High efficiency shale oil recovery. Final report, January 1, 1992--June 30, 1993 (open access)

High efficiency shale oil recovery. Final report, January 1, 1992--June 30, 1993

The Adams Counter-current shale oil recovery process is an improved retorting technology enabling highly efficient oil recovery from oil shale. The high efficiency results primarily from the following facts: it (1) recovers the ash heat to preheat the feed ore; (2) burns and uses the coke energy and (3) operates without using hot ash recycling as a heat carrier. This latter feature is doubly important, contributing to high oil yield and to the generation of highly reactive coke which can be burned below 1000{degree}F, avoiding the endothermal calcination of the mineral carbonates and helping to clean the ash of contaminants. This project demonstrates that oil shale can be retorted under the specified conditions and achieve the objectives of very high efficiency. The project accomplished the following: 51 quartz sand rotary kiln runs provided significant engineering data. A heat transfer value of 107 Btu/hr/ft{sup 2}/{degree}F was obtained at optimum RPM; eight oil shale samples were obtained and preliminary shakedown runs were made. Five of the samples were selected for kiln processing and twelve pyrolysis runs were made on the five different oil shales;average off recovery was 109% of Fisher Assay; retorted residue from all five samples was oxidized at approximately 1000{degree}F. …
Date: September 29, 1993
Creator: Adams, D. C.
System: The UNT Digital Library
Unreviewed Safety Question Determination for TOPAZ II uranium fuel pellet production at the Plutonium Handling Facility (PF-4), Technical Area 55, Los Alamos National Laboratory (open access)

Unreviewed Safety Question Determination for TOPAZ II uranium fuel pellet production at the Plutonium Handling Facility (PF-4), Technical Area 55, Los Alamos National Laboratory

Enriched uranium oxide, nitride, and carbide fuel pellets have been produced at PF-4 since the facility became operational in the late 1970s. The TOPAZ II reactors require fuel enriched to 97% uranium-235. Approximately 75 kilograms (kgs) of uranium will be processed per year in support of this program. The amount of fuel processed per year at PF-4 will not be increased for these programs, but the batch size will be increased to approximately 3 kgs of uranium. The current DOE-approved Final Safety Analysis Report (FSAR) calls for batches containing 45 grams (gms) of plutonium-239 and 172 gms of uranium-235. The impact of increasing the uranium batch size on the facility authorization basis is analyzed in the attached Safety Evaluation Worksheet. In addition, the structural modification for the transformer and vacuum pump installation, required to support the operation, is evaluated. Based on the attached Safety Evaluation, it has been determined that the change in uranium batch size does not constitute an Unreviewed Safety Question (USQ), the increase in uranium batch size does not increase the probability or consequences of any accidents previously analyzed and does not create the possibility for a new type of accident or reduce the margin of safety …
Date: September 29, 1993
Creator: Gordon, D. J. P.
System: The UNT Digital Library
High level waste (HLW) steam reducing station evaluation (open access)

High level waste (HLW) steam reducing station evaluation

Existing pressure equipment in High Level Waste does not have a documented technical baseline. Based on preliminary reviews, the existing equipment seems to be based on system required capacity instead of system capability. A planned approach to establish a technical baseline began September 1992 and used the Works Management System preventive maintenance schedule. Several issues with relief valves being undersized on steam reducing stations created a need to determine the risk of maintaining the steam in service. An Action Plan was developed to evaluate relief valves that did not have technical baselines and provided a path forward for continued operation. Based on Action Plan WER-HLE-931042, the steam systems will remain in service while the designs are being developed and implemented.
Date: September 29, 1993
Creator: Gannon, R. E.
System: The UNT Digital Library
UMTRA water sampling and analysis plan, Lakeview, Oregon (open access)

UMTRA water sampling and analysis plan, Lakeview, Oregon

The purpose of this document is to provide background, guidance, and justification for water sampling activities for the Lakeview, Oregon, Uranium Mill Tailings Remedial Action (UMTRA) processing and disposal sites. This water sampling and analysis plan will form the basis for groundwater sampling and analysis work orders (WSAWO) to be implemented during 1993. Monitoring at the former Lakeview processing site is for characterization purposes and in preparation for the risk assessment, scheduled for the fall of 1993. Compliance monitoring was conducted at the disposal site. Details of the sampling plan are discussed in Section 5.0.
Date: September 29, 1993
Creator: unknown
System: The UNT Digital Library
Development testing of the two-watt RTG heat source and Hastelloy-S/T-111 alloy compatibility studies (open access)

Development testing of the two-watt RTG heat source and Hastelloy-S/T-111 alloy compatibility studies

The two-watt radioisotope thermoelectric generator heat source capsules were tested to determine their survivability under extreme environmental conditions: high external pressure, high impact, and high internal pressure. Test results showed that the capsules could withstand external pressures of 1,000 bars and impacts at velocities near 150 meters per second. However, the results of the internal pressure tests (stress-rupture) were not so favorable, possibly because of copper contamination, leading to a recommendation for additional testing. A material compatibility study examined the use of Hastelloy-S as a material to clad the tantalum strength member of the two-watt radioisotopic heat source. Test capsules were subjected to high temperatures for various lengths of time, then cross sectioned and examined with a scanning electron microscope. Results of the study indicate that Hastelloy-S would be compatible with the underlying alloy, not only at the normal operating temperatures of the heat source, but also when exposed to the much higher temperatures of a credible accident scenario.
Date: September 29, 1993
Creator: Howell, E. I. & Teaney, P. E.
System: The UNT Digital Library
US energy industry financial developments, 1993 second quarter (open access)

US energy industry financial developments, 1993 second quarter

US Energy Industry Financial Developments, 1993 Second Quarter provides information on the financial performance of energy companies during the most recent reporting period. The data are taken from public sources such as the Wall Street Journal, Energy Information Administration publications, corporate press releases, and other public sources. Based on information provided in 1993 second quarter financial disclosures, net income for 114 petroleum companies--including 19 majors--rose 33 percent between the second quarter of 1992 and the second quarter of 1993. Both upstream (oil and gas exploration, development and production) operations and downstream (petroleum refining, marketing, and transport) contributed to the improved financial Performance of petroleum companies consolidated operations. Rate-regulated industries also showed positive income growth between the second quarter of 1992 and the second quarter of 1993 due to higher natural gas prices and increased electricity consumption.
Date: September 29, 1993
Creator: unknown
System: The UNT Digital Library