Soil-Cement Lining

Caption says, "5-AL-643. General view of equipment used to patch plastic soil-cement lining on West 11.5 Lateral."
Date: May 27, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

White Pigment - Experimental Soil-cement

Caption says, "5-AL-602. Experimental soil-cement lining, West 11.5 Lateral. Condition of lining coated with white pigment curing compound 24 hours after placing. Station 210+00."
Date: May 7, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

White Pigment - Experimental Soil-cement

Caption says, "5-AL-609. Experimental soil-cement lining, West 11.5 Lateral. Condition of lining coated with white pigment curing compound 3 days after placing. Station 210+00."
Date: May 9, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

White Pigment - Experimental Soil-cement

Caption says, "5-AL-606. Experimental soil-cement lining, West 11.5 Lateral. Condition of lining coated with white pigment curing compound 2 days after placing. Station 210+00."
Date: May 8, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Transition of Highway Siphon

Caption says, "5-AL-570. Specifications No. 1374. Forms and steel placement on outlet transition of highway siphon at Station 839+50, Altus Canal."
Date: May 1, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

South Dike Embankment

Caption says, "A-915 View of completed South Dike embankment from the left abutment before placing rock blanket on rip rap on slopes."
Date: May 20, 1944
Creator: George, P. W.
System: The Gateway to Oklahoma History

Stabinol Lining

Caption says, "5-AL-189. View showing deterioration of Stabinol lining in test section of Main Canal at Station 26-50. View looking upstream."
Date: May 20, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

South Dike Embankment

Caption says, "A-916 View of completed South Dike embankment from reservoir side."
Date: May 20, 1944
Creator: George, P. W.
System: The Gateway to Oklahoma History

Reinforced Concrete Pipe

Caption says, "5-AL-160 Specifications No. 1133. View of thirty-inch reinforced concrete pipe in place for siphon at Station 49+35, Altus 4.8e Lateral."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Placing Loose Fill

Caption says, "5-AL-156 Specifications No. 1133. View showing placement of loose fill on right bank of Altus Canal, Station 452, about 6 1/2 miles north of Altus."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Weed Control

Caption says, "5-AL-935. Weed Control. View of burned and unburned sides of Altus 9.9f lateral. The left side had been burned a few hours previously by truck-mounted weed burner. Looking upstream from near Station 30. Weir in background."
Date: May 13, 1948
Creator: George, P. W.
System: The Gateway to Oklahoma History

Storm Damage

Caption says, "5-AL-1131. Storm damage. View of West Canal, looking upstream at Station 270, showing erosion of bank caused by excess water at inlet end of culvert under canal overflowing into canal prism."
Date: May 25, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Storm Damage

Caption says, "5-AL-1132. Storm damage. View showing outlet end of culvert under West Canal at Station 270, showing outlet channel. High water line in outlet channel indicated by drift above culvert wings."
Date: May 25, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Rolling Operations

Caption says, "5-AL-157 Specifications No. 1133. View showing rolling operations on left bank of Altus Canal, Station 452."
Date: May 3, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Experimental Soil-cement

Caption says, "5-AL-597. Experimental soil-cement lining. Elevated view of the Ekenstam Canal Paver in operation on the West 11.5 Lateral. The paver underwent extensive modifications after these photographs were made."
Date: May 1, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Experimental Soil-cement

Caption says, "5-AL-599. Experimental soil-cement lining. Front view of Chattin Ditcher in the West 11.5 Lateral. An attempt was made to use this ditcher to line the lateral with soil-cement during the period that necessary modifications were being made on the Ekenstam Canal Paver."
Date: May 1, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Experimental Soil-cement

Caption says, "5-AL-600. Experimental soil-cement lining. Rear view of the Chattin Ditcher in the West 11.5 Lateral. An attempt was made to use this ditcher to line the lateral with soil-cement during the period that necessary modifications were being made on the Ekenstam Canal Paver."
Date: May 1, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Hughs & Coffey Addition

Caption says, "5-AL-553. CONDEMNATION 3323. View looking southwest along drainage area from northeast corner of Block 5, Hughs & Coffey addition, in the town of Blair, Oklahoma."
Date: May 1, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

MK&T Railroad

Caption says, "5-AL-571. Specifications No. 1374. View looking downstream showing initial construction for siphon under M K & T railroad at Station 935+70, Altus Canal."
Date: May 1, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

MK&T Railroad

Caption says, "5-AL-572. Specifications No. 1374. View looking downstream showing initial construction for siphon under M K & T railroad at Station 935+70, Altus Canal."
Date: May 1, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Crane and Bridge

Caption says, "5-AL-583. Specifications No. 1510. Completed concrete piers at extreme west end of bridge. Pouring operations had begun on second set of piers. Concrete is brought up to the bridge by means of crane and carriage as shown."
Date: May 2, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Crane and Bridge

Caption says, "5-AL-584. Specifications No. 1510. Completed concrete piers at extreme west end of bridge. Pouring operations had begun on second set of piers. Concrete is brought up to the bridge by means of crane and carriage as shown."
Date: May 2, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Looking at Bridge

Caption says, "5-AL-582. Specifications No. 1510. General view looking northeast showing spans Nos. 1-2 in elevated position. Concrete forms are in place for placing concrete in piers."
Date: May 2, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Bridge in Raised Position

Caption says, "5-AL-581. Specifications No. 1510. View looking west showing span No. 2 in raised position."
Date: May 1, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History