G.E. Co. Hanford Works - Project C-431-A production facility - Sec. A, subcontract G-363, revised design report (open access)

G.E. Co. Hanford Works - Project C-431-A production facility - Sec. A, subcontract G-363, revised design report

The 100-C project is to be located adjacent to the present 100-P Area. It is planned to build an addition to the present 181-B River Pump House using the same elevations for pump settings, intakes, and floors as for the present pump house, thus maintaining the same suction conditions and flood protection as B Area. The 105 Building will be located on higher ground than B Area and, therefore, protection against possible flood damage is assured.
Date: March 29, 1951
Creator: unknown
System: The UNT Digital Library
General Electric Company Hanford Works, Project C-431-A Production Facility-Section A, design report (open access)

General Electric Company Hanford Works, Project C-431-A Production Facility-Section A, design report

The 100-C project is to be located adjacent to the present 100-B Area. It is planned to build an addition to the present 181-B river pump house using the same elevations for pump settings, intakes, and floors as for the present pump house, thus maintaining the same suction conditions and flood protection as B Area. The 105 Building will be located on higher ground than B Area and therefore, protection against possible flood damage is assured. This report is divided into the following sections: (1) general description of project; (2) addition to existing river pump house; (3) raw water lines from 181-B addition to 183-C lead house; (4) the 183-C filter plant; (5) 190-C process pump house; (6) power house addition; (7) high tanks; (8) retention basins; (9) outside streamlines; (10) primary substation; (11) outside underground lines; (12) outside electric lines; (13) roads, railroads, walks, fences; (14) structural design of all buildings; and (15) architectural design of all buildings.
Date: March 29, 1951
Creator: Colburn, R. T.
System: The UNT Digital Library
Sound from a two-blade propeller at supersonic tip speeds (open access)

Sound from a two-blade propeller at supersonic tip speeds

Report presents the results of sound measurements at static conditions made for a two-blade 47-inch-diameter propeller in the tip Mach number range 0.75 to 1.30. For comparison, spectrums have been obtained at both subsonic and supersonic tip speeds. In addition, the measured data are compared with calculations by the theory of Gutin which has previously been found adequate for predicting the sound at subsonic tip speeds. Curves are presented from which the maximum over-all noise levels in free space may be estimated if the power, tip Mach number, and distance are known.
Date: March 29, 1951
Creator: Hubbard, Harvey H. & Lassiter, Leslie W.
System: The UNT Digital Library
Survey of required equipment charges for RMA and RMB lines, 234-5 Building, incurred by model changes (open access)

Survey of required equipment charges for RMA and RMB lines, 234-5 Building, incurred by model changes

None