Masonry Drainage

Caption says, "A-1097 Masonry drainage inlet at sta. 149+35 of Main Canal with laid up rock in place to be grouted."
Date: September 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Forms for Bench Flume

Caption says, "A-1033 Erecting forms for transition from outlet bench flume to earth canal section, Station 125+60. Specifications No. 1078, Morrison-Knudsen Co., Inc., contractor."
Date: May 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Rock Excavation

Caption says, "A-1031 Contractor's forces excavating rock cut at Station 88 in preparation for construction of inlet bench flume. Specifications No. 1078, river crossing of Main Canal."
Date: May 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Raised Bridge

Caption says, "A-997 Truss spans of C.R.I. & P. Ry. bridge across upper part of reservoir raised to final height, an average lift of 13 ft. 7-3/8 in., preparatory to building up concrete piers."
Date: March 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Completed Main Canal

Caption says, "A-1095 View of completed section of Main Canal taken from top of Altus Dam."
Date: September 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Excavating Footing of Drainage Culvert

Caption says, "A-1094 Specifications No. 1085. Dragline excavating for footing of draingage culvert under Altus Canal, Sta. 370."
Date: September 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Excavation of Slide

Caption says, "A-1098 View showing progress on excavation of slide at sta. 160 of Main Canal."
Date: September 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Farm Bridge Construction

Caption says, "A-1096 Farm bridge under construction over Main Canal, sta. 127."
Date: September 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Bench Flume Construction Progress

Caption says, "A-1032 View showing progress on construction of inlet bench flume for North Fork of Red River crossing of Main Canal, looking upstream at about Station 95+50. Specifications No. 1078."
Date: May 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Completed Section of Main Canal

Caption says, "A-1030 Completed section of Main Canal with protective rock blanket lining in place. View taken looking downstream from Station 44."
Date: May 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Dam Spillway

Caption says, "A-1028 View of Altus Dam spillways showing progress in construction of radial gate piers on controlled spillway."
Date: May 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Excavation of Main Canal

Caption says, "A-1029 Excavation of Main Canal through former site of field office buildings near Altus Dam."
Date: May 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Completion of Major Construction

Caption says, "A-1100 Altus Dam, with all major construction work of present program completed."
Date: September 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Completion of Major Construction

Caption says, "A-1099 Altus Dam, with all major construction work of present program completed."
Date: September 18, 1945
Creator: George, P. W.