Collection
Serial/Series Title
Country
2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
Interim Report on Examination of Powder Metallurgy Slug from PT-105-313-4M
This report examines a uranium slug that has been produced by powder metallurgical methods and exposed in the 100-DR Pile and was deformed during pile exposure.
Date:
January 5, 1953
Creator:
O'Keefe, D. P.
System:
The UNT Digital Library
In-Line Scintillation Gamma Monitor : Preliminary Specifications
From introduction: "The following recommendations represent the best estimate, based on present knowledge, of the requirements for generally applicable or "universal" instrument for the continuous monitoring of radioactive process streams in terms of their gamma activity."
Date:
January 22, 1953
Creator:
Upson, U. L. & Connally, R. E.
System:
The UNT Digital Library