3 Matching Results
Results open in a new window/tab.
Results:
1 - 3 of
3
Items for over-all Redox contamination improvement
In view of contamination difficulties within the Redox operation, number of items are being considered to improve this situation. It is the objective of this document to list and describe seven times which it is felt would contribute most toward improvement. It is also an objective to present for RDS-D-12 Group consideration the recommendations of representatives from Manufacturing, Technical, and Design in these matters with the expectation that a project proposal written in general terms for overall contamination improvement would be prepared.
Date:
January 13, 1955
Creator:
Rohrmann, C. A.; Wilson, B. D. & Merrill, E. T.
System:
The UNT Digital Library
Epoxy Resin Castin of Dry-Type High-Voltage Transformers, Bushings, and Potheas
None
Date:
January 13, 1955
Creator:
Park, C. W.
System:
The UNT Digital Library
Weekly report - 100 areas - January 13, 1955
None
Date:
January 13, 1955
Creator:
unknown
System:
The UNT Digital Library