States

The development of coal-based technologies for Department of Defense facilities. Semi-annual report, March 28, 1996--September 27, 1996 (open access)

The development of coal-based technologies for Department of Defense facilities. Semi-annual report, March 28, 1996--September 27, 1996

The U.S. Department of Defense (DOD), through an Interagency Agreement with the U.S. Department of Energy (DOE), has initiated a three-phase program with the Consortium for Coal-Water Fuel Technology, with the aim of decreasing DOD`s reliance on imported oil by increasing its use of coal. The program is being conducted as a cooperative agreement between the Consortium and DOE. Activities this reporting period are summarized by phase. Phase I was completed on November 1, 1995. Work on Phase II focused on emissions reductions, coal beneficiation/preparation studies, and economic analyses of coal use. Emissions reductions investigations included continuing bench-scale tests to identify an NO{sub x} reduction catalyst which is appropriate for industrial boiler applications. In addition, installation of a ceramic filtering device on the demonstration boiler started. Also, a sodium bicarbonate duct injection system was procured for installation on the demonstration boiler. Work related to coal preparation and utilization, and the economic analysis was primarily focused on preparing the final report. Work in Phase III focused on coal preparation studies and economic analyses of coal use. Coal preparation studies were focused on continuing activities on particle size control, physical separations,surface-based separation processes, and dry processing. The economic study focused on community …
Date: December 13, 1996
Creator: Miller, Bruce G.; Pisupati, Sarma V. & Scaroni, Alan W.
Object Type: Report
System: The UNT Digital Library
1.8.3 Site system engineering FY 1997 program plan (open access)

1.8.3 Site system engineering FY 1997 program plan

The FY 1997 Multi-Year Work Plan (MYWP) technical baseline describes the functions to be accomplished and the technical standards that govern the work. The following information is provided in this FY 1997 MYWP: technical baseline, work breakdown structure, schedule baseline, cost baseline, and execution year.
Date: September 13, 1996
Creator: Grygiel, M. L.
Object Type: Report
System: The UNT Digital Library
Focus Report, Volume 74, Number 25, September 1996 (open access)

Focus Report, Volume 74, Number 25, September 1996

Periodical discussing the disposal of low-level radioactive waste in Texas, including proposed legislation and arguments in favor and opposed to the new regulations.
Date: September 13, 1996
Creator: Texas. Legislature. House of Representatives. Research Organization.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History