20 Matching Results

Results open in a new window/tab.

Crews Drilling Holes

Caption says, "A-434 Four wagon drilling crews drilling holes in hard granite in Highway No. 44 cut at Station 68."
Date: November 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Carryall Units

Caption says, "A-432 Carryalls in Borrow area south of Stations 568 to 562 on Rock Island Railroad and Highway No. 9 relocation."
Date: November 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Dragline

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-145 Dragline sloping bank of cut-off trench."
Date: July 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench Excavated

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-147 North end of dike showing cut-off trench excavated into rock."
Date: July 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Sprinkler Wetting Embankment

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-149 Sprinkler wetting down embankment lift placed by carryalls."
Date: July 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Grain Field after Flooding

Caption says, "A-126 Effects of flood on grain field south of Highway #62 and west of Bitter Creek bridge the next day after the flood."
Date: July 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Placing Concrete Culvert

Caption says, "A-381 Railroad and Highway Relocation. Erecting forms for 6' x 5' reinforced conerete culvert at Station 148+03 on Santa Fe Railroad Relocation."
Date: October 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Euclid Truck Backfilling

Caption says, "A-377 Dikes, North. Euclid truck on backfilling operations in cutoff trench. North from Station 5."
Date: October 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Backfilling Operations

Caption says, "A-379 Dikes, North. Telephoto from hill south of North Dike showing backfilling operations in cutoff trench."
Date: October 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Backfilling Operations

Caption says, "A-378 Dikes, North. Backfilling operations in cutoff trench. Looking south from Station 5."
Date: October 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Excavation Operations

Caption says, "A-380 Dikes, North. Excavation operations in Barrow Area "N" for material for North Dike."
Date: October 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Backfilling Cutoff Trench

Caption says, "A-376 Dikes, North. Backfilling in cutoff trench. North from Station 3."
Date: October 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Laborers Drilling Holes

Caption says, "A-435 Jackhammer men drilling holes for blasting in rock cut on Highway No. 44 relocation, Station 68."
Date: November 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Carryall Units

Caption says, "A-431 Carryall units on Rock Island Railroad Relocation, Stations 567 to 573. Changing shift from day to swing."
Date: November 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Carryall Units Spreading Embankment Material

Caption says, "A-433 Carryall units spreading material for Rock Island Railroad embankment, vicinity of Stations 567 to 572. Center fill at right of machines."
Date: November 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-144 Looking south to end of cut-off trench. Trench is filled and lifts compacted from here to south end."
Date: July 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench with Hercules Pump

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-146 Cut-off trench partially pumped out by a four-inch Hercules pump."
Date: July 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Euclid Truck Dumping Material

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-148 Euclid truck dumping embankment material in windrow."
Date: July 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Bitter Creek Flood

Caption says, "A-124 Bitter Creek next day after the flood from the bridge."
Date: June 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Bitter Creek Flood

Caption says, "A-125 Cotton field west of Bitter Creek and north of the bridge after the flood."
Date: June 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History