100 Areas, January 1 through January 7, 1946 (open access)

100 Areas, January 1 through January 7, 1946

During this period the B Pile operated at its assigned power level of 25 MW below rated level, except for 10 hours on January 5. The operating level of the D Pile remained at 25 MW below rating. The rate gain in excess reactivity during equilibrium operation has been about 1.8 inhours/day. On January 1, the power level of the F Pile was dropped to 25 MW below rating from its previous rated level. Rod A was in a favorable position to make a determination of the reactivity coefficients at the time. The data does indicate an upper limit of {minus}0.21 ih/MW for the metal coefficient. An overall coefficient of 0.20 ih/MW was obtained. The unit was shut down on January 3 for discharge of 129 tubes of metal. A summary of the present reactivity states of the B, D, and F Piles are given. Iron content of process water for the three piles is also given.
Date: January 11, 1946
Creator: Jordan, W. E.
System: The UNT Digital Library
300 Area monthly report for January (open access)

300 Area monthly report for January

This report review the work being conducted in the 300 area of the Hanford production facility for the month of January.
Date: February 11, 1946
Creator: Kidder, C. P.
System: The UNT Digital Library
100 Areas technical activities report -- Physics, November 1946 (open access)

100 Areas technical activities report -- Physics, November 1946

This report divides the activities for November into three sections: D Pile; F Pile; and general physics. During November the D Pile was down twice for regularly scheduled shutdowns. Two scram occurred during the month, both of short duration. Five Special Request 15 tubes were discharged and recharged with Special Request 15. Some 13 inhour of reactivity were gained during the month. Vertical rod thimbles, 10 through 22, were tested. A Production Test was performed to determine the reactivity power coefficients of the F Pile at low power levels and with practically no xenon poison remaining. Additional experience in the use of temporary poison columns during an extended shutdown of the pile was obtained during the month. Four new bismuth columns were charged during the month and six tubes were charged with LiF. The F Pile had not yet returned to xenon equilibrium following the shutdown of November 27 at the end of the month, but conditions just prior to this shutdown indicate a loss of one inhour since October 31. Two sets of specimens were removed from the ``B`` Test Hole of the F Pile on November 4. Samples were also machined from graphite removed from the No. 9 …
Date: December 11, 1946
Creator: Gast, P. F.
System: The UNT Digital Library
RADON MEASUREMENTS IN WAREHOUSE AND BOX CARS CONTAINING HIGH GRADE ORE (open access)

RADON MEASUREMENTS IN WAREHOUSE AND BOX CARS CONTAINING HIGH GRADE ORE

None
Date: February 11, 1946
Creator: Anonsen, S.H.
System: The UNT Digital Library
A study of the quartz fiber balance No. II (open access)

A study of the quartz fiber balance No. II

This report describes calibration studies for the quartz microbalance {number_sign}2 and problems with drift.
Date: April 11, 1946
Creator: Nelson, G. A.
System: The UNT Digital Library