Environmental Assessment of Remedial Action at the Naturita Uranium Processing Site Near Naturita, Colorado. Revision 2 (open access)

Environmental Assessment of Remedial Action at the Naturita Uranium Processing Site Near Naturita, Colorado. Revision 2

The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup …
Date: January 1, 1994
Creator: unknown
System: The UNT Digital Library
UMTRA Project Water Sampling and Analysis Plan, Durango, Colorado (open access)

UMTRA Project Water Sampling and Analysis Plan, Durango, Colorado

Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.
Date: January 1, 1994
Creator: unknown
System: The UNT Digital Library
Site-Specific Analysis of Radiological and Physical Parameters for Cobbly Soils at the Gunnison, Colorado, Processing Site. Revision 1 (open access)

Site-Specific Analysis of Radiological and Physical Parameters for Cobbly Soils at the Gunnison, Colorado, Processing Site. Revision 1

The remedial action at the Gunnison, Colorado, processing site is being performed under the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Under UMTRCA, the US Environmental Protection Agency (EPA) is charged with the responsibility of developing appropriate and applicable standards for the cleanup of radiologically contaminated land and buildings at 24 designated sites, including the Gunnison, Colorado, inactive processing site. Section 108 of Public Law 95-604 states that the US Department of Energy (DOE) shall ``select and perform remedial actions at the designated processing sites and disposal sites in accordance with the general standards`` prescribed by the EPA. Regulations governing the required remedial action at inactive uranium processing sites were promulgated by the EPA in 1983 and are contained in 40 CFR Part 192 (1993), Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings. This document describes the radiological and physical parameters for the remedial action of the soil.
Date: January 1, 1994
Creator: unknown