Drilling at Rock Island Railroad Bridge

Caption says, "A-488 Setting pipe at a core drilling station at the base of center pier of the Rock Island Railroad bridge across the North Fork of the Red River."
Date: December 3, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Tamping Roller

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-139 Tamping roller compacting embankment."
Date: July 3, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Tools for Field Density Test

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-141 Some of the tools and equipment used to make field density tests."
Date: July 3, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Preparing East Dike

Caption says, "A-489 Preparing top of East Dike for placing of surfacing material. Station No. 44."
Date: December 3, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Finishing East Dike

Caption says, "A-491 Finishing top of East Dike. Looking north from Station No. 51."
Date: December 3, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Placing Concrete for Check Drop

"Caption says, "5-AL-436. Specification No. 1133. Placing concrete for number 59 check drop at Station 62+00, Altus 4.8 Lateral."
Date: December 3, 1946
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Excavating for Pipes

Caption says, "5-AL-159 Specifications No. 1133. Excavation for pipe structure by four-cubic-yard scraper. Altus 48e Lateral, Station 94+80."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Excavating for Pipes

Caption says, "5-AL-158 Specifications No. 1133. Excavation for pipe structure by four-cubic-yard scraper. Altus 48e lateral, Station 94+80."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Laborers Filling Joints

Caption says, "5-AL-161 Specifications No. 1133. Workmen filling joints in thirty-inch pipe siphon with mortar. Altus 4.8e Lateral, Station 49+35."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Lock Joint Pipe Plant

Caption says, "5-AL-162. View showing rolling and cutting of fabricated cage reinforcements at the Lock Joint Pipe Plant in Altus, Oklahoma."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Lock Joint Pipe Plant

Caption says, "5-AL-164. Workmen placing fabricated cage reinforcements over inside forms at the Lock Joint Pipe Plant in Altus, Oklahoma."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Lock Joint Pipe Plant

Caption says, "5-AL-163. View showing tying of fabricated cage reinforcements at the Lock Joint Pipe Plant in Altus, Oklahoma."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

The Gobs Three

Caption says, "5-AL-775. Project Dedication. The Gobs Three, furnish songs at the Recognition Banquet in the Altus High gymnasium. Left to right are William R. Williams, Richard Lawrence, and John Gregg."
Date: September 3, 1947
Creator: Finch, F. S.
System: The Gateway to Oklahoma History

Highway Bridge

Caption says, "5-AL-651. Specifications No. 1510. View taken looking east along centerline of highway bridge, showing spans at both new and old elevations, and span between them halfway raised."
Date: June 3, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Recognition Banquet

Caption say, "5-AL-773. Project Dedication. Recognition Banquet in the Altus High School gymnasium. Mayor Fred Mains speaks to 300 people."
Date: September 3, 1947
Creator: Finch, F. S.
System: The Gateway to Oklahoma History

Recognition Banquet

Caption says, "5-AL-774. Project Dedication. Rep. Preston Peden, from Oklahoma's Seventh District, speaking at the Recognition Banquet in the Altus High School gymnasium."
Date: September 3, 1947
Creator: Finch, F. S.
System: The Gateway to Oklahoma History

Reinforced Concrete Pipe

Caption says, "5-AL-160 Specifications No. 1133. View of thirty-inch reinforced concrete pipe in place for siphon at Station 49+35, Altus 4.8e Lateral."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Placing Loose Fill

Caption says, "5-AL-156 Specifications No. 1133. View showing placement of loose fill on right bank of Altus Canal, Station 452, about 6 1/2 miles north of Altus."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Rolling Operations

Caption says, "5-AL-157 Specifications No. 1133. View showing rolling operations on left bank of Altus Canal, Station 452."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Laborers Drilling for Blasting

Caption says, "A-729 Drilling for blasting of new crusher site south side of Santa Fe cut. Access road on right was made from rock waste from the cut."
Date: July 3, 1942
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Jacking Equipment

Caption says, "5-AL-650. Specifications No. 1510. Detail view of jacking equipment used to raise spans of State Highway No. 9 bridge in reservoir area east of Granite, Oklahoma."
Date: June 3, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Bridge Raising Process

Caption says, "5-AL-652. Specifications No. 1510. General view showing progress of bridge raising operations on State Highway No. 9 east of Granite, Oklahoma. Workmen are lifting span by means of hydraulic jacks."
Date: June 3, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Condition of Stabinol and Soil-Cement

Caption says, "A-1121 General view of Main Canal test section, showing condition of Stabinol and soil-cement linings after two months' exposure to irrigation water."
Date: December 3, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Materials Engineer Mr. Holtz

Caption says, "A-373 Dikes, North. Mr. Holtz, materials engineer, showing point where clay was struck in excavation operations in the cutoff trench, Station 3."
Date: October 3, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History