes and preamplifiers; Radio Frequency power amplifier; Lens supply; Controls and Power; and RF acceleration summary.
Date: December 18, 1991
Creator: Plotkin, M.
Object Type: Report
System: The UNT Digital Library
The Brookhaven electron analogue, 1953--1957 (open access)

The Brookhaven electron analogue, 1953--1957

The following topics are discussed on the Brookhaven electron analogue: L.J. Haworth and E.L. VanHorn letters; Original G.K. Green outline for report; General description; Parameter list; Mechanical Assembly; Alignment; Degaussing; Vacuum System; Injection System; The pulsed inflector; RF System; Ferrite Cavity; Pick-up electrodes and preamplifiers; Radio Frequency power amplifier; Lens supply; Controls and Power; and RF acceleration summary.
Date: December 18, 1991
Creator: Plotkin, M.
Object Type: Report
System: The UNT Digital Library
Hazardous Waste/Mixed Waste Treatment Building throughput study (open access)

Hazardous Waste/Mixed Waste Treatment Building throughput study

The hazardous waste/mixed waste HW/MW Treatment Building (TB) is the specified treatment location for solid hazardous waste/mixed waste at SRS. This report provides throughput information on the facility based on known and projected waste generation rates. The HW/MW TB will have an annual waste input for the first four years of approximately 38,000 ft{sup 3} and have an annual treated waste output of approximately 50,000 ft{sup 3}. After the first four years of operation it will have an annual waste input of approximately 16,000 ft{sup 3} and an annual waste output of approximately 18,000 ft. There are several waste streams that cannot be accurately predicted (e.g. environmental restoration, decommissioning, and decontamination). The equipment and process area sizing for the initial four years should allow excess processing capability for these poorly defined waste streams. A treatment process description and process flow of the waste is included to aid in understanding the computations of the throughput. A description of the treated wastes is also included.
Date: December 18, 1991
Creator: England, J. L. & Kanzleiter, J. P.
Object Type: Report
System: The UNT Digital Library
Hazardous Waste/Mixed Waste Treatment Building throughput study (open access)

Hazardous Waste/Mixed Waste Treatment Building throughput study

The hazardous waste/mixed waste HW/MW Treatment Building (TB) is the specified treatment location for solid hazardous waste/mixed waste at SRS. This report provides throughput information on the facility based on known and projected waste generation rates. The HW/MW TB will have an annual waste input for the first four years of approximately 38,000 ft{sup 3} and have an annual treated waste output of approximately 50,000 ft{sup 3}. After the first four years of operation it will have an annual waste input of approximately 16,000 ft{sup 3} and an annual waste output of approximately 18,000 ft. There are several waste streams that cannot be accurately predicted (e.g. environmental restoration, decommissioning, and decontamination). The equipment and process area sizing for the initial four years should allow excess processing capability for these poorly defined waste streams. A treatment process description and process flow of the waste is included to aid in understanding the computations of the throughput. A description of the treated wastes is also included.
Date: December 18, 1991
Creator: England, J. L. & Kanzleiter, J. P.
Object Type: Report
System: The UNT Digital Library
Design of an intermediate-scale experiment to validate unsaturated- zone transport models (open access)

Design of an intermediate-scale experiment to validate unsaturated- zone transport models

An intermediate-scale experiment is being carried out to evaluate instrumentation and models that might be used for transport-model validation for the Yucca Mountain Site Characterization Project. The experimental test bed is a 6-m high {times} 3-m diameter caisson filled with quartz sand with a sorbing layer at an intermediate depth. The experiment involves the detection and prediction of the migration of fluid and tracers through an unsaturated porous medium. Pre-test design requires estimation of physical properties of the porous medium such as the relative permeability, saturation/pressure relations, porosity, and saturated hydraulic conductivity as well as geochemical properties such as surface complexation constants and empircial K{sub d}`S. The pre-test characterization data will be used as input to several computer codes to predict the fluid flow and tracer migration. These include a coupled chemical-reaction/transport model, a stochastic model, and a deterministic model using retardation factors. The calculations will be completed prior to elution of the tracers, providing a basis for validation by comparing the predictions to observed moisture and tracer behavior.
Date: December 18, 1991
Creator: Siegel, M. D.; Hopkins, P. L.; Glass, R. J. & Ward, D. B.
Object Type: Article
System: The UNT Digital Library