Resource Type
Partner
Oklahoma Historical Society
41
UNT Libraries Government Documents Department
27
Sterling Municipal Library
9
Bellaire Friends Library & Historical Society
3
Carl Albert Congressional Research and Studies Center
2
Brownwood Public Library
1
Boy Scouts of America National Scouting Museum
1
Cuero Public Library
1
Hondo Public Library
1
Lockheed Martin Aeronautics Company, Fort Worth
1
5 More
Collection
Oklahoma Digital Newspaper Program
43
Office of Scientific & Technical Information Technical Reports
24
Texas Digital Newspaper Program
19
The Oklahoma City Times
12
Lawton Constitution
10
The Baytown Sun
9
Altus Times-Democrat
8
Tocker Foundation Grant
5
Chickasha Newspaper Collection
4
African-American Newspapers
3
17 More
Country
States
92 Matching Results
Results open in a new window/tab. Unexpected Results? Search the Catalog Instead.
Results:
1 - 24 of
92
next
FAST FLUX TEST FACILITY MONTHLY INFORMAL TECHNICAL PROGRESS REPORT NOVEMBER 1969
This r e p o r t was prepared by Battelle-Northwest under Contract No. AT(45-1)-1830 f o r the Atomic Energy Commission, Division of Reactor Development and Technology, to summarize technical progress made in the Fast Flux Test Facility Program during November 1969.
Date:
December 8, 1969
Creator:
Astely, E. R. & Cabell, C. P.
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for destruct subsystem
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Propellant-feed subsystem. Book 2: valves
None
Date:
December 1, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for electronic, power, instrumentation, and control
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for lower thrust structure
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for turbine inlet line
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for thrust structure subsystem
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Gimbal-assembly subsystem
None
Date:
December 1, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for instrumentation and control subsystem
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for turbine inlet line
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
External-shield subsystem
None
Date:
December 1, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for structural support coolant lines
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for pump discharge line
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for nozzle skirt extension
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for pressure vessel and closure subsystem
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for gimbal assembly subsystem
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Douglas United Nuclear monthly report, November 1969
This report presents details of the activities of Douglas United Nuclear at the Hanford site during the month of November 1969.
Date:
December 18, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
FAST FLUX TEST FACILITY CONCEPTUAL SYSTEM DESIGN DESCRIPTION FOR THE HEATING AND VENTILATION SYSTEM NO. 25
The Heating and Ventilation System provides the atmospheric conditions in FFTF as required to assure that plant objectives can be met in a safe and practical manner. Included are functions and design requirements, a physical description of the system, safety considerations, principles of operation, and maintenance principles.
Date:
December 5, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for propellant shutoff valve and actuator
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for pump discharge check valve and actuator
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Performance/design and qualification requirements for by-pass control valve and actuator
None
Date:
December 15, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Project Rulison: Post-Shot Plans and Evaluations
Project Rulison post-shot plans and evaluations are discussed and include physical characteristics of the Rulison cavity; pressure and temperature expected in the cavity; amount, nature, and distribution of radioactivity in the cavity; reentry plan; radioactive species which may be encountered during reentry; public safety considerations arising from release of radioactivity; procedures to assure public safety; and the radiological safety plan. Maximum hypothetical accidents and ecological considerations are discussed in the appendices.
Date:
December 1, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Feasibility study of the correlation of lifetime health and mortality experience of AEC and AEC contractor employees with occupational radiation exposure. Progress report number 5, August 1, 1968--July 31, 1969
None
Date:
December 31, 1969
Creator:
Mancuso, T.F.; Sanders, B.S. & Brodsky, A.
Object Type:
Report
System:
The UNT Digital Library
Richland O2 R and D Program: Semiannual report summary
The complete semiannual R and D report consists of this summary and two companion reports, one from DUN which covers reactors and another from ARHCO which covers separations. These companion reports are listed in the set of references in the back of this summary. This semiannual report covers progress in R and D during the first half of FY 1970. Development work on the Basic Production and Product Flexibility Programs has been consistent with funding levels. Increased emphasis has been placed on N Reactor operational problems as well as on assessing the K reactor inlet cooling piping integrity and zirconium hydriding problems. Work has been in progress to improve the Purex plant extraction performance by in-plant testing of the Zirflex Tonic effect. Developmental work was under way to establish either enriched uranium or nondefense plutonium (or both) as a reactor fuel and to provide further technology for the production of high-purity plutonium-238. Activities on the Environmental and Regulatory Technology Program are engaged in developing technology to assure safe operation of the Hanford project facilities. Major emphasis was placed on the study of metal-water (irradiated N fuels) reactions to simulate loss of coolant conditions. Increased emphasis has been placed on the …
Date:
December 31, 1969
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library