First Train on New Tracks
Caption says, "A-833 View of the first train to use the new relocated tracks of A.T. & S.F. Railroad."
Date:
February 25, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Concrete Placing
Caption says, "A-875 Progress of concrete placing on left abutment adjacent to the diversion channel. Note temporary cofferdam in channel for purpose of retaining a water supply and also for construction of lower stages of canal outlet trashrack structure."
Date:
June 25, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Dam
Photo of partially built dam with lumber scattered on both sides.
Date:
August 25, 1943
Creator:
Breitenstein, F. C.
System:
The Gateway to Oklahoma History
Progress Picture
Caption says, "A-877 View of the dam taken from the access road on the left abutment showing the progress to date and the outline of the balance of the foundation. Note the level of Lake Altus and the prominence of silt beds at elevation 1510."
Date:
June 25, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Progress Picture
Caption says, "A-876 View of right training wall taken from the top of the dam. The wall is approximately 95 percent complete."
Date:
June 25, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Concrete Placing
Caption says, "A-874 View of dam taken from right abutment showing the progress on concrete placing to date. The portion of the right abutment in the foreground is being made ready for concrete."
Date:
June 25, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Contraction Joint
Caption says, "A-878 View of the main portion of the dam taken from station 3+00 showing the contraction joint at station 4+25. Note the form cut in the center to allow the crane to pass the joint."
Date:
June 25, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History