Feasibility Report 100-DR WAPD Test Loop (open access)

Feasibility Report 100-DR WAPD Test Loop

The purpose of this report is to present a HAPO proposal for the design and construction of a high-temperature, high-pressure light water recirculation test facility for the Westinghouse Electric Corporation, Atomic Power Division This report does not attempt to justify the feasibility of site location nor does it attempt to elaborate on such technical considerations as permissible test specimen heat generation and enrichment requirements which have been covered in an earlier document. Instead, detail information is developed on the proposed design with major emphasis on detail descriptions of the proposed loop and auxiliaries, design and construction scheduling and costs, and operating costs.
Date: March 15, 1955
Creator: Engineering Department, Hanford Atomic Products Operation, General Electric Company
System: The UNT Digital Library
Division of Reactor Development Programs Monthly Report - February 1959 (open access)

Division of Reactor Development Programs Monthly Report - February 1959

Plutonium Oxide Fuels. Mixtures of PWR grade UO2 containing 10, 20, 30, 40, 50, and 60 w/o PuO2 were sintered in hydrogen for 44 hours at 1600 C to get additional data on solubility in this system. Densities of all the pieces were low, approximately 80 percent of theoretical; however, solid solution formation was complete in every case. The low density material should not affect lattice parameter values, but it did slightly reduce the intensity of the reflections.
Date: March 15, 1959
Creator: McEwen, L.H.
System: The UNT Digital Library