Resource Type

Language

Path Integral Monte Carlo Simulation of the Warm-Dense Homogeneous Electron Gas (open access)

Path Integral Monte Carlo Simulation of the Warm-Dense Homogeneous Electron Gas

None
Date: November 20, 2012
Creator: Brown, E W; DuBois, J L; Clark, B K & Ceperley, D M
System: The UNT Digital Library
sLine: A High Voltage Switcher ASIC for LCLS Detectors with Rolling Shutter (open access)

sLine: A High Voltage Switcher ASIC for LCLS Detectors with Rolling Shutter

None
Date: November 20, 2012
Creator: Caragiulo, P.; Dragone, A.; Herbst, R. & Haller, G.
System: The UNT Digital Library
Characterization of the eLine ASICs in prototype detector systems for LCLS (open access)

Characterization of the eLine ASICs in prototype detector systems for LCLS

None
Date: November 20, 2012
Creator: Carini, G. A.; Dragone, A.; Berube, B. -L.; Caragiulo, P.; Fritz, D .M.; Hart, P. A. et al.
System: The UNT Digital Library
eLine100: A Front End ASIC for LCLS Detectors in Low Noise Applications (open access)

eLine100: A Front End ASIC for LCLS Detectors in Low Noise Applications

None
Date: November 20, 2012
Creator: Dragone, A.; Caragiulo, P.; Freytag, D.; Hart, P.; Herbst, R.; Herrmann, S. et al.
System: The UNT Digital Library
CSPAD-140k - Experimental Applications at LCLS (open access)

CSPAD-140k - Experimental Applications at LCLS

None
Date: November 20, 2012
Creator: Herrmann, Sven; Boutet, S.; Carini, G.; Dragone, A.; Duda, B.; Freytag, D. et al.
System: The UNT Digital Library
Recent Improvements In Interface Management For Hanfords Waste Treatment And Immobilization Plant - 13263 (open access)

Recent Improvements In Interface Management For Hanfords Waste Treatment And Immobilization Plant - 13263

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the Waste Treatment and Immobilization Plant (WTP). The RPP mission is to store, retrieve and treat Hanford's tank waste; store and dispose of treated wastes; and close the tank farm waste management areas and treatment facilities by 2047. The WTP is currently being designed and constructed by Bechtel National Inc. (BNI) for DOE-ORP. BNI relies on a number oftechnical services from other Hanford contractors for WTP's construction and commissioning. These same services will be required of the future WTP operations contractor. The WTP interface management process has recently been improved through changes in organization and technical issue management documented in an Interface Management Plan. Ten of the thirteen active WTP Interface Control Documents (ICDs) have been revised in 2012 using the improved process with the remaining three in progress. The value of the process improvements is reflected by the ability to issue these documents on schedule.
Date: November 20, 2012
Creator: Arm, Stuart T.; Pell, Michael J.; Van Meighem, Jeffery S.; Duncan, Garth M. & Harrington, Christopher C.
System: The UNT Digital Library
Flat Plate FCG Experimental System for Material Studies (open access)

Flat Plate FCG Experimental System for Material Studies

None
Date: November 20, 2012
Creator: Goerz, D. A.; Reisman, D. B.; Javedani, J. B.; Paladichuk, J. T.; Hare, D. E.; Tallerico, L. J. et al.
System: The UNT Digital Library
eLine10k: A High Dynamic Range Front-End ASIC for LCLS Detectors (open access)

eLine10k: A High Dynamic Range Front-End ASIC for LCLS Detectors

None
Date: November 20, 2012
Creator: Dragone, A.; Caragiulo, P.; Carini, G. A.; Herbst, R.; Pratte, J. F.; O'Connor, P. et al.
System: The UNT Digital Library