Counties
20 Matching Results
Results open in a new window/tab.
Results:
1 - 20 of
20
Crews Drilling Holes
Caption says, "A-434 Four wagon drilling crews drilling holes in hard granite in Highway No. 44 cut at Station 68."
Date:
November 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Carryall Units
Caption says, "A-432 Carryalls in Borrow area south of Stations 568 to 562 on Rock Island Railroad and Highway No. 9 relocation."
Date:
November 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Dragline
Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-145 Dragline sloping bank of cut-off trench."
Date:
July 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Cutoff Trench Excavated
Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-147 North end of dike showing cut-off trench excavated into rock."
Date:
July 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Sprinkler Wetting Embankment
Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-149 Sprinkler wetting down embankment lift placed by carryalls."
Date:
July 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Grain Field after Flooding
Caption says, "A-126 Effects of flood on grain field south of Highway #62 and west of Bitter Creek bridge the next day after the flood."
Date:
July 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Placing Concrete Culvert
Caption says, "A-381 Railroad and Highway Relocation. Erecting forms for 6' x 5' reinforced conerete culvert at Station 148+03 on Santa Fe Railroad Relocation."
Date:
October 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Euclid Truck Backfilling
Caption says, "A-377 Dikes, North. Euclid truck on backfilling operations in cutoff trench. North from Station 5."
Date:
October 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Backfilling Operations
Caption says, "A-379 Dikes, North. Telephoto from hill south of North Dike showing backfilling operations in cutoff trench."
Date:
October 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Backfilling Operations
Caption says, "A-378 Dikes, North. Backfilling operations in cutoff trench. Looking south from Station 5."
Date:
October 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Excavation Operations
Caption says, "A-380 Dikes, North. Excavation operations in Barrow Area "N" for material for North Dike."
Date:
October 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Backfilling Cutoff Trench
Caption says, "A-376 Dikes, North. Backfilling in cutoff trench. North from Station 3."
Date:
October 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Laborers Drilling Holes
Caption says, "A-435 Jackhammer men drilling holes for blasting in rock cut on Highway No. 44 relocation, Station 68."
Date:
November 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Carryall Units
Caption says, "A-431 Carryall units on Rock Island Railroad Relocation, Stations 567 to 573. Changing shift from day to swing."
Date:
November 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Carryall Units Spreading Embankment Material
Caption says, "A-433 Carryall units spreading material for Rock Island Railroad embankment, vicinity of Stations 567 to 572. Center fill at right of machines."
Date:
November 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Cutoff Trench
Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-144 Looking south to end of cut-off trench. Trench is filled and lifts compacted from here to south end."
Date:
July 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Cutoff Trench with Hercules Pump
Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-146 Cut-off trench partially pumped out by a four-inch Hercules pump."
Date:
July 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Euclid Truck Dumping Material
Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-148 Euclid truck dumping embankment material in windrow."
Date:
July 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Bitter Creek Flood
Caption says, "A-124 Bitter Creek next day after the flood from the bridge."
Date:
June 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Bitter Creek Flood
Caption says, "A-125 Cotton field west of Bitter Creek and north of the bridge after the flood."
Date:
June 7, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History