Resource Type
4 Matching Results
Results open in a new window/tab.
Results:
1 - 4 of
4
Shield element thermal shock test
None
Date:
September 10, 1968
Creator:
Morgan, L.P.
System:
The UNT Digital Library
Forward end cementing development
None
Date:
September 10, 1968
Creator:
Brickman, E.L.
System:
The UNT Digital Library
Status of special reactor process tube loadings, September 1, 1968
This report provides the status of production tests control tube loadings in reactor process tubes containing significant amounts of SS material.
Date:
September 10, 1968
Creator:
Walton, R. P.
System:
The UNT Digital Library
Amended calibration data for XE-2 gamma heating rate sensors (TE882 A, TE884 A, TE885 A, and TE886 A)
This report talks about Amended calibration data for XE-2 gamma heating rate sensors (TE882 A, TE884 A, TE885 A, and TE886 A)
Date:
September 10, 1968
Creator:
Hoff, R. G.
System:
The UNT Digital Library