An analysis of three nuclear events in P-Tunnel (open access)

An analysis of three nuclear events in P-Tunnel

This report examines experimental results obtained from three P Tunnel events -- Mission Cyber, Disko Elm, and Distant Zenith. The objective of the study was to determine if there were any differences in the explosive source coupling for the three events. It was felt that Mission Cyber might not have coupled well because the ground motions recorded for that event were much lower than expected based on experience from N Tunnel. Detailed examination of the physical and chemical properties of the tuff in the vicinity of each explosion indicated only minor differences. In general, the core samples are strong and competent out to at least 60 m from each working point. Qualitative measures of core sample strength indicate that the strength of the tuff near Mission Cyber may be greater than indicated by results of static testing. Slight differences in mineralogic content and saturation of the Mission Cyber tuff were noted relative to the other two tests, but probably would not result in large differences in ground motions. Examination of scaled free-field stress and acceleration records collected by Sandia National Laboratory (SNL) indicated that Disko Elm showed the least scatter and Distant Zenith the most scatter. Mission Cyber measurements tend …
Date: May 3, 1994
Creator: Fourney, W. L.; Dick, R. D.; Taylor, S. R. & Weaver, T. A.
System: The UNT Digital Library
Sign-Selected Quadrupole Train (open access)

Sign-Selected Quadrupole Train

The design of the Sign-Selected Quadrupole Train for E-815 (NuTeV) is set forth. The relevant physics requirements are explained. The optics of the beam are presented, along with an explanation of the proton dumping scheme. A discussion of rates and backgrounds follows, with special care given to backgrounds from scraping and obstructions. The relevant tolerances for beam construction are given and justified by simulations of the beamline. This leads to a discussion of the beam monitoring.
Date: May 3, 1994
Creator: Bernstein, R.
System: The UNT Digital Library
Aerosol can puncture device operational test plan (open access)

Aerosol can puncture device operational test plan

Puncturing of aerosol cans is performed in the Waste Receiving and Processing Facility Module 1 (WRAP 1) process as a requirement of the waste disposal acceptance criteria for both transuranic (TRU) waste and low-level waste (LLW). These cans have contained such things as paints, lubricating oils, paint removers, insecticides, and cleaning supplies which were used in radioactive facilities. Due to Westinghouse Hanford Company (WHC) Fire Protection concerns of the baseline system`s fire/explosion proof characteristics, a study was undertaken to compare the baseline system`s design to commercially available puncturing devices. While the study found no areas which might indicate a risk of fire or explosion, WHC Fire Protection determined that the puncturing system must have a demonstrated record of safe operation. This could be obtained either by testing the baseline design by an independent laboratory, or by substituting a commercially available device. As a result of these efforts, the commercially available Aerosolv can puncturing device was chosen to replace the baseline design. Two concerns were raised with the system. Premature blinding of the coalescing/carbon filter, due to its proximity to the puncture and draining operation; and overpressurization of the collection bottle due to its small volume and by blinding of the …
Date: May 3, 1994
Creator: Leist, K. J.
System: The UNT Digital Library