SUMMARY REPORT ON DESIGN AND DEVELOPMENT OF HIGH TEMPERATURE GAS-COOLED POWER PILE
None
Date:
September 15, 1947
Creator:
McCullough, C.R.
Object Type:
Report
System:
The UNT Digital Library
Interim report No. 2 on Production Test No. 105-17-P, Laboratory evaluation of proposed lubricants
The lubricant (Calel A-60) used to reduce pushing forces when discharging slugs from pile tubes forms a cloudy emulsion with water. During the initial period of operation at 100 B and D areas, spillage of lubricant during discharge produced so much cloudiness in the basin water that it interfered with sorting operations. An investigation was started to see if a lubricant could be found that would effectively lubricate tubes during discharge and which would form optically clear systems when mixed with water. This report presents the data on a number of lubricants which were suggested for test.
Date:
May 15, 1945
Creator:
Bankoff, S. G.
Object Type:
Report
System:
The UNT Digital Library
The Solubility of Sodium Uranyl Carbonate
None
Date:
July 15, 1945
Creator:
Mundy, R. J. & Bunce, W. E.
Object Type:
Report
System:
The UNT Digital Library
Production of Finished Metal
None
Date:
August 15, 1945
Creator:
Thompson, Dr. J. G.
Object Type:
Report
System:
The UNT Digital Library
[Office of Hanford Directed Operations events of importance for week ending July 13, 1949]
This report details events of importance reported by the Hanford Operations Office for the week ending July 13, 1949.
Date:
July 15, 1949
Creator:
Schlemmer, F. C.
Object Type:
Report
System:
The UNT Digital Library
[Office of Hanford Directed Operations events of importance for week ending April 13, 1949]
This report details events of importance reported by the Hanford Operations Office for the week ending April 13, 1949.
Date:
April 15, 1949
Creator:
Schlemmer, F. C.
Object Type:
Report
System:
The UNT Digital Library
234-5 Project, Specification Letter 234-9, 235-9, Analytical Control Laboratory
This document presents the details of the design of the analytical control laboratory for the 234-5 project at the Hanford site.
Date:
December 15, 1947
Creator:
Curtis, R.E.
Object Type:
Report
System:
The UNT Digital Library
Preparation of bismuth powder
The Purpose of this manual is to describe preparation of bismuth powder for use in process operations. Bismuth powder is to be prepared in Room 232 of ``T`` Building where all necessary apparatus is installed.
Date:
February 15, 1949
Creator:
Cox, G.C.
Object Type:
Report
System:
The UNT Digital Library