2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
Preliminary summary of the Pewee I manufacturing campaign
None
Date:
April 16, 1968
Creator:
Birge, J.D.
System:
The UNT Digital Library
Status of special reactor process tube loadings, April 1, 1968
The attached pages show the status of production tests of control tube loadings in reactor process tubes containing significant amounts of SS materials. For further description of column headings and the current discharge goal exposure plan refer to Document DUN-3443. Data are in table format.
Date:
April 16, 1968
Creator:
Walton, R. P.
System:
The UNT Digital Library