Nuclear Superheat Quarterly Project Report: Twelfth Quarter, April-June 1962 (open access)

Nuclear Superheat Quarterly Project Report: Twelfth Quarter, April-June 1962

From introduction: "This is the twelfth of a series of quarterly reports which will cover the progress and results from the conceptual design, economic evaluations and research and development work performed by the General Electric Company as part of the Nuclear Superheat Project."
Date: March 1963
Creator: Pennington, R. T.
System: The UNT Digital Library
EVESR Nuclear Superheat Fuel Development Project: Third Quarterly Report, December 1962-February 1963 (open access)

EVESR Nuclear Superheat Fuel Development Project: Third Quarterly Report, December 1962-February 1963

Quarterly report describing progress on the EVESR Nuclear Superheat Fuel Development Project.
Date: March 1, 1963
Creator: Pennington, R. T.
System: The UNT Digital Library
General And Stress Corrosion Of High Nickel Alloys In Simulated Superheat Reactor Environment (open access)

General And Stress Corrosion Of High Nickel Alloys In Simulated Superheat Reactor Environment

It is the purpose of this report to summarize the results of the evaluation program carried out to-date on the high nickel alloys Inconel, Incoloy and Hastelloy-X in the out-of-pile superheat facilities as part of Task E of the Atomic Energy Commission sponsored Superheat Program.
Date: March 1963
Creator: Pearl, W. L. & Gaul, G. G.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses: Fifth Quarterly Progress Report December 1962-February 1963 (open access)

Accurate Nuclear Fuel Burnup Analyses: Fifth Quarterly Progress Report December 1962-February 1963

Work has continued on the development of Accurate Fuel Burnup Analysis. Work performed during the fifth quarter is summarized here.
Date: March 1, 1963
Creator: Rider, B. F.; Ruiz, C. P. & Peterson, J. P.
System: The UNT Digital Library
Two-Phase Pressure Losses: Fourth Quarterly Progress Report November 12, 1962 - February 12, 1963 (open access)

Two-Phase Pressure Losses: Fourth Quarterly Progress Report November 12, 1962 - February 12, 1963

This is the fourth quarterly report on the work done under Contract AT(04-3)-189. The results reported here have to do primarily with single-phase loss and two-phase pressure drop in the 1/4" x 1-3/4" rectangular channel in the flow up and flow horizontal orientations, and two-phase pressure loss across two contraction-expansion inserts in the 1/2" x 1-3/4" channel.
Date: March 1, 1963
Creator: Janssen, E. (Engineer) & Kervinen, J. A.
System: The UNT Digital Library