FY07 Final Report for Calibration Systems (open access)

FY07 Final Report for Calibration Systems

Remote infrared (IR) sensing provides a valuable method for detection and identification of materials associated with nuclear proliferation. Current challenges for remote sensors include minimizing the size, mass, and power requirements for cheaper, smaller, and more deployable instruments without affecting the measurement performance. One area that is often overlooked is sensor calibration design that is optimized to minimize the cost, size, weight, and power of the payload. Yet, an on-board calibration system is essential to account for changes in the detector response once the instrument has been removed from the laboratory. The Calibration Systems project at Pacific Northwest National Laboratory (PNNL) is aimed towards developing and demonstrating compact quantum cascade (QC) laser-based calibration systems for infrared sensor systems in order to provide both a spectral and radiometric calibration while minimizing the impact on the instrument payload. In FY05, PNNL demonstrated a multi-level radiance scheme that provides six radiance levels for an enhanced linearity check compared to the currently accepted two-point scheme. PNNL began testing the repeatability of this scheme using a cryogenically cooled, single-mode quantum cascade laser (QCL). A cyclic variation in the power was observed that was attributed to the thermal cycling of the laser's dewar. In FY06, PNNL …
Date: December 1, 2007
Creator: Myers, Tanya L.; Broocks, Bryan T.; Cannon, Bret D. & Ho, Nicolas
System: The UNT Digital Library
Interior, Environment, and Related Agencies: FY2007 Appropriations (open access)

Interior, Environment, and Related Agencies: FY2007 Appropriations

This report is a guide to one of the regular appropriations bills that Congress considers each year. It summarizes the status of the Interior, Environment, and Related Agencies appropriations bill, its scope, major issues, funding levels, and related congressional activity.
Date: December 1, 2006
Creator: Vincent, Carol H.; Bearden, David M.; Corn, M. L.; Gorte, Ross W.; Humphries, Marc; Sheikh, Pervaze A. et al.
System: The UNT Digital Library
Technical Issues Map for the NHI System Interface and Support Systems Area: 1st Quarter FY 07 (open access)

Technical Issues Map for the NHI System Interface and Support Systems Area: 1st Quarter FY 07

This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway. The technical issues are ranked according to priority and by assumed resolution dates. Due to funding limitations, not all high-priority technical issues are under study at the present time, and more resources will need to be dedicated to tackling such issues in the future. This technical issues map is useful for understanding the relative importance of various technical challenges and will be used as a planning tool for future work package planning.
Date: December 1, 2006
Creator: Sherman, Steven R.
System: The UNT Digital Library
Texas Transportation Program Expenditures: 2007 (open access)

Texas Transportation Program Expenditures: 2007

Annual report detailing expenditures by the Texas Department of Transportation during 2007, including the unified transportation program (UTP), turnpike and toll road projects, and some rail facilities, as well as the amount of bonds, public securities, and other funds used for transportation projects.
Date: December 1, 2007
Creator: Texas. Department of Transportation.
System: The Portal to Texas History