A Study of Reactor Systems for the Production of Tritium and Radioactive Cobalt (open access)

A Study of Reactor Systems for the Production of Tritium and Radioactive Cobalt

"A conceptual design study of reactors for the join production of tritium and colbat-60 has been made. The study covered a family of four reactors raging in thermal power from 16.5 MW to 150 MW, and designed for corresponding annual productions ranging from 0.5 to 5.0 million curies of tritium respectively."--P. v.
Date: June 8, 1959
Creator: unknown
System: The UNT Digital Library
Homogeneous Reactor Project Quarterly Progress Report: February-April 1959 (open access)

Homogeneous Reactor Project Quarterly Progress Report: February-April 1959

Report documenting the ongoing research and developments of the Oak Ridge National Laboratory's Homogeneous Reactor Project.
Date: August 8, 1959
Creator: Oak Ridge National Laboratory
System: The UNT Digital Library
Study of Factors Influencing Ductility of Iron-Aluminum Alloys. Monthly Letter Report No. 8, 15 March 1959 to 15 March 1960 (open access)

Study of Factors Influencing Ductility of Iron-Aluminum Alloys. Monthly Letter Report No. 8, 15 March 1959 to 15 March 1960

Studies are being made on the effects of variation of aluminum content, heat treatment, surface preparation, and other metallurgical factors on the room temperature ductility of Al-- Fe alloys. It is estimated that approximately 65 percent of the proposed research has been completed over the first eight and one-half months of the contract period.
Date: December 8, 1959
Creator: Perkins, Frank C. & Nachman, J. F. (Joseph F.)
System: The UNT Digital Library
Condensate System. Section II. Fifth Core I, Seed 1. Test Results DL-S-105 (open access)

Condensate System. Section II. Fifth Core I, Seed 1. Test Results DL-S-105

The purpose of the test was to fill the condensate storage tank and the Condensate System and obtain satisfactory preliminary operation. The components of the Condensate System performed adequately and satisfactorily with the exception of fill control valve (M9-VI). This valve (M9-VI) is not used in the current operation procedure.
Date: December 8, 1959
Creator: unknown
System: The UNT Digital Library
Nuclear Instrumentation Operation During Plant Operation. Section I. First Performance. Core I, Seed 1. Test Results DL-S-309, RNI-41 (open access)

Nuclear Instrumentation Operation During Plant Operation. Section I. First Performance. Core I, Seed 1. Test Results DL-S-309, RNI-41

The purpose of the test was to evaluate the operation of the Nuclear Instrumentation Power Range Amplifier during start up. While the station was operating at a gross load of 16.5 megawatts, a variation of 0, 8.5, 2.7 and 4.4 existed between the compensated ion chamber currents (CIC) and the test currents for channels A, B, C and D respectively. The off site modifications to channel C power range amplifier did not cause the ion chamber current and test current to be the same at 16.5 megawatts gross power. The modifications to channel C were made to correct for this deficiency.
Date: December 8, 1959
Creator: unknown
System: The UNT Digital Library